Skip to content
Website
🧱 CFC 232Lockout/tagout, dead working and arc flash riskChapter 3 of 10 in the section

Electric arc: what triggers it, and the protective equipment that limits burns

In a distribution board or industrial cabinet, a short circuit develops a plasma arc within a few milliseconds. You will learn to identify the switching operations and mechanical slips that initiate this discharge, to select clothing made of aramid fibres or flame-retardant cotton that does not melt onto the skin, and to combine face shield and insulating gloves in line with Suva guidelines.

Key takeaways

  • The electric arc releases extreme thermal radiation capable of igniting synthetic clothing within a few milliseconds.
  • Dropped tools, unsuitable measurements and forced insertion of devices are the main triggers of arc initiation.
  • A face shield certified against arc protects the eyes and face from splashes of incandescent metal.
  • Protective clothing must be non-melting and must fully cover the torso and bare arms.

Mechanical actions and switching errors: how the arc is initiated in an electrical cabinet

In a main distribution cabinet or a general low-voltage board, a short circuit is not limited to a circuit breaker tripping. As soon as the air ionises as a result of an insulation breakdown or accidental contact, an electric arc forms at several thousand degrees. The shock wave expels drops of molten copper, destroys the surrounding plastics and generates a sudden gas pressure. This thermal energy strikes the operator before a withdrawal reflex is even possible.

Short-circuit arc
A continuous luminous and thermal discharge passing through an ionised gaseous medium, triggered by an accidental conductive bridge or a dielectric breakdown between two different potentials.
  • The fall of an uninsulated hand tool or a screw into a live busbar system during work in the vicinity.
  • The use of a wrongly set multimeter, in particular one connected on the current or resistance range during a voltage measurement.
  • The slipping of an unprotected metal probe tip that simultaneously bridges a phase and the earthed metal frame.
  • The closing or opening under load of a disconnector or a knife-blade fuse switch without an arc-quenching chamber.
  • The forced plugging-in or withdrawal of a circuit-breaker chassis without first checking the mechanical locking of the poles.

The Suva guidelines remind us that the first preventive measure remains the complete de-energising of the board in accordance with the five safety rules. Working close to bare live parts without an intermediate insulating screen directly exposes the installer to the effects of the prospective short-circuit current of the installation, which is particularly high immediately downstream of a neighbourhood transformer.

Face shield, electrician's gloves and inert textile: the equipment that prevents ignition

To comply with the duty of prevention set out in art. 82 LAA, the employer must provide personal protective equipment suited to the working conditions and to the state of the art. Where there is an arc risk, wearing ordinary clothing made of synthetic fibres such as polyester, polyamide or nylon is strictly prohibited. These materials melt instantly under the thermal flux, stick to the skin and cause extremely deep third-degree burns that are difficult to treat.

Technical requirements for protective equipment against electric arcs
EquipmentRequired material or functionProtection criterion on the construction siteCommon mistake to avoid
Jacket and trousersAramid fibres, modacrylic or flame-retardant treated cottonTextile certified against thermal arc, long sleeves buttonedWearing a synthetic undergarment under the work jacket
Face shieldTinted polycarbonate with wrap-around chin guardFront, side and under-chin protection against radiationUsing simple safety glasses that are open at the sides
Protective glovesInsulating latex or elastomer covered with leather over-glovesDielectric insulation suited to the nominal voltage and mechanical resistanceWorking with ordinary textile handling gloves
Safety helmetInsulating thermoplastic shell without metal partsFirm hold of the shield with the chin strap fastened under the chinVentilated helmet with unobstructed air vents

The face shield must always be combined with a chin guard. In the event of an arc explosion at chest or waist level, the thermal blast rises along the body. A standard straight shield lets the hot blast pass under the visor, which burns the neck and the upper airways. The tint of the shield must also filter intense ultraviolet and infrared radiation without masking the perception of the colours of the conductors identified according to the NIBT.

In accordance with art. 3 OPA, safety measures must meet the recognised rules of technology. The state of wear of personal protective equipment determines its effectiveness. A scratched face shield, a jacket impregnated with oil or cleaning solvent, or insulating gloves showing microcracks during the air inflation test must be withdrawn from service without delay to safeguard the electrician's life.

Suva requirements and intervention doctrine regarding breaking capacity

The fundamental principle laid down by Suva and the Swiss electrical safety regulations remains the obligation to work de-energised whenever the technical condition of the installation allows it. Opening a general low-voltage board (TGBT) or a tertiary distribution cabinet without formal lock-out exposes the tradesperson to phenomenal current densities. Where measuring, diagnostic or voltage-absence testing operations must be carried out near bare conductors that have remained live, a prior assessment of the prospective short-circuit current at the point of intervention is essential. This calculation determines the thermal class of the equipment required in view of the possible incident energy. In accordance with art. 82 LAA, the employer takes all measures that experience has shown to be necessary, that the state of the art makes it possible to apply and that are suited to the given conditions, while the workers assist the employer by scrupulously using the personal protective equipment provided on the construction site.

During a bolted three-phase short circuit on a main busbar, the arc builds up in a few milliseconds, well before the upstream protection by high breaking capacity fuses or selective circuit breakers trips. The energy released sublimates the copper of the conductors: the metal passes instantly from the solid to the gaseous state, multiplying its volume by a factor of more than twenty thousand. This deflagration throws out incandescent metal fragments and generates an overpressure blast capable of tearing off the cabinet doors. At the same time, the radiant heat wave exceeds 10,000 °C at the core of the plasma column. No human withdrawal reflex can outpace this projection. This is why the Suva guidelines formally prohibit ordinary polycarbonate visors intended for grinding work: lacking specific absorbers against the thermal flux of an arc, they soften instantly and fuse with the skin of the face.

Operational checking of PPE and safe handling during switching operations

Personal protection against the thermal shock of the arc requires total compatibility of every layer worn by the electrician. The most serious mistake is to put on a work jacket treated against electric arcs over clothing or underwear containing synthetic materials such as polyester, polyamide or elastane. Even if the outer layer does not ignite, the heat transmitted by conduction and radiation passes through the inert fabric and reaches the melting temperature of these plastic materials. The molten synthetic polymers then stick irreversibly to the skin, causing deep third-degree burns that are particularly complex to treat in hospital. Every base layer must absolutely be made of heavy non-melting cotton, merino wool or textiles certified as inherently non-flammable.

Inspection grid and rejection criteria for PPE used in electrical work
Protective equipmentVisual and functional checkCriterion for immediate discarding
Arc face shieldOptical clarity, attachment to the helmet, date and class markingDeep scratches, thermal haze, crack on the edge or mechanical impact
Insulating gloves with over-glovesPneumatic test by manual rolling, absence of micro-porositiesPuncture on inflation, traces of oil or solvent, cracking of the latex
Protective jacket and trousersIntegrity of the protected zips, cleanliness of the fibresTear in the weave, splashes of glue or grease, wear at the cuffs
Insulating mats and profilesCleaning of the bearing faces, flexibility of the elastomer materialClean cut, starter crack, perforations caused by the edges of the busbars

The way a switching operation is performed on live equipment directly determines whether an electric arc occurs and how severe the exposure is. When disconnecting NH knife-blade fuses with an insulated grip handle or manually closing a main circuit breaker, the operator must never face the opening of the chassis. The prescribed posture requires standing at an angle, with the body offset sideways from the potential escape path of the ionised gases. The hand holding the handle or lever must make a firm, rapid and continuous movement: any hesitation or slowing prolongs the arc regime between the separating contacts, heating the surrounding air until three-phase breakdown. During closing, the face protected by the visor must be turned away from the cell to protect the airways from the sudden inhalation of toxic metal vapours.

Emergency protocol and action to take in an electric arc accident

When an electric arc is initiated in a cabinet or general low-voltage board (TGBT), the thermal deflagration and the shock wave take place in a fraction of a second. The blast throws out molten metal, ionised gases and plastic debris at several thousand degrees. The reaction of the team on site immediately determines the life-threatening prognosis of the injured installer.

  • Secure the area without causing a further accident: never step into the axis of the cabinet without first having triggered the emergency disconnection upstream, outside the danger zone.
  • Alert the emergency services immediately: dial 144, stating the nature of the accident, namely a high-energy electric flash and possible extensive thermal burns.
  • Remove the victim from the smoke-filled zone: if the atmosphere is saturated with combustion gases from copper and plastics, evacuate the casualty to a ventilated area.
  • Cool the thermal burns: apply clean water at room temperature (15 to 20 °C) for at least fifteen minutes, without using ice-cold water so as to avoid hypothermia.

Even if the electrician was wearing the face shield, the power of the flash can cause keratitis or corneal damage through intense ultraviolet radiation. An emergency ophthalmological examination is always required, as is a check of respiratory function in the event of inhalation of hot metal vapours.

After the victim has been evacuated, the electrical board remains locked out and untouched for the technical investigation. According to art. 82 LAA, the employer takes, to prevent accidents, all measures that experience has shown to be necessary, that the state of the art makes it possible to apply and that are suited to the given conditions, and the workers assist the employer, in particular by using personal protective equipment. The formal notification of the event to Suva and to the Federal Inspectorate for Heavy Current Installations (ESTI) must be made without delay in order to clarify the circumstances of the arc initiation.

Frequently asked questions

Can a face shield that has been subjected to an arc blast be reused on the construction site?

No. Even if the visor does not appear perforated, the thermal exposure and ultraviolet radiation irreversibly alter the polycarbonate matrix. Microcracks invisible to the naked eye and the degradation of the optical absorption properties make the shield incapable of withstanding a second arc initiation. The entire visor and its headband must be discarded immediately and replaced by new certified equipment before any further switching operation.

Why are synthetic undergarments strictly prohibited under arc-protective clothing?

Synthetic textiles such as polyester, polyamide or nylon melt at temperatures far below those generated by the arc. During a flash, the rise in temperature passes instantly through unsuitable clothing: the synthetic fibres liquefy and stick directly to the skin, creating deep third-degree burns. It is essential to wear only undergarments made of pure untreated cotton, wool or inherently non-flammable fibres.

What is the reflex action if an arc breaks out while plugging in a circuit breaker?

The absolute rule is never to try to take back or interrupt the operation by reversing it. If the movement has started, the arc stretches during an attempt to withdraw, increasing its duration and its volume of ionised gases. You must immediately lower your head to point the face shield downwards, step aside laterally from the axis of the cell and trigger the emergency disconnection upstream without touching any live parts.

Are insulating gloves for live work sufficient protection against an arc?

No, electrician's gloves made of latex or elastomer are designed for dielectric insulation, not to withstand flame or the radiation of an arc. Under the effect of thermal energy, the rubber melts and burns the hands. They must always be covered with siliconised leather over-gloves resistant to thermal and mechanical stresses, or supplemented by composite gloves combining dielectric properties with validated thermal protection against arcs.

Texts and standards cited

  • LAA art. 82general rules of prevention: the employer takes, to prevent occupational accidents and diseases, all measures that experience has shown to be necessary, that the state of the art makes it possible to apply and that are suited to the given conditions; the workers assist the employer (in particular by using personal protective equipment)

In the same section