Lockout, work on de-energised equipment and arc risk: the execution reference
Intended for CFC 232 electrical installers, foremen and site managers, this section brings together the practices of lockout, verification of absence of voltage and protection against electric arcs on Swiss construction sites. It details the organisation of work on de-energised equipment, temporary electrical distribution, multi-trade work with the other trades and emergency measures for electric shock risks, in strict application of the Suva directives.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
19 to 21 %
Minimum and maximum oxygen content by volume required at indoor workstations
30 mA
Maximum residual differential current of the devices protecting construction site socket outlets
5
Vital safety rules to be applied in strict order before any electrical handling
50 V
Threshold of effective AC voltage from which the lockout procedure applies
Scope of work on de-energised equipment and limits of the installer's competence
The field of high-current work in Swiss buildings requires a strict separation between live operations and safe work on de-energised equipment. This section deals exclusively with the procedures that fall to the electrical installer under CFC 232: isolating operations, mechanical locking, verification of absence of voltage, short-circuiting, protection against bare parts at residual voltage and construction site power distribution. It also covers the physical constraints of heavy finishing work, such as through-penetrations, control of mineral dust and work on individual mobile platforms.
On a Swiss construction site, the fundamental rule remains work on de-energised equipment. Any live work is a major exception that requires a specific qualification, certified insulated tools, suitable personal protective equipment and a written work order validated by a skilled person authorised within the meaning of the ordinance on low-voltage electrical installations. In accordance with art. 82 LAA, the employer takes all the measures necessary to prevent accidents, and the staff have the duty to apply these protective measures without exception.
Managing the air during chasing and drilling is an integral part of the electrical workstation. Art. 33 OTConst requires attention to air quality by removing, filtering or ventilating hazardous substances, in particular the respirable quartz released by wall chasers in reinforced concrete or calcium-silicate brick. This technical obligation directly protects the operator and all the trades present in the same room.
How to read this section: from the clean cut-off to site interactions
To structure the preparation of interventions and guarantee flawless safety on site, the ten chapters of this section follow a logical progression, starting from the main distribution cell and moving towards execution tasks and multi-trade interfaces.
- Controlling the direct electrical riskChapters H6-01 to H6-04 lay the absolute foundations: rigorous application of the five Suva life-saving safety rules, the method for using the two-pole voltage tester with a test before and after the operation, assessment of arc energy in a metering cabinet or main switchboard, and management of buffer zones near busbars or cables left live and in service.
- Operating and equipping the construction site in full complianceChapter H6-05 deals with the design and follow-up of temporary construction site cabinets, including selectivity of residual-current devices and periodic testing of circuit breakers. Chapters H6-06 and H6-07 cover mechanical preparation: connecting class M industrial vacuum cleaners to cutting tools and detecting passive reinforcement or embedded conduits before core drilling.
- Preventing falls and coordinating teamsChapter H6-08 sets the exclusive use of the light individual mobile platform for pulling cables in ceilings instead of the access stepladder. Finally, chapters H6-09 and H6-10 detail the rescue procedure in case of electric shock and the protocol for multiple inter-company padlocking to prevent any unintended re-energisation by a third party.
📘 Chapters in this section 10
The five safety rules: isolate before touching, in the right order
Apply the Swiss five-step protocol to block any risk of accidental contact.
Lockout/tagout, dead working and arc flash riskVerifying the absence of voltage: the right instrument and the before-and-after test
Secure your measurements with a certified two-pole tester, checked before each intervention.
Lockout/tagout, dead working and arc flash riskElectric arc: what triggers it, and the protective equipment that limits burns
Choose the face shields and clothing suited to stopping the thermal energy of arcs.
Lockout/tagout, dead working and arc flash riskWorking near a live installation: distances and de-energisation
Define the work zones and barriers so that you can work with confidence near the network.
Lockout/tagout, dead working and arc flash riskSupplying power to a construction site: residual current protection, robust equipment and regular inspection
Set up robust temporary cabinets fitted with tested residual-current devices for the whole construction site.
Lockout/tagout, dead working and arc flash riskDrilling, chasing, grooving: silica dust and extraction at source
Eliminate dangerous quartz dust with direct extraction devices of the appropriate class.
Lockout/tagout, dead working and arc flash riskDrilling a slab or a wall: locate the reinforcement and services before drilling
Avoid severing load-bearing reinforcement and embedded conduits by using wall scanners.
Lockout/tagout, dead working and arc flash riskWorking at height for electricians: ladder, stepladder and individual platform
Adopt secure mobile platforms to permanently replace ladders during installation.
Lockout/tagout, dead working and arc flash riskElectric shock: cut the power, raise the alarm, give first aid, and why a medical check is needed even without a visible burn
Learn the immediate first-aid actions and understand the need for a medical check-up in hospital.
Lockout/tagout, dead working and arc flash riskCo-activity: circuits re-energised by another party, and shared lock-out
Set up a collective padlocked lockout that prevents any re-energisation by another worker.