Skip to content
Website
🧱 CFC 232Installation: conduits, distribution boards and switchgearChapter 10 of 10 in the section

Site distribution board: residual-current protection, periodic inspection and extension leads

This chapter sets out the requirements for installing, operating and inspecting the temporary electrical supply on a construction site. You will learn how to set up a compliant distribution board in accordance with the NIBT, how to size the residual-current protection, how to record periodic inspections and how to rule out common bad practices involving flexible cables and extension leads in damp environments.

Key takeaways

  • Every temporary distribution board requires residual-current protection suited to each final circuit on the construction site.
  • The periodic inspection of the temporary installation is carried out at regular intervals, with a recorded measurement report.
  • Extension leads and cable extensions must have a heavy-duty elastomer sheath with no makeshift joints.
  • Sockets and plugs used outdoors require a minimum ingress protection rating against water splashes.

Designing and connecting a site distribution board that complies with the standards

The temporary site installation is subjected to direct mechanical damage, temperature variations, mud and high-pressure facade washing. From the delivery point of the distribution network operator, or downstream of a generator, the electrical distribution must guarantee a clear separation between the public network and the working circuits. The main site distribution board must have a robust enclosure, protected against dust and water splashes and locked, so as to prevent untrained persons from accessing the main isolating devices and the supply terminal blocks.

Minimum characteristics of the outgoing circuits on a site distribution cabinet
Circuit useVoltage and currentEnclosure protection ratingType of residual-current protection
Sockets for portable power tools230 V / 10 A or 16 AIP55 minimumRCD 30 mA type A or type F
Heavy three-phase equipment (saws, mixers)400 V / 16 A to 32 AIP55 minimumRCD 30 mA type A
Heavy machinery with frequency converter (cranes)400 V / 63 AIP65 recommendedRCD 300 mA selective type B
Temporary lighting circuits230 V / 10 AIP54 minimumRCD 30 mA type A

Earthing is the absolute guarantee of the effectiveness of the earthing system. When setting up a distribution board supplied from an overhead line or a ground-level junction box, the installer connects the main protective conductor to a dedicated earth electrode or to the foundation earth loop if the excavation is complete. The earth resistance must be measured and documented before the first machine is energised, in compliance with the NIBT requirements and the SUVA guidelines on temporary installations.

Periodically inspecting the equipment and improving the management of extension leads

Temporary distribution equipment deteriorates quickly through the repeated passage of dumpers, telehandlers or mobile scaffolding. Art. 82 LAA requires the employer to take, to prevent occupational accidents and diseases, all measures for which experience has shown the necessity, which are applicable according to the state of the art and which are appropriate to the given conditions. This responsibility requires a daily visual check and periodic measurement campaigns documented in writing on each temporary board.

  1. Initial visual and mechanical examinationCheck the stability of the frame, the integrity of the door, the absence of cracks in the enclosure, the condition of the cable glands and the watertight closing of the socket flaps.
  2. Continuity and insulation checkMeasure the continuity of the protective conductors between the main terminal and the earth contacts of each socket. Measure the insulation resistance at 500 V DC.
  3. Dynamic test of the residual-current trip devicesTrip the device using a calibrated test instrument. Check the actual tripping current and measure the tripping time at the rated current and at five times that value.
  4. Marking and recordingAffix a dated inspection label to the internal cover plate and enter all numerical results in the test report or the site log.
  • Always hang trailing cables on insulating brackets or fasten them to the scaffolding ledgers at least two metres above the ground.
  • Use heavy-duty rubber drive-over cable protectors in vehicle access areas and where cables cross tracks.
  • Definitively ban plugs repaired with adhesive tape or lacking their strain-relief cord grip.
  • Immediately scrap any extension lead with a crushed or cut sheath or with visible internal conductors.
  • Keep connection plugs raised on trestles or in suspended junction boxes during slab cleaning.

Operating the distribution board and managing residual-current trips

On a structural work or heavy renovation site, the temporary distribution board is subjected to extreme stresses: cement laitance splashes, mechanical impacts from machinery, mineral dust and water ingress. Even though the main cabinet is installed in accordance with the recognised rules, its daily operation remains the weak link of the electrical installation. Art. 82 LAA requires the employer to take all the necessary prevention measures, adapted to the actual working conditions, to protect the integrity of those working on site. In this harsh environment, the coordination of the residual-current devices (RCDs) must prevent both electric shock and nuisance tripping that paralyses the trades.

The simultaneous connection of mixers, compressors and pumping equipment regularly generates significant functional or capacitive leakage currents. When non-watertight extension leads lie in puddles at the foot of the board or at the bottom of an excavation, the deterioration of the insulation causes the immediate tripping of the 30 mA RCD. In this situation, the foreman or the installation electrician must never bypass a protective device or change its threshold. The SUVA guideline on electricity on construction sites requires strict separation of circuits: each socket or small group of outgoing circuits must have its own residual-current circuit breaker, so that an insulation fault on a sander does not interrupt the supply to the safety lighting or to water drainage.

For machines incorporating frequency converters or powerful rectifier bridges, such as tower cranes or mortar mixing plants, the electrician systematically installs a type B RCD. An insulation fault with a DC component would saturate the ferromagnetic core of a conventional type A or AC residual-current device, making it completely blind to dangerous AC leakage currents. The distribution board must remain locked outside authorised operating manoeuvres; only the hinged access windows to the circuit breakers and the cover plates of the outdoor sockets remain operable.

Operational monitoring of extension leads, plugs and mobile cables

Routing the current from the board to the working face or to the upper floors exposes flexible cables to crushing by dumpers, puncturing by formwork spikes and prolonged immersion. Under art. 3 OPA, installations must be kept at all times in a condition that meets the safety rules. The exclusive use of flexible conductors with a reinforced elastomer sheath resistant to oils and severe mechanical stress, of type H07RN-F or equivalent safety-yellow PUR, is essential. The use of light PVC domestic cables is formally prohibited by the SUVA safety guidelines.

Periodic checklist for mobile connections and secondary boards
Item checkedMinimum frequencyCritical inspection pointsAction required in case of non-conformity
Residual-current test buttonsWeeklyInstant tripping of the mechanism when the T button is pressedImmediate replacement of the faulty residual-current circuit breaker
Sheath of flexible cablesDaily (visual)No crushing, deep cuts, pinching or visible armouringScrap, or cut cleanly to make two sound lengths
Plugs and extension leadsBefore each useIP rating maintained (at least IP55), O-ring present, cable clamp tightReplace the plug; applying insulating tape is absolutely prohibited
Vehicle crossing pointsDailyProtection under solid cable ramps or rigid overhead suspensionClear them from running areas and place them in heavy-duty trunking

Plugs and final sockets are put under severe strain by sudden disconnections caused by pulling on the cable. A mobile plug whose cable gland has been torn out no longer guarantees the continuity of the protective conductor (PE) in the event of an impact, while allowing mud and run-off water to enter the terminal block. Extension leads must be hung with non-conductive insulating hooks along walls or formwork panels, at a minimum height that avoids any contact with waterlogged ground. Where crossing the ground on a traffic route is unavoidable, the use of vulcanised rubber cable ramps able to withstand heavy loads driving over them is required.

  1. Systematic sorting and taggingLock out and take to the workshop any site cable reel or drum with a broken plug, heat deformation or damaged cable, attaching a red out-of-service tag.
  2. Fully unwinding under heavy loadFully unwind the entire cable from a drum when supplying high-power equipment, to prevent destructive heating by the Joule effect at the core of the coil.
  3. Periodic metrological inspectionRegularly measure the continuity of the protective conductor with an installation tester at 200 mA and check the insulation resistance at 500 V DC between live conductors and earth.

Emergency procedure and handling of electrical non-conformities on site

On a structural work or heavy renovation site, failure of the temporary supply instantly paralyses activities while exposing all trades to fatal risks of electric shock. As soon as a definite insulation fault, recurrent residual-current tripping or physical damage to the distribution cabinet appears, the installation electrician applies an immediate shutdown protocol. Under art. 82 LAA, the employer takes, to prevent occupational accidents and diseases, all measures for which experience has shown the necessity, which are applicable according to the state of the art and which are appropriate to the given conditions. Handling faults on the temporary board allows no improvised fixes.

  1. Lockout and securing of the enclosureImmediately switch off the main circuit breaker at the head of the board, lock the main isolator with a padlock and display the formal prohibition to operate. Where the enclosure shows traces of water ingress, mechanical impacts that have degraded the minimum IP rating, or broken locks, the power is cut at the upstream cut-out of the distribution network.
  2. Methodical location of insulation faultsUnplug all plugs connected to the three-phase and single-phase sockets. Measure the insulation resistance at a DC test voltage of 500 V between live conductors and earth for each outgoing circuit. Eliminate any circuit showing a value below the standard threshold of one megohm, systematically inspecting cables submerged in flooded rafts or crushed by machinery passing over them.
  3. Remedial work, traceability and re-energisingImmediately remove damaged extension leads and replace damaged sockets with robust industrial connectors. Reset the residual-current circuit breakers rated at 30 milliamperes, then individually test their mechanical operation and tripping time. Record the operation in the periodic inspection register and report the incident to site management, in accordance with art. 3 OPA, which obliges the employer to take the measures that meet the recognised rules of technology.

Frequently asked questions

What residual-current protection is mandatory for the sockets of a site distribution board?

On a temporary construction site installation, all socket outlets up to 32 amperes intended for mobile tools must be protected, individually or in groups, by a residual-current device (RCD) with a maximum sensitivity of 30 milliamperes. Higher-rated three-phase sockets used for cranes or concrete plants require a residual-current setting appropriate to the power of the machine, while still ensuring continuous protection of persons against indirect contact.

How often must the installer carry out the periodic inspection of the board and cables?

According to the SUVA guidelines and the NIBT requirements, site electrical cabinets and their connecting cables undergo a weekly visual check by the users and a quarterly technical inspection by a qualified electrician. This in-depth examination includes the continuity check of the protective conductor, the measurement of the fault loop and the real tripping test of the residual-current trip devices. Each check must be recorded on a label affixed directly to the board.

What types of cables and extension leads are permitted on a damp construction area?

Only cables with reinforced insulation under a heavy elastomer sheath, of type H07RN-F or equivalent, are permitted on a Swiss construction site. Extension leads made of polyvinyl chloride (standard PVC) are formally prohibited because they become brittle in the cold and have poor impact resistance. Extension leads must be fitted with industrial plugs guaranteeing at least an IP55 protection rating with watertight closing flaps, preventing any water ingress when they lie on waterlogged ground.

How should you react to extension leads lying in standing water on a slab?

Electrical connections must never lie in puddles or be exposed to the passage of motorised machinery. The foreman immediately hangs the lines using synthetic hooks fixed to the formwork panels or to the scaffolding, at a minimum height of two metres. If a connector has been submerged, the power supply must be cut at the board before handling, the whole assembly must be thoroughly dried and the insulation of the PE conductor checked before the circuit breaker is switched back on.

Texts and standards cited

  • LAA art. 82general prevention rules: the employer takes, to prevent occupational accidents and diseases, all measures for which experience has shown the necessity, which are applicable according to the state of the art and which are appropriate to the given conditions; workers assist the employer (in particular, they use personal protective equipment).
  • OPA art. 3protective measures and installations: the employer takes the protective provisions and measures that meet the requirements of the ordinance, the other applicable occupational safety provisions and the recognised rules of safety engineering and occupational medicine.

In the same section