Connections: Bolting, Welding and Inspection: The Execution Standard
Aimed at team leaders, site foremen and site managers in structural steelwork (CFC 215), this section details execution requirements governing structural connections under standards SIA 263 and SN EN 1090. From controlled tightening of preloaded bolts to sheltered site welds, here you will find practical methods, non-destructive testing protocols and anchoring rules to guarantee the definitive stability of load-bearing frames.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
0.50
Class A friction coefficient for shot-blasted surface without rust
+5 °C
Minimum steel temperature without preheating for standard welds
0.70
Minimum fraction of tensile strength for design preloading
2 mm
Maximum standard clearance for normal structural bolt holes
Technical Scope and Professional Boundaries
Connections form the core of structural safety in structural steelwork. This section deals exclusively with load-bearing connections of structural steel, whether for industrial frames, administrative building frameworks or façades whose primary load-bearing frame is metallic. The execution of these nodes demands strict compliance with standards SIA 263 and SN EN 1090, covering both torque-controlled bolted connections and welded continuity joints.
Operationally, the distinction between simple bearing connections and preloaded connections determines the level of inspection on site. Insufficient tightening or a contaminated friction surface immediately compromises the transmission of shear forces. In the same way, carrying out splice welds on the construction site requires documented qualifications and absolute control of atmospheric conditions, under penalty of rejection during non-destructive testing.
Methodological Path: From Workshop to Final Site Inspection
To ensure dispute-free execution, reviewing this section is organised in a logical sequence: component preparation, mastering connection operations, non-destructive checks and, finally, managing geometric non-conformities.
- Preparation and Structural Fasteners (C2-01 and C2-02)Start by mastering the behaviour of high-strength bolt assemblies, torque wrench calibration and the qualification of blast-cleaned, unpainted friction surfaces.
- Welding Organisation and Qualifications (C2-03, C2-06 and C2-07)Verify alignment between the WPS sheet and your welders' certificates before setting up heated shelters against inclement weather and planning the clamping sequence to limit shrinkage.
- Quality Controls and Support Interfaces (C2-04, C2-05, C2-08 and C2-09)Identify critical visual defects, commission dye penetrant or ultrasonic testing according to the execution class, then sign off on baseplate anchoring and stud shooting on composite slabs.
- Managing Unforeseen Adjustments (C2-10)Systematically consult the civil engineer before any attempt at reaming, thermal cutting or flame straightening to correct out-of-square assemblies.
Adherence to this sequence ensures unqualified acceptance of the as-built documentation by the site management. For welding on site, the employer implements appropriate technical measures in accordance with art. 82 LAA, protecting operators against fumes and thermal spatter hazards.
📘 Chapters in this section 10
High-strength bolting: torque tightening, method and report
Secure your torque tightening logs without risking rejection of your structural connections.
Connections: bolting, welding and inspectionPreloaded joint: preparation of friction surfaces and slip factor obtained
Achieve the certified friction coefficient by preparing your steels according to the required class.
Connections: bolting, welding and inspectionWelder qualification and procedure: papers to have before starting
Check your WPS and welder qualifications to avoid an immediate shutdown of the construction site by the engineer.
Connections: bolting, welding and inspectionWelding defects: undercut, lack of penetration, porosity, and what can be repaired
Distinguish immediately between tolerated defects and critical undercut requiring gouging and full repair.
Connections: bolting, welding and inspectionNon-destructive testing of welds: PT, MT, UT and RT
Select the correct non-destructive testing method to approve your weld beads without extra intervention costs.
Connections: bolting, welding and inspectionSite welding: wind, humidity, preheating and shelter
Erect an effective shelter and apply the required thermal preheating against wind and moisture.
Connections: bolting, welding and inspectionWelding distortion: shrinkage, weld sequence and clamping
Anticipate angular shrinkage and plan the run sequence to deliver members that are perfectly square.
Connections: bolting, welding and inspectionAnchoring a base plate in concrete: approved anchor, depth, and test
Anchor your column baseplates using certified anchors complying with specified depths and torques.
Connections: bolting, welding and inspectionShear studs: interconnecting the steel beam and concrete slab
Set up stud shooting through profiled decking to ensure perfect composite action with the slab.
Connections: bolting, welding and inspectionModifying a connection on site: drill, grind or heat, and why to ask
Avoid structural rejection by applying the official procedure prior to any unforeseen drilling or grinding.