Skip to content
Website
🧱 CFC 215Composite facades: glass, metal and fixingsChapter 7 of 10 in the section

Façade joints: structural silicone, compatibility and installation conditions

This chapter details the installation of structural silicone joints on metal curtain walls. You will learn how to verify the chemical compatibility of contacting components, validate the mechanical cross-section according to climatic loads and dead weight, and control thermo-hygrometric parameters during bonding to guarantee the safety of the structure.

Key takeaways

  • Structural silicone mechanically holds the glazing under the action of climatic loads.
  • Standard SIA 331 governs the design and installation requirements for these façades.
  • Any contact between sealants, setting blocks and backer rods requires a compatibility test.
  • Curing requires strict monitoring of temperature ranges and ambient relative humidity.

Mechanical design and chemical compatibility according to standard SIA 331

In a structural sealant glazing (SSG) metal curtain wall, the elastomeric sealant joint does not merely serve an air- and water-tightness function. It constitutes the sole structural element transferring wind suction and pressure loads from the glass to the aluminium or steel profile framework. Standard SIA 331 sets out the rules governing windows and curtain walls, requiring rigorous justification of the structural safety and serviceability of these connections.

Structural silicone
One-component or two-component high-modulus polymer sealant formulated to adhere permanently to glass and metals, dimensioned to take up permanent or dynamic mechanical stresses without cohesive or adhesive failure.

The cross-section calculation of the structural sealant bead is carried out in two distinct dimensions: the bite (contact height) and the joint thickness. The minimum bite depends directly on the design wind load and the allowable tensile stress of the silicone, generally specified in the manufacturer's technical approval. The minimum joint thickness is determined to absorb differential thermal expansion between the insulating glazing unit and the load-bearing metal profiles without exceeding the allowable shear strain.

Design parameters of the structural silicone joint
Geometric parameterMain load actionDesign criterionUsual order of magnitude
Bite (contact height)Wind pressure and suctionAllowable dynamic stress under extreme wind6 mm to 20 mm
Joint thicknessDifferential thermal expansionMaximum shear strain of the sealant6 mm to 12 mm
Height-to-thickness ratio (bite/thickness)Deformation capacityLimitation of internal triaxial stressesBetween 1:1 and 3:1

Ambient installation conditions and curing protocol on the construction site

Structural silicone is ideally applied in a prefabrication workshop under a controlled environment. When remedial interventions or direct bonding must imperatively be carried out on the construction site, temperature and humidity conditions become critical factors for assembly success. Extrusion must not commence without verifying that anodised or powder-coated metal surfaces and glass edges are chemically degreased and prepared in accordance with the validated procedure.

  1. Environmental monitoringMeasure ambient air temperature, profile surface temperature and dew point. Application is prohibited if the substrate temperature is below 5 °C or above 40 °C, or if it is less than 3 °C above the dew point.
  2. Cleaning using the two-cloth methodDegrease contact areas with the solvent recommended by the manufacturer. Wipe with a first clean cloth soaked in solvent, then immediately wipe off with a second dry, lint-free cloth before evaporation.
  3. Application of adhesion primerApply a thin, uniform film of bonding primer specific to the metal substrate. Strictly observe drying time and open time before injecting the sealant.
  4. Joint injection and toolingExtrude the silicone using a pneumatic gun without air entrapment, completely filling the cavity defined by the backer rod. Tool and compress the bead in a single pass to ensure complete wetting of the surfaces.

Glazed elements must be held by temporary setting blocks and mechanical retaining devices until complete cross-linking of the product. The holding period depends on joint thickness and ambient temperature: curing generally progresses at an indicative rate of 1 to 2 mm per 24 hours at 23 °C and 50 % humidity. Failure to observe these parameters compromises the internal cohesion of the bead, exposing the structure to technical sanctions under building regulations and engaging the metal constructor's direct liability in the event of defects.

Rebate dimensioning and bonding cross-section calculation

In a structural sealant glazed façade on a metal structure, the structural sealant bead ensures the full transfer of climatic loads between the glass and the load-bearing steel or aluminium profiles. It does not perform a superficial sealing or aesthetic finishing function: its failure leads directly to the fall of the glazing unit. The geometry of this bead complies with the rules of standard SIA 331 and the façade design calculation notes.

Technical calculations determine two inseparable quantities: the bite width (contact area between sealant and substrate) and the joint thickness (free rebate depth). The bite directly offsets wind suction as well as permanent loads if the system does not incorporate mechanical dead-load setting blocks. The thickness, meanwhile, provides the flexibility required to absorb differential thermal expansion between metal and glass without exceeding the polymer's allowable shear stress.

Minimum geometric criteria for structural silicone cross-sections
Geometric parameterMinimum dimension requiredGoverning load actionConsequence of undersizing
Bite width (adhesion)Calculated according to wind (min. 6 mm)Wind suction, pull-offAdhesive or cohesive failure under wind gusts
Joint thickness (depth)Calculated according to expansion (min. 6 mm)Shear from thermal expansionPremature sealant fatigue, debonding
Width-to-thickness ratioBetween 1:1 and 2:1Curing and joint kinematicsExcessive internal triaxial stresses

On-site adhesion testing and installation quality controls

Applying structural silicone on the construction site requires rigorous validation of adhesion on the actual batches of coated or anodised metal profiles and glazing units. Art. 364 CO sets out the contractor's obligations: the contractor is liable for the proper and faithful execution of the work and must deploy technical means to guarantee the safety of the works. No installation must commence without a formal compatibility report provided by the silicone manufacturer for the project's exact colours and coatings.

  • Verification of the compatibility of glazing blocks, backer rods, spacer tapes and edge sealants of insulating glass units to preclude any migration of plasticisers into the structural silicone.
  • Cleaning of surfaces using the two-lint-free-cloth wiping principle, using a certified grease-free solvent (isopropyl alcohol or cleaner recommended by the sealant formulator).
  • Application of the adhesion primer specific to the substrate (stainless steel, powder-coated or mill-finish aluminium) if required by the technical approval documentation, strictly adhering to the flash-off time.
  • Inspection to ensure the absence of condensation, frost or moisture film on metal and glass prior to sealant extrusion.
  1. Adhesion check by preliminary pull-off testApply test beads to construction site profiles and offcuts of glazing. Following complete curing (7 to 21 days depending on whether a one- or two-component system is used), perform a manual 90-degree peel test with a utility knife cut to verify 100 % cohesive failure within the body of the silicone.
  2. Continuous logging of thermo-hygrometric conditionsRecord the ambient temperature (generally between 5 °C and 35 °C), relative humidity (above 40 % for neutral-cure one-component sealants) and the surface temperature of the metal, which must be at least 3 °C above the dew point, in the site logbook.
  3. Archiving of batch numbers and monitoring specimensRetain a daily extrusion butterfly sample (cure test), dated and labelled, linked to the cartridge or drum batch numbers used, to ensure full traceability for each metal façade grid.

Non-conformities, adhesion failure and remediation of structural bonding

On a metal-framed curtain wall, the structural silicone joint ensures the full transfer of wind and suction loads to the steel or aluminium mullions and transoms. An adhesion failure or non-conforming rebate geometry directly compromises structural safety. The contractor responsible for the structure and glazing applies the recognised codes of practice to maintain envelope stability in the event of deviations detected on the construction site.

Contractual handling of the issue aligns with the company's general obligations. If a powder-coated or anodised aluminium substrate exhibits greasy contamination, or if incompatibility with backer rods is detected, the contractor refers to the duty to notify developed in the CFC 201 trade rather than attempting a hazardous bonding operation. Deliberate application of a structural sealant on an unapproved interface engages execution liability under art. 229 CP, which penalises anyone who intentionally breaches the recognised rules of the art of building and knowingly endangers the life or physical integrity of persons.

  1. Mechanical securingInstall temporary spot clamping devices on the steel or aluminium framework to take up wind suction.
  2. Cutting out and removal of defective beadCut away the structural sealant flush using pneumatic oscillating tools without scratching the metal or damaging the insulating glass unit spacer bars.
  3. Chemical preparation and re-applicationClean the substrate using the two-cloth method with the approved solvent, reapply the approved primer, then cure under strict thermo-hygrometric control according to standard SIA 331.

Frequently asked questions

Can a structural silicone joint be injected in the rain if the façade is sheeted over?

Injection under sheeting remains prohibited if relative humidity exceeds the manufacturer's specified limits, often set at 85 %, or if the metal temperature is near the dew point. An invisible film of moisture on aluminium or steel profiles instantly compromises structural sealant adhesion. Total drying of the air and substrates must be awaited before applying the primer and then the sealant.

What must be done if the actual bonding cross-section is smaller than the engineering drawings?

A joint cross-section smaller than the dimensioning calculated according to standard SIA 331 reduces the surface area available to resist wind suction forces. The site foreman suspends injection of the panel and notifies the façade engineer. Two technical options are available: correct the mechanical alignment of the frame in the workshop or on site, or add concealed through-mechanical retaining clips to compensate for the structural bonding deficit.

Why does a standard polyethylene backer rod sometimes cause debonding?

Unqualified backer rod foam contains plasticisers or oily release agents that migrate into the structural silicone sealant during thermal cycles. This chemical contamination destroys cross-linking at the root of the rebate and causes adhesive failure on the metal framework. Only materials tested in accordance with chemical compatibility requirements may come into direct contact with the silicone.

How should destructive adhesion tests performed on test pieces be logged?

Peel tests on control profiles must be recorded on a precise construction site report. This document notes the silicone batch number, installation date, temperature, relative humidity and the percentage of cohesive failure obtained. Failure must be 100 % purely cohesive within the body of the silicone. Any adhesive debonding from the metal requires complete rejection of the injected batch.

Texts and standards cited

  • OTConst art. 17protection against structural collapse or falling objects and materials: at workstations and passageways, measures must be taken so that workers are not endangered
  • CP art. 229breach of the recognised rules of building: whoever, in directing or executing a construction or demolition, intentionally breaches the recognised rules of the art and knowingly endangers the life or physical integrity of persons shall incur a custodial sentence of up to five years or a monetary penalty; in the case of negligence, up to three years or a monetary penalty
  • norme SIA 331Windows and window façades: requirements for design, dimensioning and installation of joinery and mixed façades

In the same section