🧱 CFC 250Drainage: stack, primary ventilation and sound insulationChapter 6 of 10 in the section

Draining below the collector level: lifting station, non-return valve and pumped discharge

This chapter details the protection of underground rooms against backflow from the public sewer in accordance with SN EN 12056. You will learn how to determine the backflow level, how to choose between a passive non-return valve and an active lifting station, and how to install a discharge loop with a high-level alarm to secure basements.

Key takeaways

  • Every sanitary fixture below the backflow level requires mechanical protection or motorised lifting.
  • The backflow level corresponds to the upper level of the roadway or municipal kerb.
  • The non-return valve requires a continuous gradient, direct access and rigorous six-monthly maintenance.
  • The lifting discharge pipe must form a loop rising above the backflow crest level.

Define the backflow level and fit a compliant non-return valve

During intense storms or blockages of the public drainage network, the municipal collector goes under pressure from hydrostatic head. Without a watertight isolation device, wastewater and rainwater flow back into buildings according to the physical principle of communicating vessels. Sanitary fixtures located in the basement, such as floor traps, showers, wash basins or toilet bowls, are the first overflow points if their installation level lies below the critical level defined by the municipal technical services.

Backflow level
According to SN EN 12056, the maximum elevation that water can reach in a public drainage network under surcharge. In French-speaking Switzerland, it generally corresponds to the upper level of the roadway or the top edge of the pavement kerb at the connection point.

Fitting a passive non-return valve is a purely mechanical solution for blocking gravity backflow. However, SN EN 12056 formally restricts its use: the drainage gradient towards the collector must be natural, the rooms served must be of secondary use with no significant commercial value, and users must be able to forgo using the fixtures for the duration of the backflow. For foul water containing faecal matter, the device must include a motorised, automatically closing valve combined with a manual emergency control.

  • Six-monthly check of the cleanliness of the inspection chamber and removal of grease or sand deposits.
  • Check of the free movement of the moving flap and of the operation of the manual locking lever.
  • Cleaning and greasing of the elastomer perimeter sealing gasket with a neutral silicone grease.
  • Back-pressure leak test by controlled filling of the valve body.

The plumbing installer must document each maintenance operation in the installation's maintenance logbook. If the plans supplied provide for direct gravity connection of basement fixtures without protection, the contractor reports the anomaly. In accordance with art. 365 al. 3 CO, if a circumstance jeopardises the proper execution of the work, the contractor informs the client.

Install the lifting station, the anti-backflow loop and the level safety device

As soon as the basement contains living spaces or commercial activities, or where gravity drainage cannot be ensured at all times, installing a motorised lifting station becomes mandatory under SN EN 12056. This active system collects the effluent in a gas-tight and odour-tight tank, then pumps it under pressure to the municipal network by means of a submersible motor-pump unit fitted with macerating impellers or full free-passage vortex impellers.

  1. Anchoring the lifting tankPlace the tank on the blinding concrete slab of the plant room. Make a mechanical anchorage that resists buoyancy in the event of a rise in the water table.
  2. Making the discharge loopRun the discharge pipe vertically until it exceeds the backflow level by at least 300 mm. Form an inverted siphon with two 90-degree bends before dropping back towards the gravity collector.
  3. Fitting the isolating and non-return componentsOn the rigid discharge pipe, install from bottom to top: a removable anti-vibration coupling, a wastewater-type ball non-return valve, and a full-bore isolating valve.
  4. Connection of the tank ventilationInstall an independent primary ventilation pipe up to above the roof to ensure air renewal and balance variations in hydraulic pressure.
Selection criteria between non-return valve and lifting station
Operating parameterMechanical non-return valveMotorised lifting station
Nature of the effluentGrey water without faecal matter (except specific motorised models)Foul water containing faecal matter and grey water accepted without restriction
Continuity of serviceComplete interruption of drainage as soon as the network is under surchargeContinuous drainage guaranteed even during external flooding
Required gradientContinuous downward gradient towards the public collector is mandatoryIndependent of gradient, lifting possible over several metres
Backflow protectionEnsured by the watertight closing of a mechanical flapAbsolutely guaranteed by the crest of the discharge loop

Safety management relies on reliable detection of the water level in the sump. In addition to the control floats that start and stop the pumps, the control unit must include a fully independent high-level alarm. This piezometric sensor or dedicated float triggers an 80-decibel audible alarm and a flashing visual signal as soon as the maximum set level is exceeded.

Definition of the backflow level and crossing it with an anti-backflow loop

During a violent storm or a temporary overload of the public combined sewer, the water line in the street collectors rises under surcharge until it reaches the road surface. In any building whose basement contains drainage points located below this reference level, hydrostatic pressure pushes wastewater or mixed water into the private connection pipes. If the drains are connected for gravity flow without a suitable shut-off device, water from the public network flows back into the underground rooms through floor traps, wash tubs or toilet bowls, causing major damage.

Backflow level of the collector
Maximum elevation that wastewater can reach in the public network during floods or exceptional storms. According to Swiss rules and SN EN 12056, it corresponds by default to the top water line of the roadway or pavement at the connection point, unless the municipal drainage regulations set a different reference level.

For underground rooms housing drainage below this critical level, SN EN 12056 prescribes active pumped discharge by a lifting station where the fixtures must remain operational during rises in water level or where they serve habitable dwellings. The pressure discharge pipe must never be tapped directly into a gravity collector without physically crossing the flooding line: it rises vertically above the level of the public road to form an anti-backflow loop, then drops back down to connect to the building's main collector.

Installation in an underground pit, maintenance of components and level alarm

In an underground room or technical boiler room, installing a lifting tank or a lifting chamber below the floor slab requires a gas-tight and odour-tight separation. The gravity inlet, discharge and secondary ventilation pipes to the roof must be assembled with joints resistant to faecal matter and grease. Immediately after the pump's discharge flange, the pressure pipe includes a ball or damped-flap non-return valve, followed by a full-bore shut-off valve allowing the unit to be isolated during maintenance operations.

Selection criteria and installation constraints by type of protection below the backflow level
DevicePermitted field of applicationHydraulic constraintPeriodic maintenance protocol
Lifting chamber with anti-backflow loopAll fixtures below the backflow level (foul water and grey water)Minimum free passage according to the pump's particle size (often 40 to 50 mm)Six-monthly inspection: tank cleaning, float check and valve test
Automatic non-return valve with motorised closingSecondary rooms without continuously occupied living spaces, technical roomsConstant minimum gradient of 1.5 % to 2 % to ensure self-cleansing upstreamQuarterly check: cleaning of the seats, manual check of the locking
Simple mechanical flap valveRainwater or drainage water below the road (strictly prohibited for foul water)Gravity drainage only, head loss to be included in the calculationAnnual removal of the cover, descaling of the flap and replacement of the gasket

Maintenance of a non-return valve installed in a pit or on a lifting riser is decisive. Solid deposits, wipes and grease tend to build up on the seat bearing surface or around the pivot axis. The plumbing technician must be able to open the inspection hatch without draining the entire downstream network, which requires first closing the shut-off valve located downstream of the non-return valve. After removing the cover, the seat is cleaned with clean water using a non-metallic brush, the valve is operated by hand to check its free movement, and the cover's sealing gasket is systematically checked before retightening to the prescribed torque.

  1. Checking the level probes and floatsCheck the free movement of the control floats (start, stop) and verify that no grease deposit hinders their tilting at the bottom of the retention pit.
  2. Positioning of the high-level alarm floatFix the overflow alarm sensor at least 100 mm above the switch-on threshold of the standby pump, while remaining below the invert of the lowest inlet pipe.
  3. Testing the alarm interlock and signallingManually trigger the high-level switch to validate the local audible alarm, the indicator light on the cabinet and any transmission to the building's technical management system.
  4. Connection of the standby buffer batteryCheck the presence and charge of the internal battery in the control unit, which is essential to guarantee the acoustic alarm signal in the event of a simultaneous power failure.

Backflow incident or lifting failure: crisis management and restoring compliance

During a ten-year storm, the surcharging of the public collector pushes combined water back into the private pipes. In the absence of a watertight device below the backflow level defined by SN EN 12056, the basement floods through floor traps, wash tubs or the lifting tank. The same disaster occurs if the non-return valve is blocked by stringy fibres or if the pump fails without prior warning.

  1. Securing and emptying the roomClose the manual lock of the non-return valve if it exists and remains accessible, in order to stop backflow from the municipal network. Remove the residual water using a standby cellar pump discharging outside, above the road overflow level. Clean and disinfect the floors before any mechanical work.
  2. Leak-tightness check and cleaning of componentsRemove the inspection cover of the non-return valve. Clean the elastomer flap, the bearing surface and the pivot axis, which are often clogged with solid deposits. For the lifting station, pull out the submersible pumps to remove the stringy fibres blocking the vortex impeller, then rinse the storage tank thoroughly.
  3. Restoring compliance in accordance with SN EN 12056If the installation drained by gravity without a shut-off device, fit a mechanical disconnector or switch the fixtures located below the road level to a station equipped with an anti-backflow loop passing above that level. Replace any faulty control unit and install a high-level alarm on an autonomous dry contact.

Once the device has been restored, carry out a real water-rise test in the pit to validate the triggering of the audible and visual alarm float, as well as the switching of the pumps. Record the readings in the sanitary installation's maintenance logbook. Remind the client that professional rules and cantonal drainage directives require a six-monthly service of the valve and lifting components to maintain the validity of the building insurance in the event of storm damage.

Frequently asked questions

What exact level defines the backflow level of the public collector?

According to SN EN 12056, the backflow level corresponds by default to the upper level of the pavement kerb or roadway at the building's connection point. Any sanitary fixture, floor trap or manhole located below this elevation is considered vulnerable to backflow. During a violent storm, the water in the collector becomes saturated and rises to this natural overflow level of the public road.

Can a simple non-return valve be fitted to protect basement toilets?

No. For foul water containing faecal matter, fitting a simple free-flap valve is prohibited by SN EN 12056. Either a lifting station with a macerating pump or a specific motorised automatic valve for faecal matter with double shut-off and pneumatic watertight closing must be installed. A conventional gravity valve risks being held open by toilet paper or faeces during a flood.

How often and how should a buried non-return valve be maintained?

The valve requires a technical check at least twice a year in a single-family house and quarterly in a multi-occupancy building. The work consists of opening the watertight cover, removing greasy sludge, inspecting the wear of the flexible sealing gasket and checking the mobility of the flap. The manual emergency closure must then be operated and a water-pressure leak test carried out to verify that there is no infiltration upstream of the shut-off component.

Why must the high-level alarm of the lifting station be independent?

In the event of a mains failure or thermal tripping of the pumping unit, the tank continues to receive gravity flows. A high-level alarm float connected to a battery-backed electrical circuit warns the occupants by an audible alarm and a visual signal before overflow. If the alarm depended on the failed main circuit, the underground room would be flooded without anyone being alerted to the malfunction.

Texts and standards cited

  • SN EN 12056Gravity drainage networks inside buildings - Requirements for lifting installations and protection against backflow