Key takeaways
- The SSIGE guidelines prohibit any direct connection without protection suited to the hazard class.
- A simple anti-pollution check valve never protects against toxic substances of class four or five.
- Hazardous fluids of class five absolutely require total separation by a visible air-gap overflow.
- The testable reduced-pressure-zone disconnector requires documented annual maintenance.
Classify the risk level according to the fluids to eliminate false safeguards
Drinking water distribution inside a building tolerates no technical compromise. The fundamental rule of sanitary engineering prescribes that distributed water must under no circumstances be able to flow back into the public main or into the supply sections of pure sanitary appliances. Every connected installation is a potential source of contamination through back-siphonage or back-pressure. The SSIGE guidelines define the risk typology precisely by classifying fluids into five distinct categories according to their degree of harm to the human body.
| Class | Fluid description | Examples of installations | Minimum protection required |
|---|---|---|---|
| Class 1 | Water intended for human consumption coming directly from the public network | Ordinary sanitary fittings, washbasins, hygiene showers | No specific upstream protection required |
| Class 2 | Fluid presenting no health hazard but altered in taste, odour or temperature | Indirect water heaters, professional coffee machines, chilled water fountains | Testable check valve type EA or simple check valve EB |
| Class 3 | Fluid presenting a slight hazard due to the presence of low-toxicity substances | Central heating without toxic additives, regenerating water softeners | Non-testable disconnector type CA |
| Class 4 | Fluid presenting a serious health hazard due to toxic substances | Heating circuits with chemical inhibitors, fire-extinguishing systems | Testable reduced-pressure-zone disconnector BA |
| Class 5 | Fluid presenting a lethal hazard or a microbiological and viral pathogenic hazard | Cattle drinking troughs, medical laboratories, irrigation basins with fertiliser | Total overflow with air gap type AA or AB |
The choice of equipment rests on a systematic analysis of the chemicals likely to come into contact with the water network. Filling of technical installations is the most frequent trap on construction sites. As soon as a fluid contains antifreeze, biocides or anticorrosives, the whole falls under class 4. Using a removable hose does not relieve the installer: a fixed or temporary connection without a suitable disconnector directly breaches the recognised rules of the trade.
Installing hydraulic disconnectors and organising their verifiable maintenance
Installing a type BA disconnector requires compliance with strict spatial and hydraulic constraints. The device comprises two check valves separated by an intermediate chamber vented to atmosphere as soon as the pressure difference between upstream and the intermediate zone becomes insufficient. This device must be installed in a frost-free, ventilated room that is fully accessible and never liable to flooding. The discharge from the relief valve must never be connected directly and tightly to the drain pipe.
- Fitting the discharge sleevePosition the disconnector horizontally, observing the standardised air gap between the device's drain nozzle and the open trapped discharge funnel.
- Fitting the valves and the upstream filterAlways fit a rinsable strainer filter immediately upstream, together with tight isolating valves, so that the device can be isolated without draining the riser.
- Commissioning and flushingFlush the section thoroughly before applying differential pressure, to avoid immediate blocking of the diaphragms by cutting swarf or hemp fibre.
BA disconnectors must undergo a mandatory annual check by a sanitary installer holding a specific certification. This test is carried out using a differential test kit connected to the three pressure tapping points of the device. The technician measures the opening pressure of the relief valve and the absolute tightness of the upstream and downstream check valves under various flow configurations.
Selecting disconnection devices: from the standard check valve to total overflow
The SSIGE guidelines establish a strict hierarchy for the protection of the drinking water distribution network. The connection of technical equipment is never decided on the cost of the fittings, but on the exact nature of the substance likely to come into contact with the supply network. A standard mechanical non-return valve, type EA or EB, offers only precarious tightness against fluid backflow by back-siphonage or back-pressure. It is limited to class 2 fluids, that is, water with no toxicological hazard but with minor alterations in temperature or taste. As soon as a fluid contains harmful chemical components or pathogenic biological matter, the guidelines prohibit the simple mechanical valve in favour of devices with a physical air break.
| Use or equipment | Fluid class | Minimum device permitted | Mechanical operation |
|---|---|---|---|
| Domestic hot water heater without additives | Class 2 | Testable check valve (EA) | Simple mechanical shut-off with upstream test point |
| Heating circuit without additives | Class 3 | Non-testable disconnector (CA) | Double check valve with intermediate zone vented to atmosphere |
| Heating with antifreeze or inhibitors | Class 4 | Testable disconnector (BA) | Reduced-pressure intermediate chamber with visible discharge |
| Buried irrigation or rainwater tank | Class 5 | Total overflow with air gap (AA or AB) | Absolute physical separation with no continuous hydraulic link |
For class 5 fluids, physical separation by total overflow remains the only recognised technical barrier. Automatic irrigation installations fitted with buried nozzles in contact with fertilisers, or networks using roof water, may under no pretext remain connected directly to the drinking water network by means of a hydraulic disconnector. The installer fits a disconnection tank equipped with a standardised overflow of type AA or AB. The drinking water top-up takes place above the overflow level with a free air gap, preventing any suction by back-siphonage. Secondary distribution to the irrigation system or the toilet cisterns is then provided by a booster set completely decoupled from the upstream network.
Periodic inspection, test protocol and operational validation
Installing a testable reduced-pressure-zone disconnector of type BA does not relieve the operator of regular operational monitoring. Suspended impurities carried by the water, limescale deposits and ageing of the elastomer diaphragms inevitably degrade the differential trigger thresholds. The SSIGE guidelines prescribe a rigorous commissioning with a test report, followed by an annual inspection carried out with a calibrated pressure-gauge test kit. The aim of the intervention is to confirm that the relief valve opens before the differential pressure between upstream and the intermediate zone falls below the critical value.
- Preparing and isolating the lineCheck the flow direction, flush the upstream filters to remove filings or particles, then close the upstream and downstream isolating valves to stabilise the middle chamber.
- Connecting the differential test kitConnect the measuring hoses to the test points on the disconnector body to measure the upstream, intermediate and downstream pressures accurately.
- Measuring the discharge opening thresholdSimulate a pressure drop upstream by operating the needle valves of the test kit and check that discharge to atmosphere occurs as soon as the calibrated threshold is crossed.
- Check of the tightness of the check valvesCheck the perfect tightness of the upstream check valve under service pressure, then check the downstream check valve under artificial back-pressure to rule out any backflow towards the middle zone.
Each maintenance and inspection intervention results in a detailed technical record, entered in the installation's technical file and kept available for inspectors of the municipal water supplier. In the event of non-conformity, in particular if the differential threshold is no longer met or if the downstream check valve shows seepage, the installer carries out a complete overhaul by replacing the factory pre-calibrated modular cartridge. This methodical rigour guarantees the absolute harmlessness of the network and protects users against insidious contamination caused by backflow of technical fluids.
Protection failure or network pollution: emergency protocol and restoration
When a tightness failure occurs on an upstream or downstream check valve, or when backflow of industrial fluid is detected on a drinking water pipe, the sanitary installer intervenes with a rigorous method. The first operation is to close the tight isolating valves located immediately upstream and downstream of the disconnection device in order to hydraulically isolate the affected zone. If the supplied equipment requires an uninterrupted water supply, the temporary supply requires absolute physical separation by total overflow or the connection of a compliant mobile disconnection module, excluding any temporary bridging with a simple garden hose.
- Immediate lock-out: close the upstream and downstream isolating valves, fit lock-out padlocks and safely drain the intermediate volume.
- Mechanical inspection: remove the control chambers, extract the upstream filter cartridges and visually check the elastomer seal seats.
- Pollution alert: immediate notification to the water supplier in the event of proven ingress of a class 3, 4 or 5 fluid into the internal distribution.
- Decontamination of the section: high-pressure counter-current flushing, approved chemical disinfection according to the SSIGE guidelines and bacteriological compliance analyses.
The lock-out is lifted only after a complete functional test carried out with a calibrated pressure-gauge test kit. The qualified sanitary craftsman checks the minimum differential pressure triggering discharge to atmosphere as well as the perfect tightness of the downstream check valve under back-pressure. An official test report is drawn up, filed in the sanitary log of the plant room and sent to the municipal water supplier, ensuring the legal and technical compliance of the installation before the valves are generally reopened.
Frequently asked questions
Can a BA disconnector be connected directly to the drain without a funnel?
No, direct connection is strictly prohibited. A hydraulic disconnector of type BA must always discharge its water through a visible free air gap above a standardised funnel. This atmospheric overflow prevents any accidental siphoning of effluent from the waste water network towards the intermediate chamber if the drain pipes become surcharged. The drain must be able to accept the instantaneous nominal discharge flow of the device.
Why is a simple check valve not enough for a heating top-up?
Heating water contains corrosion inhibitors, dissolved scale and metal residues, which places it among the chemical-risk fluids. A simple mechanical check valve carries an unavoidable risk of fouling or of the seat being blocked by solid impurities. In the event of negative pressure in the sanitary network, the contaminated fluid would flow back directly into the drinking water circuit. A certified disconnector guarantees a visible discharge to atmosphere as soon as the seal weakens.
Who is allowed to carry out the periodic inspection of a BA disconnector in Switzerland?
The annual inspection of testable disconnectors is the exclusive responsibility of sanitary installers or maintenance technicians holding a specific certification recognised by the SSIGE. These specialists have pressure-gauge test equipment calibrated regularly and apply the official test procedure. Only a report signed by a certified operator is accepted by the municipal water suppliers and entered in the building's technical register to discharge the owner's liability.
Which protection should be chosen for the supply of an automatic irrigation system?
Water in buried irrigation stagnates in contact with the soil and is exposed to bacteria, fertilisers and pesticides, which makes it a class 4 or 5 fluid. If the sprinklers are at ground level with a risk of immersion, total separation by an air break of type AA or AB with free overflow is mandatory. A BA disconnector may be suitable only if the nozzles are protected against immersion and no chemicals are added.
Texts and standards cited
- Directives SSIGE W3Guidelines for drinking water installations: general principles of safety and distribution hygiene
- Directives SSIGE W3/E1Protection against backflow in sanitary installations: fluid classification and selection of disconnectors