Skip to content
Website
🧱 CFC 250Drinking water: introduction, protection and meterChapter 3 of 10 in the section

Controlling pressure: pressure reducer, static pressure and water hammer

This chapter details how to control internal sanitary pressures according to Swiss rules. You will learn to set a pressure reducer precisely after the meter, to stabilise the static pressure to protect the fittings, and to position water hammer arresters at critical points to eliminate banging in the partition walls.

Key takeaways

  • Sanitary static pressure must not exceed five bar according to SIA 385/1.
  • The pressure reducer is installed directly downstream of the inlet filter after the main meter.
  • Setting is carried out at zero flow, then checked with simultaneous draw-off using a calibrated pressure gauge.
  • The mechanical water hammer arrester is fitted as close as possible to the quick-closing appliance causing the shocks.

Limiting the static pressure and adjusting the reducer downstream of the meter

In many communes of French-speaking Switzerland, water arrives from the public network with a high static head, often between six and ten bar, particularly at the foot of hillsides or near storage reservoirs. Allowing such energy into the internal pipework exposes the installation to premature deterioration: mechanical fatigue of brazed joints and press fittings, rapid wear of ceramic cartridges, continuous whistling when mixers are operated, and repeated leaks at the safety valves of water heaters. To ensure the durability of the internal network and limit noise according to the building's acoustic criteria, the sanitary installer must break this head right at the building entry.

The static pressure at the draw-off points must not exceed 500 kPa (5 bar). For acoustic reasons and user comfort, a flow pressure between 200 and 400 kPa (2 and 4 bar) is recommended.

norme SIA 385/1

The pressure reducer is always placed immediately after the water meter and the non-return valve, downstream of the back-flushing protection filter. Fitting a reducer without a protective filter exposes its diaphragm and stainless steel seat to sand grains and oxide particles torn from public mains, causing the valve to jam and the static pressure to rise gradually. The selected device must have removable fittings with captive nuts, an integrated inspectable strainer and threaded ports for a test pressure gauge upstream and downstream.

  1. Complete flushing of the supply riserFlush the connecting pipe thoroughly before inserting the device to remove residual hemp, metal swarf or construction site mud.
  2. Visual check of the upstream filterCheck that the filter cartridge upstream of the reducer is clean and that the flow direction indicated by the arrow on the brass body is strictly observed.
  3. Initial calibration of the preload screwClose all draw-off valves in the building. Loosen the locking nut, then turn the adjusting screw towards the plus sign to compress the spring or towards the minus sign to relax it, until 4.0 bar is read on the downstream pressure gauge.
  4. Dynamic check and lockingBriefly open two significant draw-off points to observe the dynamic pressure drop, which must not exceed 0.5 bar. Close them again, confirm that the needle settles clearly at the static set-point value and tighten the locking nut.

Identifying the propagation of the shock wave and fitting water hammer arresters

Water hammer is a violent pressure surge wave caused by the sudden interruption of water flow in a pipe. In practice, it arises when a washing machine or dishwasher solenoid valve, a timed tap in a public facility, or a single-lever mixer operated with a sharp movement closes instantaneously. The moving water column has kinetic energy proportional to its mass and to the square of its velocity. When the orifice closes in a fraction of a second, this mass slams against the shut-off element: the kinetic energy is converted into a static pressure peak that rebounds and travels back in the opposite direction at the speed of sound in the fluid, i.e. over one thousand metres per second.

Hydraulic behaviour of closures and stresses on the network
Shut-off deviceClosing timePressure surge generatedAction required on the construction site
Manual ball valve0.5 to 1.5 secondsLow to moderate (+1 to +2 bar)Gradual operation without any special device
Single-lever mixerLess than 0.3 secondsModerate to high (+3 to +6 bar)Reinforced sound-insulating clamps and careful pipe guidance
Household appliance solenoid valveLess than 0.05 secondsVery violent (may exceed 20 bar)Dedicated piston arrester must be fitted
Direct flush valve for WC0.1 to 0.2 secondsExtremely violent (+8 to +15 bar)Direct arrester and increased pipe section

This acoustic wave makes embedded or suspended pipes vibrate, loosens anchor bolts and causes sharp banging that resonates in lightweight plasterboard partitions. Structure-borne noise transmitted through rigid supports then jeopardises compliance with the sound insulation requirements of residential buildings. To dampen the shock, the use of dead-end sections forming an air pocket is ruled out: the water absorbs the stagnant air within a few weeks, making the pipe ineffective and creating a dangerous focus for legionella growth in a lukewarm dead leg.

Mechanical piston water hammer arrester
Sealed hydraulic device consisting of a cylindrical body containing a movable piston calibrated by a stainless steel spring or a sealed nitrogen chamber, designed to absorb the pressure peak without leaving drinking water stagnant.

Pipe fixing contributes directly to eliminating knocking noises. Multilayer or stainless steel pipes must be clamped using elastomer-lined clamps, spaced according to the pipe manufacturer's installation instructions, with no rigid contact with the masonry. Where a floor or lightweight wall penetration is crossed, the pipe is fitted with a flexible, continuous insulation sleeve. If these basic installation rules are not observed, art. 365 al. 3 CO reminds us that if a circumstance jeopardises the timely or proper execution of the work, the contractor must inform the client.

Static pressure control and operational setting according to SIA 385/1

Uncontrolled supply pressure is the main source of premature deterioration of seals, non-return valves and safety diaphragms in internal installations. SIA 385/1 and the SSIGE guidelines prescribe strict limitation of static loads to ensure the longevity of the networks and contain flow noise. In residential or office buildings, the static pressure at the draw-off points must not exceed the permissible threshold, failing which continuous mechanical stresses are placed on the connecting hoses and ceramic cartridges.

When the static pressure of the public network exceeds 5 bar, or when significant fluctuations are recorded on the supply pipe, installing a direct-acting pressure reducer immediately downstream of the meter and the fine filter becomes mandatory. The usual set-point on Swiss construction sites is between 3.5 and 4.0 bar. This value ensures sufficient dynamic pressure on the upper floors while protecting the terminal fittings against premature wear and throttling whistles.

  1. Purging and prior cleaning of the strainerClose the isolation valves upstream and downstream of the device. Unscrew the cup of the integrated filter or the upstream strainer to remove copper filings, sand grains or hemp residues from the connection work. Rinse thoroughly before any attempt at calibration.
  2. Differential measurement at zero flowConnect a calibrated pressure gauge to the downstream measuring port of the reducer. Close all taps in the building to stabilise the network. Loosen the locking nut, then turn the adjusting screw of the spring preload screw until the target static pressure is obtained.
  3. Dynamic check and sealing driftOpen a high-flow draw-off point to observe the dynamic pressure drop, which must not exceed 0.5 to 0.8 bar. Close the draw-off point and watch the downstream pressure gauge for ten minutes: a slow, continuous rise towards the upstream network pressure reveals a sealing defect of the valve or a foreign body on the seat.

Origin of water hammer and acoustic treatment at the source

Water hammer is a sudden pressure surge wave caused by the instantaneous stopping of a moving water column. This acoustic and mechanical wave propagates at a speed of around 1200 metres per second in metal and synthetic pipes. It is mainly generated by quick-closing appliances such as washing machine solenoid valves, industrial dishwashers, disconnectors or timed fittings with hard closing. The shock wave sets thin walls into resonance and transmits intolerable structure-borne noise through the building's lightweight partitions.

To eliminate these dynamic stresses effectively, the water hammer arrester must be fitted as close as possible to the disturbing component, at a maximum distance of 50 to 80 centimetres upstream of the solenoid valve. An arrester installed at the foot of a riser or in the boiler room does not dampen the local wave: the pressure peak has already struck the distribution bends and shaken the wall fixings before reaching the absorbing device.

Diagnosis and corrective measures for pressure and noise faults
Observed symptomHydraulic originConsequence for the worksCorrective action required
Sharp banging in the partition when the washing machine stopsSudden solenoid valve closure creating a Joukowsky waveLoosening of clamps, cracking of press fittings, noise nuisanceFit a mechanical diaphragm arrester on the machine's supply tee
Downstream pressure rising gradually at nightLeakage at the pressure reducer seatConstant dripping at the sanitary safety valve, stress on hosesRemove the reducer cartridge, clean the seat or replace the valve
Shrill whistling when a mixer is openedExcessive flow velocity due to static overpressureLocal cavitation, premature deterioration of ceramic cartridgesLower the general set-point pressure of the reducer below 4 bar
Continuous pipe vibrations during draw-offMechanical resonance combined with a lack of sound insulationTransmission of structure-borne noise in relation to acoustic comfort requirementsReplace rigid clamps with clamps with elastomer sound-insulating lining

Pipe fixing plays a decisive role in containing residual hydraulic shocks. The sanitary installer must ensure the systematic use of clamps lined with elastomer strips to prevent any direct contact between the pipe and the masonry. Floor and partition penetrations must be fitted with flexible, rot-proof sleeves. A pipe firmly anchored without elastic insulation turns the screed or partition into a sounding board, making even the most careful pressure settings pointless.

Troubleshooting overpressures and acoustic faults in service

When the installation delivers unstable pressure or transmits dull knocks against lightweight partitions, the plumber proceeds by methodical elimination. Faults almost always result from a maintenance failure of the reducer, a set-point unsuited to the local network, or a hydrodynamic arrester poorly positioned relative to the quick-closing components.

  1. Detecting static pressure driftClose all draw-off points and watch the downstream pressure gauge for thirty minutes. If the needle slowly climbs until it equals the supply network pressure, the reducer valve or seat is encrusted with scale or sand particles. Isolate the device, depressurise, remove the integrated filter cartridge and rinse the seat without scraping the sealing surfaces.
  2. Purging and checking the inflation of the arresterA diaphragm arrester that has become inoperative is often filled with water following a loss of nitrogen charge or a ruptured bladder. Remove the Schrader valve cap, check the pre-charge pressure with a tyre pressure gauge and readjust the air counter-pressure to about 0.2 bar below the regulated static pressure.
  3. Tracking down sound bridges along the pipe routeA sharp bang when a solenoid valve closes often reveals a clamp tightened directly on the copper or multilayer pipe without an elastomer lining, or rigid contact with the metal framework of lightweight partitions. Replace rigid fixings with sound-insulating clamps complying with the acoustic requirements of SIA 181.

If the banging persists despite a reducer set to 3.5 bar and compliant arresters, measure the flow velocity. Undersized terminal distribution pipes generate velocities above the usual recommendations of SSIGE directive W3, multiplying the shock wave when the flow stops instantaneously.

Frequently asked questions

Why does the pressure on the downstream gauge climb at night up to the network pressure?

This phenomenon indicates a sealing defect of the pressure reducer seat. At night, with no draw-off at all, the slightest metal particle or grain of sand trapped between the valve and its seat lets a trickle of water seep through. The downstream pressure then gradually equalises with the upstream pressure of the public network. The regulating cartridge must be cleaned or replaced.

Where exactly should a water hammer arrester be positioned on a sanitary installation?

The device must be installed as close as possible to the quick-closing component, ideally less than fifty centimetres upstream of the solenoid valve of the washing machine, dishwasher or timed fitting. Fitted too far away on the riser or at the foot of the service shaft, the arrester does not dissipate the initial shock wave, letting the jolt propagate and shake the intermediate wall fixings.

What static pressure is permissible according to SIA 385/1?

According to Swiss technical rules and SIA 385/1, the static pressure at the draw-off points must not exceed 5.0 bar, the recommended operating setting being between 3.0 and 4.0 bar at the central reducer. Above this value, mechanical stresses prematurely fatigue the ceramic cartridges, promote flow noise and significantly increase draw-off flow rates.

How can water hammer be distinguished from thermal expansion noise?

Water hammer produces a single dull detonation, synchronised exactly with the sharp closing of a tap or the triggering of a solenoid valve. Thermal expansion noise, by contrast, appears as a series of rhythmic cracks spread out over time, caused by the jerky sliding of the hot water pipework against its clamps or slab penetrations as it cools.

Texts and standards cited

  • SIA 385/1Domestic hot water installations in buildings - Calculation bases and requirements
  • SIA 181Noise protection in buildings

In the same section