Key takeaways
- Cut the voltage source immediately, before making any physical contact with the worker who has received the shock.
- The Construction Work Ordinance requires the organisation of first aid to be included in the safety plan.
- Call 144 without delay, giving the nominal voltage and the duration of exposure to the current.
- A medical assessment in the emergency department remains mandatory because of the risks of cardiac arrhythmia and internal necrosis.
Cut the supply before any contact and trigger the rescue chain
A witness's first reflex when faced with an electric shock accident is often to grab their colleague immediately and pull them away from the live conductor. This instinctive action is the most dangerous one possible: it creates a second casualty through muscular tetanisation of the rescuer. On a building construction site where trailing cables, temporary distribution boards and main distribution cabinets coexist, the team leader and the site manager must enforce an unbreakable rule: no one approaches the casualty until the installation has been cut off at the source.
- Clean, immediate cut-off of the installationPress the emergency stop button, operate the isolating switch at the head of the cabinet or switch off the main circuit breaker supplying the circuit concerned. The interruption of the source must be visible or guaranteed by a positive mechanical trip.
- Emergency release using approved insulating equipmentIf the disconnecting device is inaccessible or too far away, push the cable away or move the worker away using dry insulating equipment, such as an electrician's rescue pole or a dry untreated wooden batten, without ever touching the metal casing or the injured person.
- Telephone alert to the emergency medical serviceContact the 144 emergency medical dispatch centre, giving the precise address of the construction site, the building, the floor, the nominal voltage (230 volts single-phase or 400 volts three-phase), the estimated duration of contact and the worker's state of consciousness.
- Basic resuscitation and defibrillationAs soon as the area is made safe, check the victim's breathing. If the person is unconscious and no longer breathing, start chest compressions immediately in the centre of the chest and have the automated external defibrillator available on the construction site brought over.
The organisation of rescue cannot be improvised at the moment the emergency occurs. Art. 4 OTConst provides that, before work begins, the employer must ensure that there is a plan setting out the measures necessary for the work carried out on the construction site, including the organisation of first aid; this plan is drawn up in writing or in a form allowing proof by text. For an electrical installation company, this document sets out the location of the main cabinets, the presence of operating poles, the emergency numbers displayed at the access points and the identity of the first-aiders designated within the team.
Internal trauma caused by current and the obligation of medical examination
A particularly widespread misconception on construction sites leads electricians to downplay the jolts caused by 50 Hz alternating current at 230 V or 400 V. If the worker shows no spectacular skin burn, the temptation is strong to go back to work after a few minutes' rest. This attitude reflects a serious ignorance of electropathology: the human body acts as a heterogeneous resistance in which dry skin offers the only significant protective barrier.
As soon as the voltage crosses the epidermal barrier, the current flows preferentially through tissues rich in water and electrolytes, namely the blood vessels, nerve trunks and striated muscle. Two tiny pinpoint contact points can conceal the complete destruction of deep muscle bundles along the path of the current.
| Visible surface sign | Actual internal injury | Delayed clinical consequence |
|---|---|---|
| Small white entry mark | Current passing through the cardiac conduction pathway | Malignant arrhythmia, ventricular fibrillation |
| Scratch or minimal exit point | Thermal necrosis of muscle masses | Acute rhabdomyolysis and kidney damage |
| Slight tingling in the fingers | Electrical damage to the nerve sheath | Chronic paraesthesia and motor deficit |
| No apparent burn at all | Spasm and thrombosis of the vessel walls | Gradually appearing muscle ischaemia |
The main life-threatening risk lies in cardiac rhythm disorders. The passage of current through the chest disrupts the electrical activity of the myocardium and promotes loss of synchronisation that can progress to cardiorespiratory arrest several hours after the event. In addition, rhabdomyolysis releases into the bloodstream a large quantity of myoglobin resulting from muscle destruction. This bulky molecule clogs and destroys the nephrons, leading to acute kidney failure that requires urgent medical care.
Operational organisation of rescue and intervention protocol on the construction site
On a construction site with high-voltage installations, an electrical accident calls for an immediate, perfectly coordinated collective response. Art. 4 OTConst provides that, before work begins, the employer must ensure that there is a plan setting out the measures necessary for the work carried out on the construction site, including the organisation of first aid, this plan being drawn up in writing or in a form allowing proof by text. For the electrical installer, this requirement means clearly designating the company first-aiders, displaying the emergency numbers visibly near the site distribution boards and defining the access routes for rescue vehicles.
Intervention on a person who has received an electric shock tolerates no improvisation. A witness's first reflex is often to grab the victim to pull them away from the live conductor, which inevitably leads to a second accident through muscular tetanisation of the rescuer. Cutting the electrical supply beforehand takes priority over any attempt to approach. If the isolating device is not immediately accessible or identifiable, the victim must be freed exclusively using insulating equipment suited to the voltage class involved.
| Information to be given | Technical detail required | Purpose for medical dispatch |
|---|---|---|
| Exact location | Construction site address, floor, access landmark, presence of a guide | Quick guidance of the ambulance and the emergency medical team without loss of time |
| Current parameters | Nominal voltage (230 V, 400 V), direct or alternating current, duration of contact | Anticipation of the risk of ventricular fibrillation or deep burns |
| Path of the current through the body | Identified contact points (hand-hand, hand-foot, head-foot) | Immediate assessment of whether the cardiac axis or nerve centres were crossed |
| Initial clinical condition | Consciousness, spontaneous breathing, presence of a pulse, traumatic injuries | Immediate use of an automated external defibrillator (AED) and resuscitation |
As soon as electrical isolation is confirmed, the team leader or the designated rescuer applies the life-saving measures: checking breathing, clearing the airways, placing the victim in the recovery position if unconscious but breathing, or immediate cardiopulmonary resuscitation combined with rapid use of the automated external defibrillator (AED) if breathing is absent. At the same time, a worker is assigned at the site entrance or at the foot of the rising main to guide the paramedics directly to the cabinet or technical room concerned.
Mandatory hospital monitoring and post-accident traceability
A very widespread false belief on construction sites is that a worker who has received an electric jolt at 230 V with no skin burn and no loss of consciousness can resume work after a few minutes' rest. This attitude is potentially fatal. 50 Hz industrial alternating current interferes directly with the electrophysiological activity of the myocardium. A malignant ventricular arrhythmia or fibrillation can occur several hours after the contact, even though the electrician feels perfectly recovered.
Art. 82 LAA provides that, to prevent occupational accidents and diseases, the employer must take all measures which experience has shown to be necessary, which are applicable according to the state of the art and which are appropriate to the given conditions, while the workers assist the employer in this. In this context, company management and the foreman have a duty to require the systematic transport to an emergency facility of any employee who has had current pass through their body, including under compulsion if the person concerned refuses to stop working.
- Medical evacuation under supervision: direct transfer to hospital by professional rescue services or a suitable vehicle, with an absolute ban on letting the victim drive their own company vehicle.
- Continuous clinical monitoring: a 12-lead electrocardiogram on admission and continuous cardiac monitoring to detect the onset of ventricular extrasystoles or prolongation of the QT interval.
- Lock-out and freezing of the installation: mechanical locking of the disconnecting device with a personal padlock to prevent any untimely re-energising before the technical investigation.
- Formal notification of the event: accident report sent without delay to the accident insurer (Suva or private LAA insurer) and precise recording of the facts in the site diary.
- Technical analysis of the failure: checking the tripping chain (residual current circuit breaker, continuity of the PE protective conductor, earthing arrangement) to identify the origin of the fault before the installation is re-energised.
Handling degraded situations and conduct after an electric shock
On a construction site with high-voltage installations, the electrical accident often defeats ideal scenarios. If the emergency cut-off device is inaccessible, locked or damaged by a short circuit, the rescuer must under no circumstances touch the body of the live victim directly. The fundamental rule remains immediate isolation: trip the upstream protection at the main distribution board, disconnect the site supply or, as a last resort, separate the victim from the live conductor using a certified, dry, non-conductive insulating object, such as an electrician's rescue pole.
When the electric shock occurs without immediate loss of consciousness, the fatal reflex is to go back to work on the grounds that no external injury is visible. The passage of 50 Hz alternating current through the body causes cellular micro-injuries that are invisible on the surface: delayed cardiac arrhythmias, coronary vascular spasms and incipient rhabdomyolysis through destruction of deep muscle fibres. Burns at the entry and exit points never reveal the extent of internal necrosis.
- Immediately triggering the alarm chainCall 144, giving the exact location, the presumed voltage value and the path of the current through the body.
- Medical care under monitoringAlways take the person to a hospital for an initial electrocardiogram and continuous cardiac monitoring.
- Preserving the scene and recording the factsLock the circuit in question, note the ratings of the circuit breakers and lock out the installation to allow the technical accident investigation.
Frequently asked questions
What should be done if the main cut-off is inaccessible during an accidental contact?
Touching the victim with bare hands is out of the question, as it would result in immediate electric shock. The rescuer must operate the emergency stop of the site cabinet or open the floor sub-circuit breaker. If no operating device is accessible, the contact must be broken using exclusively an insulating rescue pole or a perfectly dry dielectric item, while immediately alerting the professional rescue services via 144.
Why see a doctor if the worker has no skin burn?
Electric current flows preferentially through low-resistance tissues such as nerves, blood vessels and muscle masses. Even without an external burn, the electrical shock wave can trigger fatal ventricular rhythm disorders several hours after the event, or cause a massive release of myoglobin that destroys the kidneys. Only a repeated electrocardiogram and a hospital blood test can rule out these delayed life-threatening risks.
What traceability obligations fall to the foreman after an electric shock incident?
The person in charge must lock out the installation involved, record the event in the site diary and immediately inform company management and the safety officer. In accordance with the applicable directives, an accident report with absence from work must be sent to the accident insurer, and the Federal Inspectorate for Heavy Current Installations must be notified according to the legal criteria governing serious electrical accidents involving personal injury.
Does the automated external defibrillator (AED) replace systematic hospital evacuation?
No. The defibrillator is used exclusively in the event of cardiocirculatory arrest, to deliver a shock in the case of ventricular fibrillation before the ambulance service arrives. If the victim remains conscious or recovers a regular heart rhythm, the danger of delayed secondary arrhythmia remains critical. Medically supervised transport to a hospital emergency department for twenty-four hours of telemetric monitoring remains strictly indispensable in every case of electric shock.
Texts and standards cited
- OTConst art. 4safety and health protection plan: before work begins, the employer must ensure that there is a plan setting out the measures necessary for the work carried out on the construction site, including the organisation of first aid; this plan is drawn up in writing or in a form allowing proof by text.
