🧱 CFC 232Lockout/tagout, dead working and arc flash riskChapter 8 of 10 in the section

Working at height for electricians: ladder, stepladder and individual platform

This chapter teaches you to assess fall risks during electrical installation work at height, to stop using the ladder as a prolonged workstation, to select a mobile individual platform that complies with Swiss requirements and to check methodically the stability of the supports on a raw slab or raised floor.

Key takeaways

  • Low-height falls from a stepladder are the leading risk of bodily injury for the installer.
  • The ladder serves only as a temporary means of access and is never a workstation for work requiring force.
  • The mobile individual platform ensures safe hands-free work thanks to its integrated guardrail.
  • Art. 23 OTConst requires a perimeter guardrail as soon as the fall height exceeds two metres.

Ban the ladder as a fixed workstation for pulling and connecting cables

On construction sites with heavy-current installations, insurers' statistics show that major injuries do not come primarily from contact with live parts, but from low-height falls. The reflex of using a double stepladder or a single ladder to drill slabs, install cable trays or pull heavy conductors exposes the electrician to an immediate loss of balance. As soon as a worker applies a horizontal force with a drill or pulls on a fish tape, the mechanical reaction moves the centre of gravity outside the support polygon of the equipment.

  • Keeping one's balance requires three permanent points of contact with the rungs, which makes it impossible to work with both hands to fix clamps and connect distribution boards.
  • Standing for a long time on a narrow rung causes significant muscle fatigue in the lower limbs, making missteps more likely when climbing down.
  • The strict ban on working while standing on the top two steps or on the platform of a stepladder without a certified guardrail.
  • The increased risk of tipping when passing a rigid conduit or a severed supply cable carrying residual voltage.

A perimeter guardrail is required in unprotected places where the fall height is greater than 2 m, for embankments more than 2 m high and with a slope of more than 45°, and near bodies of water and watercourses.

art. 23 OTConst

For routine operations such as installing industrial luminaires or tightening terminal blocks in a tall cabinet, a standard trade stepladder must not be used whenever the task lasts more than a few minutes. The absence of a mid-rail and toe board turns every twist of the torso into a danger of a direct free fall onto the concrete.

Adopt the mobile individual platform and control the ground support

The light mobile individual platform is the standard technical solution for all electrical installation work under ceilings or in technical shafts. Designed with a non-slip floor surrounded by a complete guardrail comprising top rail, mid-rail and integrated toe board, it allows continuous work with both hands free. This equipment provides the back support needed when the installer guides a main connection between two floors or holds a bulky junction box.

Criteria for choosing the means of access at height for heavy-current work
EquipmentMaintaining balancePermitted pulling forceAuthorised use on site
Single or extension ladder1 hand free at mostNone (axial force only)Access between levels only
Folding step stoolPrecarious (no guardrail)Very low (less than 50 N)One-off emergency repair of 5 minutes
Individual platform (PIR/PIRL)Total (360° guardrail)Moderate (standard work)Fixed workstation for assembly and wiring
Mobile service scaffoldingSecured by stop railsHigh (bundle pulling)Commercial and industrial construction sites
  1. Checking the ground supportCheck the strength and flatness of the support, excluding unprotected hatchway areas, poorly wedged raised-floor panels and slabs cluttered with masonry rubble.
  2. Locking movementEngage the individual mechanical brake on each of the swivel wheels as soon as the platform is positioned exactly in line with the working axis.
  3. Deploying the stabilisersAlways open the lateral stabiliser arms in accordance with the manufacturer's instructions to widen the footprint before climbing onto the working floor.
  4. Closing the gateClose the rear protection device or the rigid chain as soon as you are on the floor to restore continuous fall protection.

Managing floor clutter is a critical point for installation teams. Since electricians often work in cramped technical rooms, choosing a compact telescopic frame makes it possible to pass through interior doors without dismantling. Before each shift, the foreman checks the condition of the wear pads, that the aluminium uprights are not deformed and that the safety braces are effectively locked.

Limits of use of the ladder and stepladder: the real risk of falling

On construction sites as in commercial or industrial maintenance, most serious accidents involving electrical installers do not come from contact with a live conductor, but from loss of balance on a stepladder or single ladder. Carrying out tasks under ceilings — pulling large-section conductors, fixing perforated sheet-steel cable trays or connecting industrial luminaires — imposes physical stresses and lateral forces incompatible with the geometry of a ladder. As soon as both hands leave the stiles to handle a hammer drill or feed conductors into a junction box, the worker loses stable support.

Art. 23 OTConst provides that the perimeter guardrail is installed in unprotected places where the fall height is greater than 2 m, for embankments more than 2 m high and with a slope of more than 45°, and near bodies of water and watercourses. In day-to-day CFC 232 work, standing on the top rungs of a stepladder often raises the feet to more than one metre above the finished floor, placing the head and torso more than two and a half metres above a raw slab strewn with starter bars or technical conduits. A slip leads to a direct fall with no collective restraint.

Criteria for choosing between a simple stepladder and a work platform for electricians
Planned electrical taskRecommended means of accessErgonomic and mechanical constraintIntegrated protective measure
Visual check or resetting of a circuit breaker in a shaftAluminium stepladder with intact padsDuration under 5 minutes, no lateral forcePermanent maintenance of three points of support
Drilling slabs and fitting cable tray hangersMobile individual platform (PIRL)Strong vertical thrust, vibrations, wearing heavy PPERigid 360° guardrail, toe board at floor level
Connecting main distribution cabinetsVariable-height individual platformProlonged two-handed work, handling crimping toolsAdjustable non-slip floor, stabilisers deployed
Pulling large-section armoured cables under the ceilingMobile scaffolding or aerial work platformVery high horizontal pulling forces, risk of shiftingLocked self-stable structure, barricaded perimeter

Stability of the mobile individual platform and control of the ground support

The light mobile individual platform is the reference equipment for the heavy-current electrical installer. Unlike the articulated stepladder, it incorporates a working floor surrounded by top rails, mid-rails and toe boards, providing a secure area where the tradesperson works with both hands free. However, the effectiveness of this equipment depends entirely on the quality of its ground support and the rigour of its wedging before any climb.

  • Checking the ground support: remove concrete rubble, core-drilling sawdust or offcuts of metal rails that could cause tipping during the climb.
  • Checking flatness and bearing capacity: it is forbidden to position a wheel or pad on an open manhole, a temporary inspection hatch or a technical chase.
  • Symmetrical deployment of the lateral stabilisers as soon as the floor height exceeds the width of the base footprint.
  • Effective engagement of the brakes on all swivel wheels before climbing the access steps.
  • Systematic closing of the safety gate or the rear locking chain as soon as you access the working platform.

On raw slabs with level differences or drainage slopes for future screeds, platforms with independently adjustable feet should be preferred. The electrician adjusts the screw jacks to restore a perfectly level floor, confirmed by the spirit level built into the equipment's upright. Stacking makeshift wooden wedges or bricks under an unlocked wheel is strictly banned: the thrust exerted when driving in a rotary hammer is enough to eject this kind of improvised wedging and topple the whole structure with its occupant.

Stop procedure and corrective measures in the event of access failures

On a building construction site, the failure of an access at height almost always results from a degraded ground support, unexpected clutter in the walkways or the unjustified use of a ladder to speed up installation. When the stability and ground support do not allow a mobile individual platform to be set up rigorously, or when the available equipment shows mechanical play or deformed uprights, personnel must stop the task. Art. 82 LAA provides that the employer must take, to prevent occupational accidents, all measures which experience has shown to be necessary, which are applicable according to the state of the art and which are appropriate to the given conditions, and that workers must support the employer in this.

Art. 23 OTConst provides that the perimeter guardrail is installed in unprotected places where the fall height is greater than 2 m. In technical rooms, along open slab hatchways or at the edge of floor voids, the limits of use of the ladder strictly forbid using it as a workstation for the electrical installer. Handling rigid trunking, pulling heavy supply conductors or torque-tightening terminals in cabinets impose considerable lateral forces. These mechanical stresses inevitably destabilise a set of rungs or a stepladder without a guardrail, causing a sudden tip-over.

  1. Tag out unsuitable equipmentRemove the damaged stepladder or ladder from the work area without delay. Attach an explicit prohibition tag and tag the item out in the site depot to prevent any inadvertent reuse by another installation team.
  2. Clear the walking surfaceHave the general contractor clear offcuts of conduit, rubble and unclosed openings. Check the bearing capacity of the support, particularly on technical raised floors or fresh screeds, before repositioning the pads of the mobile individual platform.
  3. Replace the access with compliant equipmentDeploy a mobile individual platform fitted with its four stabilisers or request mobile scaffolding if space is restricted. If the ceiling height exceeds the platform's capacity, require a motorised aerial work platform.

When site management objects to the temporary stoppage of installation on the grounds of keeping to the connection schedule, the foreman records the facts in the daily report, describing the absence of a trafficable floor or the risk of tipping. No work rate justifies departing from the rules on bodily restraint: systematically replacing the stepladder with a mobile individual platform eliminates the most frequent accident in electrical finishing work.

Frequently asked questions

Why is the double ladder prohibited for installing cable trays?

Installing cable trays requires bidirectional physical effort and the constant use of both hands to fix brackets and tighten bolts. The limits of use of the ladder remind us that it serves as temporary access and not as a continuous workstation. A stepladder offers no lateral restraint or back guardrail. Loss of balance during drilling or pulling is the main cause of serious accidents among electrical installers.

How do you ensure the stability of a mobile individual platform on a raw screed?

Before accessing the working floor, the installer checks the flatness and cleanliness of the ground support. The presence of rubble, unclosed core holes or pipes on the floor compromises the equipment's footing. The four deployable stabilisers must rest firmly on the ground, with the wheels locked by their mechanical brake. If the floor has major irregularities, standardised non-deformable wedges must be used to ensure a perfect level before any climb.

When does art. 23 OTConst apply during electrical work at height?

Art. 23 OTConst applies whenever an electrician works near an unprotected place with a fall height greater than 2 m, such as a lift shaft, an open technical shaft or an unsecured slab edge. In these situations, using a simple mobile individual platform does not remove the need for collective protection against the void. If the perimeter guardrail is missing, the work is prohibited until the area is secured.

What should be done if floor clutter prevents the stabilisers of a PIR from being deployed?

When plumbing, ventilation ducts or stored material prevent the stabilisers of a mobile individual platform from opening fully, the team leader refuses any makeshift workaround. The area should be cleared beforehand in coordination with the other trades, or the means of access should be adapted, for example by using a narrow-base platform specially designed for corridors or a compliant fixed scaffolding.

Texts and standards cited

  • LAA art. 82General prevention rules: the employer takes the necessary and appropriate measures that the state of the art makes it possible to apply, and workers support the employer
  • OTConst art. 23Use of the perimeter guardrail: installed in unprotected places where the fall height is greater than 2 m