Tests, damage incidents and installer safety: the execution reference
This section brings together the inspection methods and safety rules that every plumbing installer needs on Swiss construction sites. From the initial pressure test to the as-built file, it details the technical protocols for certifying the tightness of networks, responding methodically to a water-damage incident and protecting fitters' physical integrity during high-risk operations such as core drilling, work with a flame or connections in trenches.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
1 m 50
Excavation depth requiring mandatory shoring or battering
1.1 times
Minimum pressure for the hydraulic test, relative to the service pressure
150 hPa
Preliminary air test pressure for leak detection
2 hours
Minimum monitoring required after completing work with an open flame
Technical scope: validating networks and protecting those working on site
The plumbing installer's field of work ends where the responsibilities of the adjacent trades begin. This section deals exclusively with the distribution of cold and hot drinking water, its pressurisation, the stacks and internal gravity drainage collectors, and the direct safety of plumbing fitters. Heat production, balancing of heating circuits and generators are the heating engineer's responsibility. Likewise, controlled mechanical ventilation ducts belong to the ventilation installer, the screed embedding of pipework to the screed layer, and waterproofing under tiling to the tiler-waterproofer.
On the legal and organisational side, the section focuses on providing technical proof before service shafts and ducts are closed. It excludes the detailed costing of repairs after an incident, which falls under the preparation of tenders and insurance assessment. Under art. 82 LAA, the employer must take all measures to prevent occupational accidents and diseases that experience has shown to be necessary, that the state of the art makes it possible to apply and that are suited to the given conditions, while workers use their personal protective equipment.
- Hydraulic and pneumatic leak tests in accordance with SSIGE guidelines.
- Documentary traceability of test reports before backfilling or closing partition walls.
- Emergency isolation and immediate technical management of a water leak.
- Safety during core drilling, wall cutting and brazing work.
- Safe connections in an open excavation close to the foundation slab.
Application pathway: from pressurisation to the as-built file
To guarantee the soundness of the installations and protect the profitability of the construction site, the chapters should be tackled in strict chronological order. The installer begins with the mandatory preventive checks. The hydraulic test is the fundamental contractual milestone for detecting joint leaks before any pipework is concealed. Where frost is a threat or strict hygiene criteria forbid standing water before handover, the compressed-air or inert-gas test is required, at suitable pressures to prevent any risk of bursting.
- Preliminary checks and testsCarry out the leak test with water or air in accordance with SSIGE guidelines, record the results in a joint test report and have it signed by site management.
- Risk control and crisis managementApply the isolation sequence without delay in the event of an accidental discharge, record the damage, locate the faulty connection and manage the technical drying.
- Operational safety of fittersPut in place protection against silica dust, drill noise, the hot-work permit for brazing and trench shoring.
- Closure and as-built recordsRemove rubble and used fixtures through the sorting channels, then consolidate the project file with as-built diagrams and valve data sheets.
If a failure occurs or an unpressed fitting is put under load, the section on damage incidents sets out the reflex actions: closing the main valve, immediate photographic record and formal notice in accordance with standard SIA 118. Assessing drying in depth avoids the trap of screeds that are dry at the surface but damp where they contact resilient insulation.
The fitter safety section then addresses everyday physical risks. Suppressing mineral dust during core drilling protects the airways, while strict control of the hot-work permit protects workers and timber structures against residual flame outbreaks. Finally, the orderly removal of dismantled sanitary fixtures precedes the handover of as-built plans, sealing the formal acceptance of the plumbing works.
📘 Chapters in this section 10
The leak-tightness test: pressure, duration, permitted drop and test report
Master the pressure steps and draw up a leak test report that is legally unassailable.
Tests, claims and the installer's safetyAir testing: when it is preferable, reduced pressure and the risk of compressed air
Carry out your pneumatic tests safely, without risking pipe explosion or contaminating the water network.
Tests, claims and the installer's safetyWater damage: shut off, record, photograph, report, in that order
Apply the reflex sequence for the first minutes to contain the leak and preserve your rights.
Tests, claims and the installer's safetyThe forgotten fitting: proof of the defect, civil liability and recourse
Demonstrate the material cause of a missed pressing to insurance experts and the client.
Tests, claims and the installer's safetyDry before closing up: moisture measurement, real duration and the surface-drying trap
Measure the residual moisture at the core of the screed before authorising the closing of ducts.
Tests, claims and the installer's safetyCore drilling and drilling: noise, silica dust and tool vibration
Drill concrete slabs without ruining your hearing or filling your lungs with silica.
Tests, claims and the installer's safetyWorking with a flame: hot work permit, screen, supervision and fire extinguisher
Secure every torch-brazed joint by applying the hot-work permit and the heat shield.
Tests, claims and the installer's safetyGoing down into a trench: shoring, access, existing pipes
Connect the water service entry at the foot of the building without risking burial in an unstable trench.
Tests, claims and the installer's safetyEmptying a bathroom: ceramics, furniture, mirrors and a skip that fills up fast
Quickly clear ceramic and cast iron from a strip-out while keeping skip costs under control.
Tests, claims and the installer's safetyThe as-built file: as-built drawing, valves, protection devices and tests
Gather the as-built diagrams and conformity certificates that guarantee acceptance of the works without reservations.