Skip to content
Website
🧱 CFC 232Measurements, inspections and safety reportChapter 3 of 10 in the section

Testing an RCD: tripping current, time, and why the test button is not enough

This chapter details the metrological verification of a residual current device. You will be able to distinguish the mechanical check from the electrical measurement with the installation tester, apply the ramp and pulse methods, measure the actual current and response time according to the NIBT, and then correctly record these two values in the measurement report attached to the safety report.

Key takeaways

  • The test button only checks the mechanical linkage and never measures the actual electrical sensitivity of the device.
  • The NIBT requires a precise measurement of the tripping current and time with a calibrated installation tester.
  • The permissible tripping threshold must lie between 50 % and 100 % of the rated residual current.
  • Both measured quantities must be recorded in the measurement report accompanying the safety report.

The built-in test button: a mechanical check with no metrological proof

On distribution boards, every residual current device (RCD) has a test push button on the front, often marked with the letter T. Many practitioners still give in to the temptation of pressing this button during quick commissioning tests to confirm that the breaker works. This habit is a major technical mistake. The built-in test button merely closes an internal resistive circuit connecting an upstream phase to a neutral conductor or another phase downstream of the detection toroid. This bridge creates an artificial imbalance, but this test current is deliberately calibrated by the manufacturer to a high value, often between 150 % and 250 % of the rated residual current (IΔn), precisely to guarantee a strong impulse.

Technical comparison between the built-in test and metrological testing
Parameter analysedBuilt-in test buttonMultifunction installation tester
Leakage current generatedUnknown (fixed raw value, often 1.5 to 2.5 IΔn)Calibrated in precise steps or linear ramp
Measurement of actual threshold (mA)Impossible (no value indication)Exact measurement of the actual tripping current
Measurement of duration (ms)Impossible (audible assessment only)Exact timing measurement to the millisecond
Touch voltage (Uc)Not monitored during the testPreliminary check without tripping before the test
Validation for the reportNot acceptable for OIBT documentsNumerical values mandatory for the RaSi file

Periodic operation of this push button is the responsibility of the installation operator, in order to free the moving parts subject to dust build-up or prolonged inactivity. For the installation electrician carrying out the initial verification or the final inspection, this button is in no way a measuring instrument. Conformity of the work requires quantifying the actual sensitivity of the toroid and the tripping kinematics.

Measuring the threshold and tripping time according to NIBT requirements

To meet the normative requirements of the NIBT, an RCD is tested using a periodically calibrated multifunction test instrument. The connection is made directly on the RCD terminals or downstream on the sockets of the protected circuit, ensuring perfect continuity with the protective conductor (PE). The instrument injects a waveform suited to the RCD class (sinusoidal for type AC, pulsed rectified for type A, or smooth rectified for type B) to avoid a distorted diagnosis on modern installations containing rectifiers or variable-speed drives.

  1. Checking the touch voltageThe instrument first injects a current below one third of the tripping threshold to calculate the theoretical touch voltage Uc. If this voltage exceeds the permissible safety limit of 50 V in dry conditions, the instrument blocks the test to rule out any risk of accident.
  2. Measuring the tripping current by rampThe tester applies a linearly increasing ramp of residual current, generally starting at 30 % or 50 % of IΔn in progressive increments. The measured tripping threshold must lie between 50 % and 100 % of the rated value of the device, i.e. between 15 mA and 30 mA for a 30 mA residual current circuit breaker.
  3. Measuring the tripping time at IΔnOnce the threshold is established, the instrument instantly generates the rated value IΔn as a full wave. The internal timer records the exact time between the appearance of the fault and the complete opening of the poles. This operation is carried out in the positive phase (0°) and then in the negative phase (180°) to retain the least favourable value.

In the case of selective type S breakers protecting sub-distribution boards, the tripping time falls within a staggered time range to ensure the hierarchy of cascaded disconnections. The installer records these specific quantities after confirming the absence of tripping at half value (0.5 IΔn during the imposed waiting period), confirming immunity to transient network disturbances.

Operating procedure with the multifunction tester: current ramp and dynamic measurement

To validate the conformity of a residual current device (RCD) according to the NIBT requirements, the installation electrician cannot rely on the mechanical button on the front. Metrological verification is carried out exclusively with an installation tester compliant with the applicable measurement standards, connected directly downstream of the circuit breaker or residual current switch, ideally at the most remote point of use of the final circuit. The measuring instrument injects calibrated signals between the phase and the protective conductor (PE) to separately assess the effective tripping threshold and the breaking time.

  1. Preliminary touch voltage check (Uc)Before any actual tripping, the measuring instrument emits a non-tripping test current (generally below one third of the rated value) to determine the fault loop impedance and calculate the expected touch voltage. If this voltage exceeds the conventional limit of 50 V set by the NIBT for dry premises, the instrument automatically blocks the sequence to prevent a dangerous potential from appearing on the exposed metal parts connected to the earth conductor.
  2. Non-tripping test at 50 % of IΔnThe instrument injects a sinusoidal or rectified wave of an intensity strictly equal to half the rated current (for example 15 mA for a 30 mA device) for a predefined duration. The RCD must under no circumstances open. A premature trip at this value indicates either an underlying permanent leakage already present on the protected network, or premature ageing of the ferromagnetic toroid or of the electronic tripping chain.
  3. Measuring the measured tripping current by progressive rampThe instrument generates a leakage current increasing in steps of a few milliamperes. As soon as the power contacts open, the display freezes the exact value. This measured tripping current must necessarily lie between 50 % and 100 % of the rated value IΔn (between 15 mA and 30 mA for personal protection). This measurement makes it possible to quantify the sensitivity reserve available on that section of the installation.
  4. Measuring the tripping time at full rated currentThe tester applies a clean pulse equal to 1x IΔn, synchronising the injection to the phase angle of the alternating wave (0° then 180° to account for fault polarisation). The internal timer records the exact time elapsed between the appearance of the current and the complete interruption of the circuit. The test must be repeated on both half-waves to validate the symmetrical response of the mechanism.
Tripping limit values according to the NIBT requirements
RCD typeTest current appliedPermitted range of measured currentMaximum permitted breaking time
General instantaneous (30 mA)1x IΔn (wave 0° and 180°)15 mA to 30 mA300 ms
General instantaneous (30 mA)5x IΔn (150 mA)15 mA to 30 mA40 ms
Selective type S (300 mA)1x IΔn (300 mA)150 mA to 300 mA130 ms to 500 ms
Selective type S (300 mA)5x IΔn (1500 mA)150 mA to 300 mA50 ms to 200 ms

Recording measurements and using the data for the safety report

Swiss legislation, built around the OIBT and the technical rules of the NIBT, requires the installer holding an installation authorisation to carry out a rigorous final inspection before commissioning a distribution board. The raw results must not remain stored in the temporary memory of the multifunction instrument: they form the technical basis of the measurement report attached to the safety report (RS). Two distinct numerical quantities must necessarily be documented for each residual current device: the precise value of the measured tripping current (expressed in milliamperes) and the arc extinction time (expressed in milliseconds).

Entering a simple remark such as "compliant" or "tested" on self-inspection forms is not acceptable during acceptance checks by the network operator or during the independent periodic inspection. The NIBT test report requires clear identification of the circuit (circuit number and room designation), the characteristics of the device (rated current In, sensitivity IΔn, type A, B or F, instantaneous or selective), and the serial number of the measuring instrument used, to guarantee metrological traceability and the validity of its annual calibration.

  • Designation of the protected circuit and exact location in the sub-distribution or main board.
  • Construction type of the residual current device: sensitivity to pulsed (Type A) or smooth (Type B) DC components.
  • Actual tripping test current (mA) recorded by the progressive ramp test.
  • Actual breaking time (ms) at rated current at the least favourable phase angle.
  • Calculated residual touch voltage (V) on the installation at the time of signal injection.
  • Confirmation of free operation of the mechanical test button under actual voltage conditions.

Procedure in case of non-conformity and clearing of residual current faults

When a residual current circuit breaker or residual current switch fails the metrological check, the installation electrician must identify the origin of the malfunction before any final acceptance of the work. Two major deviations commonly appear on the construction site: complete absence of tripping, indicating a mechanical seizing of the latch, and a threshold value outside tolerance. The limit of the built-in test button shows up precisely here: a manual impulse only confirms mechanical freedom without proving the response of the magnetic detection toroid or demonstrating conformity with the NIBT requirements.

  1. 1. Isolate the downstream circuitDisconnect the live conductors downstream of the residual current breaker. This operation isolates the permanent leakage currents generated by loads or insulation wear, which distort the current ramp and cause premature tripping.
  2. 2. Test at the terminalsConnect the multifunction tester directly to the downstream terminals of the device. Carry out the full cycle: current ramp to quantify the actual sensitivity, then dynamic injection to validate the tripping time at the appropriate phase angle.
  3. 3. Replace the deviceIf the measured tripping current remains above the rated value or if the opening time exceeds the normative tolerances, the equipment is declared non-compliant. No tinkering is allowed: replace the faulty part immediately.
  4. 4. Record the resultsRepeat the test on the new device until compliant values are obtained. Note the actual threshold and the tripping time in the test forms intended for the final inspection file.

The safety report handed to the owner and kept available for the network operator requires absolute documentary rigour. The installation electrician certifies the conformity of each disconnecting device. If material supplied by the client is defective or compromises the execution of the work, the contractor informs the client in accordance with art. 365 CO al. 3. Corrective measures thus guarantee the protection of persons before the administrative closure of the installation file.

Frequently asked questions

Why is the mechanical test button not enough during the acceptance inspection?

The test button operates an internal resistor creating a sudden artificial leakage current. This operation only proves that the mechanical latch and the striker are not seized. However, it measures neither the opening time nor the actual sensitivity of the magnetic toroid. To meet the NIBT requirements, only a calibrated multifunction test instrument can quantify these physical quantities and guarantee the protection of users.

What are the two mandatory values to enter in the measurement report?

The installation electrician must precisely record the measured tripping current, obtained via a progressive current ramp, and the tripping time recorded during a dynamic injection at the rated nominal value. Entering a simple qualitative remark such as "compliant" or "tripped" is insufficient. These two numerical values are the indispensable metrological proof required in the test report attached to the safety report to validate the installation.

Why does an RCD sometimes trip below the permissible range of 50 %?

According to the NIBT, a residual current device must not trip below half of its rated current, i.e. 15 mA for a 30 mA rating. A premature trip almost always indicates the presence of a permanent leakage current on the downstream conductors. Electronic filter capacitors or partial insulation faults add to the tester current. The installer must open the outgoing circuits to test the device with no load.

How should a selective type S residual current device be checked correctly?

A type S device has an intentional time delay to ensure upstream-downstream selectivity. During the dynamic measurement with the multifunction tester, the installer must select the selective profile to avoid a false time anomaly. The instrument injects the rated current and checks that the tripping time remains within the range defined by the NIBT. The ramp test is then carried out to validate the current threshold.

Texts and standards cited

  • CO art. 365material and ground: the contractor is liable for the good quality of the material he supplies; if the material supplied by the client or the ground designated by him is found to be defective, or if another circumstance compromises the proper or timely execution of the work, he must inform the client immediately, failing which he bears the consequences (para. 3)

In the same section