Key takeaways
- The bathtub is always connected downstream of the washbasin to avoid any mutual hydraulic suction effect.
- SN EN 12056 limits the length of unvented pipes to four metres to the branch pipe.
- Each fixture requires its own minimum diameter before any junction onto an enlarged common floor pipe.
- Horizontal connections are made with 45-degree branches oriented in the direction of flow.
Understanding the mutual suction effect and ordering the connections on the branch pipe
When a standard 150-litre bathtub empties completely by gravity, the peak flow generated by a standard 50 mm diameter waste outlet easily reaches 0.8 to 1.0 litre per second. In a common horizontal connecting pipe, this sudden surge abruptly fills a major fraction of the internal hydraulic cross-section of the pipe. The water flows at high speed and pushes the air ahead of it while violently drawing the air located upstream. This air displacement creates an instantaneous pressure drop, that is, a pronounced hydraulic depression at all the secondary connections along the run. If the trap of a washbasin is connected to this same branch pipe without geometric precautions, this mutual suction forces out its minimum 50 mm water seal. The trap loses its seal within a few seconds, producing characteristic gurgling in the basin and allowing foul-smelling drain gases to rise freely into the bathroom.
- Place the washbasin at the head of the lineAlways connect the fixture with the lowest peak flow and the highest elevation upstream on the horizontal branch pipe. The washbasin trap benefits from this protected position, reducing the risk of its water seal being drawn out by an air draw from another fixture.
- Insert the bathtub discharge downstreamThe connection point of the bathtub waste must absolutely be located downstream of that of the washbasin, closer to the main discharge stack. The large discharge surge is thus evacuated directly towards the stack without disturbing the branch section serving the washbasin.
- Fit a 45-degree branch in the flow axisThe use of 90-degree tees on horizontal branch sections is strictly prohibited. Fit only 45-degree branches oriented in the direction of flow in order to guide the liquid flows without causing turbulence that destroys the air charge.
- Maintain a minimum distance between connectionsAllow a longitudinal spacing of at least 20 to 30 centimetres between the welds or sockets of two successive branches on the branch pipe. This mechanical interval prevents the formation of hydraulic shock waves and prevents turbulence at the fittings.
Sizing the diameters and observing the maximum lengths according to SN EN 12056
SN EN 12056 governs the design and sizing of gravity drainage installations inside buildings. In Swiss practice, professional rules impose a maximum filling ratio of 0.5 (i.e. 50% of the internal cross-section of the pipe) for any unvented connecting pipe receiving several sanitary fixtures. This permanent upper air cushion is essential to ensure the internal ventilation of the pipe, balance the dynamic pressures during flow and neutralise the mutual suction phenomenon between neighbouring traps.
| Sanitary fixture | Indicative flow (l/s) | Individual nominal diameter (DN) | Floor branch pipe diameter (DN) |
|---|---|---|---|
| Single washbasin | 0.5 | DN 40 / OD 40 | DN 50 / OD 50 |
| Domestic bathtub | 0.8 | DN 50 / OD 50 | DN 60 / OD 63 or DN 70 |
| Shower without tray | 0.6 | DN 50 / OD 50 | DN 60 / OD 63 or DN 70 |
| Washbasin + bathtub group | 1.3 combined | Separate individual pipes | DN 70 / OD 75 minimum |
As soon as the developed length of the unvented branch pipe exceeds four metres, or when it includes more than three 45-degree changes of direction, air friction and water velocity cause critical depressions that inevitably break the trap seals. The installation gradient must be strictly maintained between 1.0% and 2.0%. A gradient below 1% causes stagnation of greasy water and solid deposits that reduce the useful cross-section of the pipe. Conversely, a gradient above 5% makes the water fall too quickly relative to the air, which initiates a hydraulic piston effect that is highly destructive for water seals. Where slab constraints or the distance of the service ducts prevent these limits from being met, fitting a certified auxiliary air admittance valve or running a vented relief pipe becomes essential.
Geometry of the connections and physical arrangement on the common branch pipe
To prevent a massive bathtub discharge from emptying, by depression, the trap of a washbasin located nearby, increasing the diameter alone is not enough: the geometry of the insertion onto the combined connecting pipe determines the stability of the water seals. When the large flow of a bathtub fills the pipe section, it creates a moving hydraulic piston. Immediately upstream of this liquid plug a zone of strong depression forms, which literally draws the water out of neighbouring traps if the connection has been made in a straight line or at an unsuitable angle.
The basic rule on site is never to connect a small-diameter trap directly facing the inlet of a fixture with a high unit flow, nor immediately downstream on the same horizontal axis. Any secondary connection serving a washbasin must join the common branch pipe from above or at an ascending angle of 45 degrees relative to the invert of the main pipe. This local elevation ensures that the depression wave slides beneath the discharge opening without drawing out the water seal through dynamic entrainment.
| Type of connection | Angle on the branch pipe | Observed hydraulic behaviour | Compliance with SN EN 12056 |
|---|---|---|---|
| 90° square tee in the horizontal plane | 90° horizontal | Backflow of foam towards the washbasin and sudden siphonage | Non-compliant (prohibited for fixture connections) |
| Single 45° wye flat on the axis | 45° horizontal | Risk of mutual suction if the distance between connections is less than 30 cm | Tolerated with sufficient spacing |
| 45° wye tilted upwards | 45° with axial rotation of 30° to 45° | Optimal protection of the water seal, air passage preserved at the top of the pipe | Recommended in standard sanitary installations |
| Double branch face to face (cross) | 90° or 45° symmetrical | Direct cross-projection of waste water and systematic trap siphonage | Non-compliant (prohibited without axial offset) |
The order of the connections along the horizontal pipe run towards the discharge stack determines the long-term reliability of the system. The fixture most sensitive to suction, namely the washbasin fitted with its trap of 32 or 40 mm diameter, must systematically be connected at the head of the branch pipe, as far upstream of the flow as possible. The bathtub and the shower, whose discharge flows are markedly higher, must be connected downstream of the washbasin. In this way, the flow discharged by the tub moves away from the basin trap instead of passing in front of its air inlet opening.
Remedial measures, air admittance valves and checking trap retention
In heavy renovation situations or in tight technical spaces in a prefabricated service duct, observing the minimum distances or separating the routes is not always physically feasible. When the bathtub discharges less than 50 centimetres from the washbasin connection, mutual suction becomes unavoidable without an additional air supply. Installing an air admittance valve (diaphragm vent) directly on the washbasin waste pipe, upstream of the trap and above the highest possible overflow level, resolves the airflow conflict by injecting ambient air as soon as the depression begins.
Final validation of the work is carried out on the construction site by a dynamic simultaneous discharge test before the ducts and bath panels are closed. The sanitary installer fills the bathtub up to its overflow, opens the waste fully, and observes the behaviour of the liquid column in the adjacent washbasin. The trap must show no gurgling noise and no downward oscillation of its water seal greater than 25 mm. If the trap loses its seal, the gradient must immediately be corrected, an upward-offset wye inserted or the secondary ventilation reviewed before any handover of the sanitary work package.
Loss of trap seal observed at commissioning: remedial methodology
When a washbasin gurgles or loses its water seal while the bathtub is emptying, the geometric defect is established. At acceptance stage, this mutual suction phenomenon is an execution defect that compromises the hygiene of the work by allowing drain gases to enter the bathroom. The installer must immediately identify whether the problem stems from a bathtub connected upstream of the washbasin, a reduced gradient or a non-compliant connection distance on the floor branch pipe.
- Visual check and depression measurementMeasure the water seal remaining in the washbasin trap after the large tub has been emptied completely. A loss of more than 25 mm indicates an unacceptable depression in the common connecting pipe.
- Looking for access in the suspended ceiling or ductCheck whether it is possible to work under the slab or in the service duct before any screed is demolished. If the branch pipe is accessible from below, separate the two flows as far as the stack.
- Modifying the upstream connectionsMove the connection wye to position the bathtub directly downstream of the washbasin. Replace the straight tees with 45-degree branches to guide the flow without obstructing the section.
- Fitting an air admittance valveIf the embedded run remains inaccessible without breaking the tiles, fit a diaphragm air valve directly on the washbasin trap pipe to break the local depression.
If walls and screeds prevent any heavy modification without disproportionate costs, fitting a specific anti-vacuum trap or increasing the water seal to 70 mm is the last technical resort. The installer records this adaptation on the as-built drawings and documents the correct hydraulic operation by a joint test in the presence of the site management.
Frequently asked questions
Why does the bathtub draw the washbasin trap and never the reverse?
The bathtub discharges a massive volume of water at a high flow rate that temporarily fills the entire section of the branch pipe. This liquid plug creates a hydraulic piston and a strong air depression upstream. The washbasin, located upstream with a small volume of water and a water seal of fifty millimetres, has its trap drawn immediately, whereas emptying a washbasin never blocks the main branch pipe.
What minimum distance must be observed between two connections on a branch pipe?
SN EN 12056 recommends spacing the connections at least two times the diameter of the branch pipe apart to avoid turbulence and pressure-wave interference. On an unvented pipe of a given nominal diameter, an interval of at least two hundred millimetres between the axis of the washbasin connection and that of the bathtub ensures airflow stability and prevents sudden blocking of the air supply during emptying.
Can a washbasin and a bathtub be connected to the same pipe without risk?
Yes, provided the hydraulic order and the diameters are scrupulously observed. The washbasin must be connected as far upstream as possible on the floor branch pipe. The bathtub is then connected downstream via a forty-five-degree branch oriented in the direction of flow. The common branch pipe must have a sufficient diameter and a regular gradient of at least one and a half per cent to the main discharge stack.
How do you test for odour tightness before the fixtures are finally installed?
Before the final laying of tiles and fixtures, the installer temporarily plugs the open ends and carries out a hydraulic test or a smoke test at low pressure. To confirm the absence of mutual suction after temporary connection, the bathtub and the washbasins are filled simultaneously. Complete emptying is then triggered while observing the water level in the test traps to detect any abnormal oscillation.
Texts and standards cited
- SN EN 12056Gravity drainage systems inside buildings: design, calculation and installation rules for fixture pipes and floor branch pipes.
