Skip to content
Website
🧱 CFC 232Schematics, sizing and circuit protectionChapter 1 of 10 in the section

Earthing system: recognising a TN-S and what it requires of the installation

After reading this chapter, you will be able to formally identify a TN-S distribution on a drawing or in a switchboard, locate the separation bridge between the neutral and the protective conductor, and select without error the switching equipment required by the NIBT to ensure the safety of persons.

Key takeaways

  • The TN-S system clearly separates the neutral conductor and the protective conductor throughout the installation.
  • The physical separation of the PEN takes place exclusively upstream, at the service entrance cabinet or the main switchboard.
  • In a TN-S system, every insulated neutral conductor must be capable of being isolated by the main protective equipment.
  • It is strictly forbidden to reconnect the protective conductor with the neutral after their point of separation.

Identifying the TN-S structure on schematic diagrams and in the main switchboard

On low-voltage schematic diagrams compliant with Swiss standards, the TN-S system is recognised at once by the drawing of five separate conductors for a three-phase supply: three phases (L1, L2, L3), a neutral (N) shown in light blue and a protective conductor (PE) drawn in green-yellow. Unlike the TN-C, where the neutral and protective functions are combined in a single PEN conductor, the TN-S network maintains complete dielectric and mechanical separation between these two circuits throughout the final distribution.

TN-S system
Low-voltage distribution system in which the neutral point of the distribution transformer is directly connected to earth (T), the exposed conductive parts of the installation being connected to this point by a protective conductor (PE) kept separate (S) from the neutral conductor.

In site practice, the supply from the distribution system operator (DSO) frequently arrives as four conductors (three phases and one PEN), forming a TN-C system upstream. The transition to TN-S is made by creating the separation point. This nodal point is formed by a fixed copper bridge connecting the main earth bar (or PE bar) and the neutral busbar or terminal block.

  1. Location of the separation pointIdentify the connection point of the incoming PEN in the building's service entrance cabinet or directly on the busbar of the main general switchboard (TGP).
  2. Mechanical connection to earthCheck that the supply PEN conductor is connected first to the PE collector, itself interconnected to the foundation earth loop via the earth disconnector.
  3. Branching of the neutral conductorFit the removable link or bridging bar connecting the PE bar to the isolated neutral terminal block, thereby creating the source of the independent N conductor.

Direct consequences of the N/PE separation on the sizing of protective devices

Adopting the TN-S system entirely determines the choice of modular and switchboard equipment. Since the neutral is a separate live conductor that no longer performs any protective function, its switching arrangements follow the strict requirements of the NIBT. The neutral must not be switched off before the phases and must be isolated when single-phase or multi-phase final circuits trip, so as to guarantee complete isolation of the load during maintenance or troubleshooting.

Equipment requirements in a TN-S system according to the NIBT
Circuit typeRecommended equipmentHandling of the neutral poleResidual current protection
Single-phase final circuit 230 V1P+N circuit breaker or fuse + isolatorSimultaneous all-pole switching or neutral delayed on opening30 mA RCD required for socket-outlets and final circuits
Three-phase distribution 400 VFour-pole circuit breaker (3P+N or 4P)Mandatory isolation of the neutral pole on openingRCD required depending on the use of the equipment and the premises
Rising main4-pole switch-disconnectorNeutral pole isolable, no thermal protection requiredCurrent-based and time-based selectivity upstream

In a TN-S system, any direct insulation fault between a phase and the metal casing of an item of equipment immediately results in a phase-PE short circuit. As the fault loop has a very low impedance, the resulting short-circuit current acts on the magnetic release of the upstream circuit breaker. The electrician must check that this prospective short-circuit current ensures automatic disconnection within the times prescribed by the NIBT.

To ensure the safety of personnel during maintenance or lock-out work, the employer ensures that the general prevention rules are applied in accordance with art. 82 LAA, in particular by providing personal protective equipment suited to electrical risks when verifying the absence of voltage. The team leader thus ensures that the visual inspection of the separation point and the tripping tests are carried out under fully controlled operating conditions.

Location and physical form of the N and PE separation point

In an installation supplied in a TN system, changing from a distribution with a common PEN conductor to a TN-S configuration requires a single, irreversible separation point. According to the NIBT, this split is made as far upstream of the building as possible, traditionally inside the service entrance cabinet or directly on the main busbar of the main low-voltage switchboard (TGBT). In French-speaking Switzerland, the requirements of the distribution system operators (DSO) set the exact boundary between the concession area and the customer's internal installation, often at the level of the main overcurrent protective device.

Once the PEN conductor is split, the neutral busbar (N) and the protective earth busbar (PE) are physically isolated from each other by separate dielectric supports. The main equipotential bonding, connected to the foundation earth electrode via the earth disconnector, must always end at the PE collector, never at the N collector. Any subsequent bridging between these two circuits is strictly forbidden.

  1. Upstream connection of the PENConnect the PEN conductor to the main PE collector of the switchboard using a controlled-torque terminal (torque wrench set to the manufacturer's torque).
  2. Branching of the neutral conductorEstablish the link between the PE collector and the neutral bar by means of a removable solid copper separation bridge, rated for the nominal operating current.
  3. Connection of the earthingConnect the main earthing conductor from the foundation earth loop exclusively to the PE collector, downstream of the neutral branch bridge.
  4. Insulation test before energisingOpen the separation bridge to measure the galvanic insulation of the neutral network with respect to earth, at a test voltage of 500 V DC.

Single-line identification, equipment and inspection of the works

On schematic diagrams and single-line execution diagrams, the graphic clarity of the transition point prevents any confusion on the construction site. The NIBT requires standardised symbols and strict identification of live and protective conductors. The neutral conductor must keep its light-blue marking over its whole length, whereas the protective conductor bears only the two-colour green-yellow combination. The switching and isolating equipment must be chosen with care to preserve the integrity of the protection system.

Technical practice and equipment according to the zone of the TN system
Technical criterionUpstream of the separation (TN-C)Downstream of the separation (TN-S)
Conductor designationPEN (combined Protective and Neutral)N (Neutral) and PE (separate Protective)
Prescribed colour of the coresGreen-yellow with blue sleeve at the ends (or blue with green-yellow sleeve)Strictly light blue (N) / continuous green-yellow (PE)
Isolation and switchingFormal ban on inserting a single-pole or four-pole switching device on the PENMandatory switching of the N by the branch circuit breakers and RCDs (protected or isolated poles)
Sensitivity of residual current devicesIncompatible: an RCD cannot operate on a PEN conductorEssential: 30 mA RCD for socket-outlets and final circuits according to the recognised rules
Mechanical continuity and tighteningRigid bar or copper cable of at least 10 mm² with no fragile intermediate terminalStepped terminal blocks N and PE strictly separated on DIN rail

During inspections of electrical installations resulting in the safety report (RS), the surveyor or inspector systematically checks the physical routing. All-pole switching of the neutral (1P+N, 2P, 3P+N or 4P circuit breakers) is the operating rule of the TN-S system. The installer must ensure that the neutral pole opens after or at the same time as the phases, and closes before or at the same time as them, thus avoiding destructive transient overvoltages on single-phase equipment connected between phase and neutral.

Handling non-conformities and unlawful bridging downstream of the separation point

On renovation construction sites or when extending distribution boards, the electrical installer is frequently faced with accidental re-introductions of the neutral conductor onto the protective conductor. Once the official separation point has been established in the main switchgear assembly, any later link between the neutral and earth constitutes a major defect within the meaning of the NIBT. This parasitic re-connection allows the neutral load currents to flow through the metal exposed parts and cable trays, causing uncontrolled heating and falsifying the operation of the protective devices.

  1. Locating the parasitic re-connectionOpen the main switch of the secondary switchboard concerned. Disconnect the neutral link and measure the insulation resistance at 500 V DC between the N bar and the PE collector. A value below 1 MΩ confirms an abnormal galvanic connection downstream.
  2. Isolation section by sectionDisconnect each neutral conductor from the terminal block one by one until the re-connection disappears. Identify the faulty outgoing circuit, often caused by a mixed load connected under the old four-conductor system or by physical contact in a congested junction box.
  3. Restoring compliance of the circuitReplace the four-conductor connection with a five-conductor cable run from the distribution board. If the cable cannot be pulled without heavy civil engineering, art. 365 CO requires the client to be notified in writing in order to record the technical impossibility before any change of routing is undertaken.

Final validation necessarily involves measuring the leakage currents on the main protective conductor using a high-precision clamp ammeter. In nominal TN-S operation, no operating current must flow through the PE conductor. The measurement protocol must be recorded rigorously in the safety report drawn up in accordance with the OIBT before the installation is officially handed over.

Frequently asked questions

Can the neutral and the PE be joined again in a remote secondary cabinet?

No. The NIBT formally prohibits re-forming a PEN conductor once the separation between the neutral and the protective conductor has been made upstream. Any secondary switchboard supplied from a TN-S network must keep its N and PE bars strictly separate and galvanically isolated. Joining these conductors would feed operating currents back onto the metal casings of the building, causing electromagnetic disturbances and electric shock risks during work.

Why does an RCD trip immediately after a cooker is connected?

This classic case almost always results from a factory-fitted copper bridge between the N and PE terminals on the appliance's connection terminal block. Supplied for a four-conductor or non-separated single-phase network, the appliance splits the return current between the neutral and earth. The RCD's differential toroid detects this imbalance instantly and trips. This mechanical link must be removed before energising.

How should the separation point be clearly shown on the switchboard diagram?

On the single-line schematic diagram, the PEN conductor arriving from the upstream network is graphically split at the main earth bar into two separate conductors: a light-blue N conductor and a green-yellow PE conductor. The diagram must state the cross-section of the separation bridge, the exact location of the earth disconnecting link for measurement, and the explicit change from the TN-C designation to the TN-S designation.

What is the procedure if an existing outgoing circuit remains four-conductor?

Where an existing supply cable has only four wires to feed a sub-board, it is forbidden to connect it directly to a TN-S distribution if the neutral supplies single-phase equipment. Either the line must be replaced by a five-conductor cable, or the upstream cable must be kept as PEN in accordance with the minimum cross-section rules of the NIBT, and the N/PE disconnection and separation point must be positioned in this secondary switchboard.

Texts and standards cited

  • CO art. 365material and ground: the contractor is responsible for the good quality of the material he supplies; if the material supplied by the client or the ground designated by him is found to be defective, or if any other circumstance compromises the proper or timely execution of the work, he must inform the client immediately, failing which he bears the consequences (para. 3).

In the same section