🧱 CFC 232Measurements, inspections and safety reportChapter 10 of 10 in the section

File handed to the client: diagrams, report, instructions and labelling

At the end of the construction site, the electrician hands over a complete project file guaranteeing the safety and traceability of the heavy-current installations. You will learn how to structure as-built diagrams, gather the measurement protocols and safety reports required by the OIBT, then file the maintenance sheets essential for the long-term operation of the building.

Key takeaways

  • The as-built panel diagram reflects exactly the actual labelling of the protective devices installed.
  • The official safety report and its measurement protocol attest compliance under the OIBT.
  • The original data sheets and instruction manuals are grouped by panel and by floor.
  • Rigorous archiving in the project file protects the company's liability at final acceptance.

Compiling the as-built diagrams and the inspection certificates

Once the connections are complete and the construction site has been cleared, the electrical installation is no longer just cables pulled through slabs or circuit breakers switched on in cabinets. What remains, legally and technically, is the documentation handed to the building owner. The fundamental basis of this technical file remains the updated principle diagram and single-line distribution diagram. No project is completed strictly according to the engineering office's initial plans: circuit breaker ratings are adjusted, outgoing circuits are swapped to balance the phases, conductor cross-sections are increased according to the actual lengths installed in the service duct. The document handed over tolerates no handwritten marker annotations or site crossings-out. It must be a clean, up-to-date print showing the exact designation of each fuse, residual current circuit breaker or impulse relay.

This graphical accuracy directly determines the validity of the inspection documents prescribed by the Low Voltage Installations Ordinance. The electrician holding the installation permit first draws up the internal inspection report, together with the installation measurement protocol. This protocol records the actual values obtained at the device terminals: fault loop impedance, prospective short-circuit current at the furthest point of each line, insulation resistance measured under direct voltage, as well as the tripping time and the actual breaking current of the residual current devices. On the basis of these results, which comply with the NIBT rules, the final safety report is drawn up, signed by the responsible qualified person, then transmitted to the landowner for formal notification to the distribution network operator.

Mandatory documents for the low-voltage safety section
DocumentIssuerRecipientTechnical function
Single-line cabinet diagramElectricianClient / OperatorExact labelling of circuits and ratings
NIBT measurement protocolFitter or chief electricianInspector / Technical managerInsulation, loop and RCD tripping values
Safety report (RS)Installation permit holderOwner and network operatorLegal proof of compliance under the OIBT
Final inspection certificateIndependent inspection bodyNetwork operator / OwnerPeriodic validation or official acceptance
  1. On-site check of the physical labellingVisually check that each label engraved on the panel cover plate corresponds point by point to the designation shown on the as-built single-line diagram.
  2. Recording the acceptance measurementsTransfer all the values read on the verified measuring instrument into the official test protocol form, without extrapolating or omitting any final circuits.
  3. Issuing and signing the safety reportHave the document initialled by the operating electrician or the holder of the master qualification, certifying that the entire heavy-current installation meets the requirements of the OIBT.

Gathering operating instructions, labelling and project file documents

In addition to the distribution diagrams and the compliance report, the project file handed to the client must include all the original instruction manuals delivered with the equipment installed. The electrician must not throw away the maintenance leaflets when unpacking the switchgear cartons. Type 1 and 2 surge arresters, emergency lighting units on autonomous battery, high-power modular dimmers and changeover contactors each have precise operating procedures. The maintenance manuals define the battery test intervals, the monitoring thresholds of the surge protection cartridges and the tightening torque to be checked during maintenance rounds. Handing over these instructions in technical French is an integral part of the proper delivery of the order.

  • Data sheets of emergency cut-off devices and autonomous emergency lighting units.
  • Operating instructions for motorised source changeover switches and load-shedding devices.
  • Manufacturer's declarations certifying the level of protection against shocks and the dielectric strength.
  • Calibration records of the adjustable electronic trip units for high-current main circuit breakers.

Physical and digital archiving in the project file legally releases the electrician from his immediate delivery obligations. The paper file is traditionally placed in the plan pocket inside the door of the main distribution panel, while a digital copy is given to the site management or to the building operator. Acceptance without reservation of these technical documents by the agent or the client discharges the contractor for all apparent elements, in accordance with the rules of the trade. If a failure or a fire starts years later, the presence in the project file of the initial safety report and the measurement protocol proves irrefutably that the installations were compliant at commissioning.

Formal handover of the installation file and transmission to third parties

Once the installation is complete, tested and energised, the electrician does not leave the construction site on the basis of a simple finding that it works. The physical delivery of the work must be accompanied by the complete technical file handed to the owner or his designated representative. This file brings together all the documents attesting that the work complies with the rules of the trade, formalises the completion of the works within the meaning of the Code of Obligations and is the sole reference in the event of a fault, alteration or loss.

The safety report is the key document of the regulatory section. Drawn up on the basis of the final inspection carried out by the installing company holding the installation permit, it records all the measurement results: continuity of the protective conductor, insulation resistance per circuit, fault loop impedance and tripping time of the residual current protective devices. This document engages the technical responsibility of the signatory and must be transmitted without reservation to the owner, together with the complete measurement protocol.

Summary list of the documents handed over at the close of the project
Technical documentFormat and mediumMain recipientRole over the life cycle of the work
As-built diagramPaper in a pocket at the panel and vector PDFOwner and operatorExact single-line labelling of the circuits, ratings and conductor cross-sections for day-to-day operation.
Safety report and measurementsSigned original and digital transmissionOwner and network operatorLegal proof of initial compliance under the OIBT and baseline reference for future periodic inspections.
Equipment instructionsBound file or operating binderMaintenance servicesOperating instructions, trip unit setting thresholds and maintenance guidelines for the equipment installed.
Notice of completion of installationOfficial form (DNO / portal)Distribution network operatorAdministrative notification of completion of works allowing the connection file to be closed.

The sending of documents to third parties follows clearly defined routes. The distribution network operator receives the notice of completion of the works and, depending on the inspection interval of the installation, a copy of the safety report. For installations with a short inspection period requiring acceptance by an independent inspection body, or for special installations supervised by the Federal Inspectorate for Heavy-Current Installations, the measurement protocols and updated diagrams must be made immediately available to the appointed inspector.

Archiving in the project file and durability for operation

The electrician's work forms part of the lifespan of the building. The technical documents handed over must not disappear into inaccessible administrative archives: they form the "heavy-current" component of the project file. To ensure the effectiveness of future work, an up-to-date physical copy of the single-line diagrams of the distribution panels must be placed inside each electrical cabinet, in the plan holder provided for this purpose.

The building owner is the legal guarantor of the retention of the safety report and its technical annexes for the entire operating life of the installation, until the next periodic inspection. In the event of a sale of the building or a significant alteration of the circuits, this file attests to the state of the existing installations. Contractually, under art. 370 CO on acceptance of the work, the full supply of this compliant documentation discharges the contractor, except for defects that could not be detected during the regular inspection or that were intentionally concealed.

For the management of equipment instructions, sorting is essential: the electrician groups the maintenance leaflets of the surge arresters, adjustable thermal-magnetic trip units, staircase timers or impulse relays, discarding superfluous packaging. These data sheets specify the recommended tightening torques for the terminals and the test interval of the test buttons of the residual current circuit breakers. This methodical collection forms the real maintenance logbook that allows operating staff to operate the installation safely.

Handling disputes and incomplete files at acceptance

On construction sites in French-speaking Switzerland, the handover of the final documents of a heavy-current installation often crystallises financial tensions at the final account. When the client or the architect refuses to sign the acceptance record because the technical file is incomplete, the electrician must act methodically. Disputes generally concern three shortcomings: the absence of the as-built principle diagram in the distribution, the failure to supply the insulation measurement protocols or the omission of the maintenance manuals of specific devices.

Under art. 367 CO, the client inspects the state of the work as soon as it is able to and notifies the contractor of any defects. Missing or incomplete technical documentation constitutes a defect in the work within the meaning of the contract for work. If the revised diagrams or the legal certificates are not delivered, the client is entitled to withhold part of the amount of the works. The electrician cannot invoke a mere administrative delay to justify the absence of the safety report or of the cabinet diagrams marked up in red on site.

Handling common documentary non-conformities
Finding of deficiencyConsequence for acceptanceImmediate corrective action
Single-line diagrams not updated after changes to cable routingRejection of the project file and retention moneyJoint survey of the circuit breakers and CAD reissue within ten days
Safety report missing before final energisationNotice of completion blocked with the network operatorCarrying out the final in-house inspection and transmission of the official report
Operating instructions for surge arresters and thermal relays missingReservation entered in the acceptance recordCentralised digital compilation in durable PDF format

To close the construction site without improper retention, the electrician hands over an initialled provisional set on the day the team leaves, then submits the final file within thirty working days. Secure digital archiving at the electrician's premises protects the company in the event of a later claim by the site operator or a formal notice from an independent inspection body.

Frequently asked questions

Can the client block the entire balance of the invoice for a missing diagram?

No. The client may only withhold an amount proportionate to the cost of reconstituting the missing document. For an as-built diagram not finalised or a safety report awaiting issue, the permitted retention generally corresponds to the fees needed to have the panel surveyed and the document drawn up by a third-party technical office, and not to the full payment for the installation works carried out.

Who is responsible for keeping the safety report after the work has been handed over?

The legal responsibility for retention lies with the building owner. The electrician hands him the original safety report and the associated measurement protocols when the project file is handed over. The owner must produce this document whenever requested by the distribution network operator or during the subsequent periodic inspections laid down by the federal Low Voltage Installations Ordinance.

What should be done if a competing electrician modifies the panel without updating the diagrams handed over?

As soon as his services are complete, the electrician records in his internal archive file the exact version of the plans validated and handed to the client. If a third party subsequently works on the electrical panel without correcting the documents, the original company's liability is released for all non-conformities, overheating or tripping occurring on circuits added or modified after the official handover of the work.

Which equipment instructions must the electrician leave in the main panel?

The electrician places in the door pocket of the electrical panel the documentation essential for operation and emergency operations. This includes the data sheets of the surge arresters, main residual current circuit breakers, modular timers or impulse relays and source changeover switches. General catalogues of standard sockets or switches are excluded: only the service instruction sheets of the safety devices belong there.

Texts and standards cited

  • CO art. 367after delivery, the client inspects the state of the work as soon as it is able to and notifies the contractor of any defects; for a building work, it has 60 days to notify them and a shorter contractual period is void (para. 1bis, in force since 1 January 2026); each party may request an examination by experts (para. 2)