Skip to content
Website
🧱 CFC 232Earthing, equipotential bonding and lightning protectionChapter 5 of 10 in the section

Buried earth connections: corrosion, metals and protection of the junction point

On Swiss construction sites, connecting an earth conductor without isolating dissimilar metals destroys the earth electrode within a few years. This chapter details the mechanisms of the galvanic couple in damp ground, identifies the metals permitted in direct soil contact and describes the installation of sealing tapes and inspection pits to guarantee the safety of the structure.

Key takeaways

  • Direct contact between copper and steel in damp ground destroys the steel through rapid galvanic corrosion.
  • Galvanised steel in the ground requires watertight anti-corrosion tapes to stop attack by electrolytes.
  • Bare copper and high-grade stainless steel remain the metals permitted in direct soil contact.
  • Every buried junction must remain accessible for periodic measurement of the protective conductor.

Understanding the galvanic couple and selecting compliant metals for direct soil contact

In French-speaking Switzerland, the installation electrician is regularly confronted with earth connections that have failed after only a few seasons in service. The phenomenon is explained by the galvanic cell created whenever two metals with different electrochemical potentials are electrically connected and immersed in a common electrolyte, namely the water contained in the backfill soil. The more electronegative metal, called the anodic metal, dissolves in favour of the nobler metal, called the cathodic metal. In the case of a direct junction between copper and mild steel or hot-dip galvanised steel laid in direct soil contact, the copper relentlessly accelerates the corrosion of the iron.

Behaviour and compliance of buried metals according to the NIBT
MaterialBehaviour in direct soil contactPermitted installationMain risk
Bare or tinned copperVery good cathodic behaviour in standard soilPermitted directly in trench or as a loopCorrodes the surrounding steel if connected to it
Hot-dip galvanised steelSacrificial zinc protection is quickly exhaustedProhibited in the ground without passive protectionTotal loss of cross-section through pitting
V4A stainless steelExcellent passivity in aggressive environmentsPermitted in direct soil contact and mixed connectionsHigher purchase cost but complete durability
Untreated mild steelImmediate oxidation and rapid destructionStrictly prohibited in direct soil contactConnection failure within a few months

According to the NIBT rules, the materials used for earth electrodes and buried earth conductors must resist mechanical and chemical corrosion from the soil. Bare copper in the form of tape or cable with a minimum cross-section of fifty square millimetres offers proven longevity. Galvanised steel is not tolerated bare in direct soil contact without a watertight protective sheath, because zinc is consumed very quickly in acidic or peaty soils. If the conductor has to pass from blinding concrete into topsoil, the use of intermediate V4A stainless steel parts guarantees potential neutrality and eliminates the risk of destructive redox reactions.

Electrode potential
Electrochemical quantity measured in volts that characterises a metal's tendency to release electrons; the more negative the potential, the faster the metal corrodes in the presence of a nobler metal.

Mechanically protecting the junction point and ensuring the earth electrode can be measured

The transition between the foundation slab reinforcement, carried out by the structural work contractor, and the building's earthing network is the critical link in the system. When the connecting bar emerges from the concrete to join an external earth loop or the main isolator, the junction point is subject to a concentration of moisture and oxygen that promotes aerated corrosion. If the client supplies starter elements unsuited to the environment, art. 365 CO reminds us that the contractor must immediately report any defect in the material in order to be released from contractual liability.

  1. Mechanical clamping at controlled torqueAssemble the conductors with heavy-duty connection clamps suited to the cross-sections, fitted with a bimetallic intermediate plate in the case of copper-steel contact.
  2. Cleaning and degreasing of the contact pointRemove concrete laitance, loose rust and traces of oil with a clean wire brush.
  3. Application of the petrolatum-based anti-corrosion tapeWind the greasy tape with a fifty per cent overlap over at least ten centimetres on each side of the clamp to exclude air and water completely.
  4. External mechanical protectionApply a heavy heat-shrink sleeve with internal adhesive or a self-amalgamating protective tape resistant to puncturing during backfilling.

Accessibility for inspection remains a fundamental requirement set by the OIBT and the NIBT. Burying an earth connection without an inspection pit makes periodic measurement of the contact resistance and visual inspection of the spark gaps or disconnection terminals impossible when the safety report is drawn up. The electrician must install an inspection chamber in polymer concrete or plastic closed by a watertight cover to protect the measuring bar. This arrangement allows the inspection body to temporarily disconnect the earth from the internal equipotential network without destroying the coating of the underground junction point, guaranteeing an accurate measurement of the electrode resistance.

Execution of bimetallic junctions and sealing in aggressive soil

On construction sites in French-speaking Switzerland, the connection between the foundation reinforcement installed by the masons and the external earthing network poses an acute electrochemical compatibility problem. When the earth conductor leaves the concrete to enter the natural ground, the redox potential changes abruptly. Black or merely galvanised steel embedded in concrete has a nobler electrochemical potential than bare or zinc-coated steel buried in damp, aerated soil. If a steel conductor crosses this boundary directly without precautions, a differential corrosion cell is activated and destroys the metal at the interface within two to three years.

To connect a copper air-termination conductor or external earth loop to the foundation earth starter bar coming from the slab, the installation electrician must rule out any direct contact between copper and galvanised steel in a damp environment. The potential of copper (+0.34 V relative to the standard hydrogen electrode) against zinc (-0.76 V) or iron (-0.44 V) generates a continuous galvanic current that dissolves the anode, namely the steel element. The technical solution is to use an intermediate transition piece or to systematically use austenitic stainless steel of grade 1.4404 or 1.4571 (commonly called V4A) for all buried crossings and junctions.

Admissibility of metals and contact pairs for buried earth conductors
Metal pair in contactBurial environmentElectrochemical behaviourInstallation on site
Bare copper / Galvanised steelDirect soil contact / damp backfillRapid galvanic corrosion of the steel (sacrificial anode)Strictly prohibited without full dielectric insulation
Bare copper / V4A stainless steel (1.4404)Direct soil contact or concreteSmall potential difference, stable passivityPermitted with mechanical clamping by stainless steel clamp
Galvanised steel / V4A stainless steelConcrete to groundModerate risk in draining soil, corrosive in peaty groundPermitted if the junction is embedded in the concrete
V4A stainless steel / V4A stainless steelAll Swiss soil typesExcellent durability, no local cellRecommended for watertight penetrations and earth rods
  1. Mechanical preparation of the strandsBrush the metal contact surfaces to remove cement laitance, loose rust or soil. Check that the cross-section of the flat bars or round cables complies with the Swiss earthing requirements.
  2. Tightening the lug or junction clampJoin the copper conductor and the steel outlet using a connector with bimetallic intermediate plates (aluminium-copper cup or stainless steel spacer) or a heavy clamp made entirely of V4A stainless steel, tightened to the recommended torque using a torque wrench.
  3. Application of the passive sealing tapeWrap the entire connector and the adjacent conductors over at least 20 centimetres on each side with an anti-corrosion protective tape based on technical petroleum jelly (petrolatum) or butyl mastic, with a 50 % overlap.
  4. External mechanical protectionCover the wrapping with a thick heat-shrink sleeve with internal hot-melt adhesive or a tear-resistant mechanical overprotection tape, to withstand compaction of the excavation.

Disconnection points, measuring chambers and inspection obligations

The durability of the earth loop does not depend solely on its initial physical strength; it relies on the possibility of periodically verifying the overall impedance value without damaging the building envelope. The installation electrician must design the route so that every critical disconnection point remains accessible to the inspection bodies during the periodic inspections prescribed by the Low-Voltage Installations Ordinance (OIBT) or before the safety report (RS) is issued.

When the foundation earth / earth conductor connection is made outside the perimeter walls, it must be housed in an inspection pit of concrete or plastic closed by a cover able to withstand traffic loads. Inside this chamber, the junction remains in the air, out of reach of settling sludge. The earth isolator or measuring link makes it possible to isolate the earth electrode from the rest of the building's equipotential bonding in order to measure the resistance by the three-electrode method (Venner method or loop impedance).

Where a slab outlet rises directly into a technical room towards the main low-voltage distribution board, the slab penetration must be made using a prefabricated part that is watertight against pressurised water and radon gas. The V4A stainless steel flat bar passes through the wall via a sealing disc with a compressible collar. Only in the open air, on the main earthing bar fixed on insulators on the wall of the technical room, can the copper connections be made without any risk of degradation by galvanic couple.

  • Prohibit aluminium in all forms in direct soil contact or in concrete, even when sheathed.
  • Record the exact location of the earth chambers on the as-built drawings filed with the revision file.
  • Measure the galvanic continuity between the reinforcement and the main bar before final pouring of the blinding concrete or slab.
  • Use only A4 fasteners (stainless steel 1.4401/1.4404) for any mechanical assembly liable to be exposed to condensation.

Diagnosing damage and repairing corroded buried connections

When a visual inspection, a final inspection or a periodic inspection reveals advanced deterioration of the earth electrode, the continuity of the protective conductor is no longer ensured. Galvanic corrosion in damp ground can completely dissolve a galvanised steel flat bar connected carelessly to copper in only a few years. This impedance fault seriously compromises the flow of short-circuit currents and disturbs the tripping of automatic disconnection devices. Faced with an interrupted or heavily oxidised earth connection below natural ground level, the site foreman must take action to restore compliant equipotential bonding.

  1. Locating and diagnosing the breakLocate the discontinuity by measuring the resistance between the main equipotential bonding bar and each emergence point using an approved installation tester. If the measured value deviates abnormally from the initial value recorded in the technical file, isolate the faulty section to confirm the mechanical or chemical break underground.
  2. Installing a replacement electrodeWhere it is technically impossible to dig out a corroded connection beneath the slab, drive deep vertical earth rods or lay a V4A stainless steel tape in a dedicated trench, directly in contact with loose soil, avoiding demolition backfill polluted by aggressive slag.
  3. Watertight protection and accessibility of the contact pointMake the junction by certified mechanical clamping with a bimetallic shim, then wrap the connection in a heat-shrink greasy tape or a two-component resin. This assembly must be placed in an accessible disconnection chamber so that future periodic inspections can be carried out without heavy excavation.

In the event of damage or a defect compromising the safety of users, the client's rights are governed by art. 368 CO or the SIA 118 standard. The electrician commissioned must record all values after the work in an official safety report accompanied by the earth measurement report, confirming the compliance of the installation under the NIBT and the OIBT.

Frequently asked questions

How can a hidden break in an earth electrode in the ground be identified?

The failure of a buried loop or electrode is not visible to the naked eye. It is detected during the periodic inspection by measuring the loop impedance or the overall earth resistance with a specific megohmmeter. An abnormally high or unstable value indicates a discontinuity. The disconnection link is then opened to test each branch separately and locate the corroded section without needlessly opening the whole external trench.

Which electrode metals are permitted for installation directly in the ground?

For direct burial in the ground, the regulations permit bare copper in the form of cable or flat bar, tinned copper, and high-grade stainless steel (DIN 1.4571 or V4A). Hot-dip galvanised steel is strictly reserved for complete embedding in the concrete of the slab. Laid bare in acidic or damp soil, the zinc disappears quickly, exposing the steel to accelerated perforating corrosion that destroys the earthing.

Why does zinc-coated steel deteriorate in direct contact with copper in damp ground?

Copper and zinc have electrochemical potentials that are very far apart. In a damp environment, the soil acts as a conductive electrolyte, creating a natural galvanic cell. The zinc and steel form the sacrificial anode and dissolve in favour of the copper, which acts as the cathode. Without a watertight bimetallic separator preventing any passage of moisture between the metals, the steel clamping point oxidises completely, causing mechanical and electrical failure of the circuit.

How should the measuring point be arranged to ensure accessibility without digging?

The junction point between the earth electrode and the main equipotential bonding conductor must include a removable disconnection link for measurements. To avoid any later excavation, this connection is installed either inside the building on the main earth bar, or outdoors in an accessible concrete inspection pit with a cast-iron cover. The device thus remains clean, dry and accessible to the approved inspection bodies.

Texts and standards cited

  • CO art. 368client's rights in the event of defects in the work
  • SIA 118General conditions for the execution of construction work

In the same section