Key takeaways
- Mechanical ventilation continuously extracts heavy solvent vapours before any accumulation at floor level.
- Breathing apparatus or filtering respiratory protection is required depending on confinement and pollutant concentration.
- All electrical and mechanical equipment present within the ventilated volume must be explosion-proof certified.
- Spark-generating operations are prohibited near preparation and application areas.
Ensure air renewal and vapour capture in enclosed spaces
Ambient air at workstations contains between 19 and 21% oxygen by volume and the limit values for hazardous substances are not exceeded (para. 1). Hazardous substances are evacuated to the open air, filtered, or diluted by mechanical ventilation (para. 2). Air quality is regularly checked (para. 4). If technical or organisational measures are insufficient, respiratory protective equipment must be used (para. 5).
art. 33 OTConst
During the anti-corrosion treatment of steel structural elements, airless spray application releases significant quantities of volatile organic compounds. In a spray booth or an enclosed workshop enclosure, solvent vapours such as xylene or acetates have a density greater than that of air. They accumulate rapidly in low points, gullies, and inside hollow sections. Simple natural ventilation through openings remains ineffective at breaking up these stagnant pockets and maintaining a breathable atmosphere.
The employer must ensure rigorous maintenance of the extraction systems. Clogging of pre-filters causes an immediate pressure drop that reduces the volume flow rate below the solvent dilution threshold. Differential pressure gauges fitted to the filter housings allow media fouling to be monitored. In the event of an extraction fan failure, the pneumatic or electrical supply to the paint application pumps must be interlocked to cut off spraying instantly.
| Workstation configuration | Airflow principle | Required monitoring |
|---|---|---|
| Enclosed vertical-flow booth | Inlet ceiling plenum and grated extraction pit | Underpressure measurement and clogging monitoring via pressure switch |
| Open horizontal-flow application area | Front extraction wall with low-level capture | Periodic anemometer checks across the extraction face |
| Internal treatment of large hollow sections | Mobile extraction fan with flexible spiral ducting | Continuous multi-gas detector with audible alarm for oxygen and LEL |
Define respiratory equipment and eliminate any ignition risk
The choice of respiratory protection depends directly on confinement and exposure duration. In accordance with the general prevention rules set out in art. 82 LAA, the employer adapts measures to the given conditions and the worker uses the personal protective equipment provided. During continuous liquid spray painting in enclosed spaces, cartridge filter masks suffer from rapid saturation limits that make them unsuitable for extended spraying passes.
- Exposure level assessmentIdentify the volatility of binders and hardeners (polyurethanes, epoxies) and the possible presence of isocyanates requiring specific protection.
- Adoption of supplied-air breathing apparatusPrioritise a hood or full-face mask supplied with deoiled, pressure-regulated breathable compressed air, ensuring constant positive pressure against gas ingress.
- Exceptional use of combination filtersFor short-duration spot touch-ups, use a half-mask fitted with a combination filter for organic vapours (Type A) and fine particulates (Class P3).
A solvent-laden atmosphere presents a constant risk of deflagration if the concentration reaches the lower explosive limit. Any thermal, mechanical, or electrostatic source must be eliminated from the perimeter. Lighting, ventilation motors, switches, and controls must comply with explosion protection standards. Metallic components of the installation, lifting jibs, spray guns, and steel structures being painted must be connected to an equipotential bonding system and earthed to dissipate electrostatic charges generated by the flow of pressurised fluids.
Atmospheric monitoring and extraction airflow control in confined spaces
Applying two-component anti-corrosion coatings to heavy structural steelwork or composite facade framing causes massive evaporation of organic solvents such as xylene or butyl acetate. In an enclosed space, inside a steel box girder, or in a confined area of the workshop, vapours accumulate at floor level because their density exceeds that of ambient air. OTConst art. 33 specifies that ambient air at workstations must contain between 19 and 21% oxygen by volume, that the limit values for hazardous substances must not be exceeded, and that air quality is regularly monitored.
To meet these requirements, local exhaust ventilation must be started up even before opening drums of resin and thinner. Flexible antistatic spiral ducts for mechanical ventilation are positioned at the lowest point of the space, directly below the structural steel element being treated. Fresh outdoor air supply must exactly compensate for the extracted flow rate to avoid uncontrolled depressurisation of the work area, which causes turbulence that drives spray mist back towards the operatives' respiratory tracts.
| System component | Technical operating criterion | On-site check point |
|---|---|---|
| Exhaust air ducts | Conductive material with integrated earth braid | Electrical continuity to the workshop earth |
| Extraction fan | Sealed motor outside the airstream or explosive-atmosphere certified | Absence of hot spots on the motor casing |
| Air intake grille | Positioned less than 30 cm from the working floor | Continuous extraction without recirculation to clean areas |
| Paint-stop filter | Dry filter media with differential pressure gauge | Saturation checked prior to applying each batch |
The workshop manager or foreman verifies, using a portable explosimeter and a calibrated oxygen meter, that the atmosphere remains stable during the spraying of epoxy primer coats and polyurethane finishes. Exhaust discharge must vent to the outside, far from any fresh air intake or traffic area, to prevent the re-entry of harmful gases.
Ignition source isolation protocols and filter maintenance
Pneumatic atomisation of anti-corrosion paints generates significant electrostatic charges on the gun, the product transfer hose, and the substrate steel sections. To eliminate electrical arc initiation in contact with air-solvent mixtures, full equipotential bonding is mandatory. All intermediate storage drums, the spray pump, the gun, and the supporting structure must be connected to a common earthing terminal via clamping bronze clips.
- Lockout of electrical sourcesIsolate and lock out the power supply to non-explosion-proof workshop electrical equipment located within the footprint of the enclosure.
- Establishment of the equipotential networkAttach earth cables to the bare steel of the structure, the airless pump, and the solvent containers prior to any fluid transfer.
- Supplied-air mask checkVerify the breathable airflow of the hood or full-face mask, supplied from a remote compressor outside the contaminated zone and fitted with a coalescing filter and activated carbon.
- Monitoring of soiled rags and wasteDeposit cleaning residues and solvent-soaked wiping rags in metal bins closed with a self-closing lid to prevent spontaneous combustion.
The applicator's personal equipment must also include static-dissipative safety footwear and solvent-resistant overalls free of synthetic fibres that generate sparks through friction. In accordance with the general prevention rules of art. 82 LAA, the employer provides these protective means adapted to the actual application conditions, whilst workers have the responsibility to scrupulously use the respiratory protective equipment provided.
At the end of the shift, the mechanical ventilation system must remain running during the primary evaporation phase of the steelwork. Stopping the extraction prematurely, whilst the paint film has not begun curing fully, recreates a flammable pocket within the room in a matter of minutes. Managing these risks forms an integral part of the steelwork contractor's construction site preparation; for a detailed analysis of the installation costs for mobile extractors and breathable compressed air equipment, refer to the costing section under /soumissions/.
Emergency management and operational withdrawal in enclosed spaces
Spray-applying anti-corrosion coatings to structural steelwork inside confined spaces—bridge box girders, structural service shafts, or partitioned workshop rooms—exposes the applicator to rapid degradation of the working atmosphere. A mechanical failure of the extraction unit, a torn duct, or sudden filter saturation turns the space into a pocket saturated with solvent vapours, combining an acute poisoning risk with an explosive atmosphere.
In accordance with OTConst art. 33, ambient air at workstations must contain between 19 and 21% oxygen by volume and the limit values for hazardous substances must not be exceeded; hazardous substances are discharged to the open air, filtered, or diluted by mechanical ventilation, air quality is regularly monitored, and if technical or organisational measures are insufficient, respiratory protective equipment must be used.
- Immediate shutdown and lockingAt the slightest alarm signal from the portable explosimeter or in the event of a noticeable drop in airflow draught, the applicator releases the trigger, engages the safety catch of the airless gun, and shuts down the pump, which must be located in a safe external area.
- Emergency evacuationThe operative exits the space without removing their supplied-air breathing apparatus or full-face mask. Ground connections (high-pressure hoses, earthing cable) are abandoned in place to avoid generating mechanical friction sparks during exit.
- Securing the perimeterThe safety watcher stationed at the manhole or access point secures the entrance, prohibits any non-explosion-proof electrical resetting, and activates standby extraction fans to sweep the volume from the lowest point to the outside.
Frequently asked questions
What type of respiratory mask should be used when painting steelwork inside an enclosed box girder?
In an enclosed space without natural air renewal, half-masks with A2P3 filter cartridges saturate too quickly and do not prevent oxygen deficiency. A full-face mask with breathable compressed supplied air must be specified, fed by a dedicated line separate from the spraying air, or a powered air purifying respirator with a sealed hood, ensuring constant positive pressure to prevent direct ingress of atomised volatile solvents.
How should mechanical ventilation ducts be positioned to purge solvent vapours?
Aromatic or epoxy solvent vapours are significantly denser than ambient air and settle at the bottom of structural box sections. Extraction must take place at the lowest point, as close as possible to column bases or the bottom of beams. Fresh air supply is directed at high level to create a continuous sweep that prevents recirculation of contaminated air.
What precautions must be taken to eliminate any ignition source during touch-ups?
All construction site tools must be explosion-proof certified for hazardous areas. The setup includes electrical continuity of the steel structure via earthed equipotential bonding cables, total exclusion of grinders or welding equipment within a safety radius, and the use of sealed low-voltage lighting. Mobile phones and unprotected portable tool batteries remain outside the area.
What should be done if the explosimeter triggers a pre-alarm at 20% of the lower explosive limit?
The alarm requires the immediate stoppage of painting operations and the evacuation of the operative to safety. The material supply to the airless pump is shut off without disconnecting pressurised couplings, then the space is evacuated without removing the mask. The watcher maintains mechanical extraction at full capacity until the solvent concentration returns to zero before any re-evaluation of the ventilation system.
Texts and standards cited
- OTConst art. 33air quality: ambient air at workstations contains between 19 and 21% oxygen by volume and the limit values for hazardous substances are not exceeded (para. 1); hazardous substances are evacuated to the open air, filtered, or diluted by mechanical ventilation (para. 2); air quality is regularly checked (para. 4); if technical or organisational measures are insufficient, respiratory protective equipment must be used (para. 5).