Key takeaways
- Swiss thermal amplitude requires dimensioning based on an actual delta of eighty kelvins.
- A six-metre vertical mullion requires a top fixed point and a bottom sliding guide.
- The slotted hole must absorb cumulative thermal movement without jamming under wind load.
- A self-drilling screw fitted in the wrong place cancels sliding and causes buckling.
Calculating the site's thermal amplitude and dimensioning actual mullion clearance
On the Swiss Plateau as well as in Alpine valleys, a façade load-bearing framework experiences extreme variations. In winter, on clear nights, the metal frequently drops to -20 °C. In summer, a powder-coated aluminium section in a dark shade exposed to direct solar radiation easily reaches 80 °C on its surface. The design thermal amplitude thus reaches a differential of 80 to 100 kelvins. Neglecting this physical reality inevitably leads to major defects: glazing failures due to compression, shearing of anchors, or sudden banging noises during morning warm-up phases.
| Structural material | Expansion coefficient (mm/m·K) | Calculated elongation over 6 m (mm) | Recommended minimum free clearance (mm) |
|---|---|---|---|
| Structural steel (S235 / S355) | 0.012 | 5.76 | 8.0 |
| Stainless steel (austenitic) | 0.016 | 7.68 | 10.0 |
| Extruded aluminium (structural alloy) | 0.024 | 11.52 | 15.0 |
Calculating assembly clearance is not just about absolute elongation. It must imperatively incorporate the ambient temperature measured at the precise moment of assembly on the construction site. For a 6-metre aluminium mullion installed in October at a temperature of 10 °C, the foreseeable elongation towards the summer peak (80 °C, i.e. +70 K) represents approximately 10 mm of expansion. Winter shrinkage (-20 °C, i.e. -30 K) represents a shortening of more than 4 mm. The aperture of a slotted hole or the shadow gap at the base of the mullion must therefore provide a total free travel of at least 15 mm, centred according to these proportions and not symmetrically in a blind manner.
Designing fixed-point / sliding-point kinematics and preventing screw lock-up
To ensure structural stability while allowing thermal deformation, every curtain wall or composite structure mullion must have rigorous kinematics: a single fixed point and one or more sliding points. The fixed point carries the entire self-weight of the mullion, the weight of the glass infills, and perpendicular wind loads. It is generally positioned at the top of the element, anchored to the upper concrete slab by a sturdy bracket. The sliding points, located at intermediate floor levels and at the base, strictly absorb only horizontal wind loads while ensuring complete freedom of axial translation.
- Setting out the fixed bracketFix the mullion to the upper cleat using calibrated round holes and bolting torqued to nominal value, without unprescribed compressible shims.
- Mounting sliding bracketsMount brackets on machined slotted holes. Insert polyamide or Teflon washers and insulating bushes to prevent metal-on-metal contact and friction lock.
- Controlled tightening adjustmentTighten self-locking nuts to the reduced torque specified by the technical office, allowing sliding under minimal axial force while resisting wind load.
- Checking secondary interfacesVerify the total absence of cladding screws, spandrel angle brackets, or flashings connected simultaneously to the mullion and structural work without interlocking clearance.
Compliance with recognized trade standards requires absolute vigilance throughout the assembly sequence. The contractor remains liable for the conformity of the works and the adequacy of the means implemented, in accordance with art. 364 CO. When a metal façade expands by more than ten millimetres over a storey height, no finishing work accessory must restrain this movement. Waterproofing details, perimeter EPDM membranes, and reveal claddings must systematically include an expansion fold or a telescopic slider independent of the load-bearing profile.
Installation of expansion sleeves and telescopic guides
Splicing an aluminium or steel curtain wall mullion on a load-bearing metal framework requires freedom of axial sliding without transverse deflection. When crossing from one slab to another across a six-metre grid, the extruded or welded internal aluminium sleeve ensures the transfer of the moment of inertia against wind loads while providing longitudinal thermal travel. The extrusion must maintain its alignment without binding, which prohibits direct mechanical locking between the upper and lower mullions.
| Anchor type | Axial degree of freedom | Anti-friction device | Main function |
|---|---|---|---|
| Fixed point (mullion head) | Zero (total restraint in translation) | Direct steel/steel or aluminium contact | Resisting self-weight and wind load |
| Sliding point (intermediate connection) | Free along Z-axis (± 6 to 10 mm) | Polyamide bush or PTFE sheet | Out-of-plane guidance and axial absorption |
| Telescopic sleeve (base/head) | Axial sliding under air gap | Lubricated EPDM sleeve or POM glides | Continuity of inertia and weatherproofing |
On the construction site, the telescopic sleeve is inserted with controlled force into the lower section, rigidly anchored by crimping or screwing, while the upper mullion fits over the free section. A precise butt clearance is set using an installation jig during assembly. The ambient temperature at the time governs the opening of this joint: at 10 °C in mid-season, the engagement heel remains at mid-stroke, whereas installation in the middle of August at 30 °C requires this gap to be reduced so as not to exceed the maximum safety margin in severe winter frost at -20 °C.
Anchoring interfaces, façade brackets, and mechanical bridging risk
The fixing brackets connecting the metal façade to the heavy rolled-section frame must incorporate slotted holes to permit relative translation. The tightening torque applied to the assembly bolt is the most vulnerable point in the installation sequence. An overtightened bolt negates kinematic clearance through dry friction, while an improperly secured bolt works loose under repeated wind vibrations.
- Installing galvanic and sliding insulationSystematically insert a reinforced polyamide wear pad or a low-friction synthetic washer between the base of the metal bracket and the angle piece attached to the mullion to eliminate direct steel-aluminium contact and reduce the friction coefficient.
- Centred positioning of boltingAlign the threaded rod in the centre of the vertical slotted hole taking into account the section temperature during installation, using a temporary removable spacer to guarantee upper and lower travel reserves.
- Controlled torque tighteningApply the exact torque prescribed by the calculation report using a torque wrench, combining a Belleville spring washer or a self-locking nut to prevent completely crushing the sliding interface.
- Checking secondary fixingsVerify that no self-drilling screw added to hold a flashing, finishing sheet, or reveal cladding passes through both the fixed element and the moving element of the anchor bracket.
A typical failure in façade construction results from the uncontrolled addition of secondary fixings when installing flashing junctions or sill flashings. Installers, seeking to secure a drip profile or an edge stiffener, insert a self-drilling screw that ties the telescopic bracket to the structural work or adjacent mullion. By neutralising the slotted hole, this small-diameter hardware item blocks a thermal expansion force of tens of kilonewtons. In accordance with standard SIA 118, the execution of the works must strictly adhere to the workshop and installation drawings that define the boundary between fixed components and sliding zones.
Diagnosing and rectifying expansion lock-up on metal façades
On a metal-framed curtain wall, the emergence of sharp popping noises during morning sun exposure, localized creasing of flashing sheet metal, or visible distortion of a vertical profile systematically points to unforeseen mechanical restraint. As soon as the site's thermal amplitude acts on the framework, a locked six-metre mullion transfers colossal axial stresses into the anchor brackets and concrete slab. Before undertaking any removal, the installation crew must identify the exact binding point using a dial gauge or witness marks placed at the top and bottom of the element.
| Observed defect | Mechanical origin | Immediate corrective measure |
|---|---|---|
| Violent acoustic cracking on south façade | Excessive bolt torque in slotted holes | Loosen connection, install Teflon washers, and tighten to specified torque |
| Visible buckling of hollow section mullion | Self-drilling screw driven through sliding sleeve | Extract rogue fixing, rout out sufficient clearance, and realign profile |
| Failure of shadow gap or sheared angle bracket | Zero free clearance left during cold-weather installation | Trim mullion head to re-establish thermal travel allowance |
The most frequent cause remains fixings that cancel out clearance: a self-drilling screw added on the construction site to secure a flashing junction, penetrating both the mullion and its internal sleeve. This bridging accidentally transforms a sliding support into a fixed point. To restore kinematic function, the installer strips back claddings, extracts rogue fixings, and reams out the slotted holes if necessary using a portable router. They ensure that residual clearance matches the ambient temperature at the time of work.
When the work presents a defect compromising structural stability or mechanical integrity, the metal fabricator applies the provisions of the Code of Obligations (CO) concerning the remediation of immovable works. If the concrete anchoring substrate presents a misalignment preventing theoretical bracket travel, the contractor refers to the duty to notify established in CFC 201 to formally alert site management.
Frequently asked questions
How do you identify the cause of popping noises on a sun-exposed façade?
Popping noises stem from mullions abruptly overcoming the friction of overtightened anchors. The crew inspects the floor brackets: synthetic washers must rotate freely under the bolt head. They must check that no intermediate bracket has been locked by mistake. Using a torque wrench allows the connection to be loosened and retightened to the specified torque to restore longitudinal sliding without introducing transverse play.
What should be done if a mullion was installed without sufficient clearance in cold weather?
Installation carried out between zero and five degrees requires maintaining maximum expansion travel at the head of the profile. If free clearance to the upper mullion is insufficient, the element will bottom out at the first hot spell. Working from a cherry picker, the top end of the hollow section must be cut using a guided metal circular saw, the cut face deburred, and the sliding sleeve repositioned with the appropriate expansion clearance.
How can you prevent a cladding screw from locking a sliding sleeve?
Finishing sheets and flashings must always be fixed to only one side of the telescopic junction. The other end must rest in a free runner or feature a protected slotted hole. The site supervisor records the prohibition of screwing into the sleeve overlap zone on the installation drawings. A visual exclusion zone marked on the mullions in the workshop warns installers not to insert self-drilling screws there.
What tolerance should be applied when tightening bolts on a sliding point?
On a slotted bracket, tightening must not clamp the bearing washer solid against the bracket. The contractor uses self-locking nuts or locknuts paired with metal shoulder bushings or self-lubricating washers. Tightening stops at snug contact without crushing intermediate components, ensuring smooth sliding under temperature fluctuations without introducing play perpendicular to the glazing plane.
Texts and standards cited
- norme SIA 118General conditions for construction work
