Key takeaways
- Load calculation incorporates the actual mass of triple glazing and laminated glass.
- Suva directives require two independent vacuum circuits or redundant mechanical safety.
- Each vacuum circuit must have its own buffer tank and an operational alarm.
- Rigorous physical cordoning off strictly prohibits any passage beneath the glazing during overhead manoeuvres.
Selecting a certified lifter and managing the vacuum reserve
Installing thick glass units onto a steel supporting structure demands absolute rigour when selecting handling equipment. Modern insulating glazing, often combining three panes of toughened or laminated glass to satisfy thermal and acoustic requirements, rapidly reaches considerable masses. A standard sheet of glass has a density of 2.5 kg per millimetre of thickness and per square metre of surface area. A triple glazing assembly featuring laminated safety glass can easily exceed 80 kg per square metre, pushing entire panes beyond 600 kg. Load evaluation tolerates no approximation when defining lifting equipment.
To manoeuvre such elements on a construction site, the metal constructor must use a certified vacuum lifter compliant with the requirements of the Ordinance on the Safety of Machinery (OMach, RS 819.14). To prevent occupational accidents and diseases, the employer must take all measures shown by experience to be necessary, applicable according to the state of the art, and suited to the given conditions, in accordance with art. 82 LAA. For outdoor construction site operations where personnel guide the unit, Suva directives and recognised technical rules require the use of appliances equipped with two separate vacuum circuits or a secondary mechanical retention device.
The vacuum reserve plays a crucial role during pump failure or battery cut-out. The buffer tank volume must maintain the vacuum above the critical threshold long enough to place the unit on the ground or secure it into the steel frame. The appliance must incorporate an audible and visual warning device that triggers as soon as the pressure drops below the safety limit. This system alerts the crane operator and erectors to a loss of seal well before the material detaches.
| Inspected component | Inspection point | Acceptance criterion |
|---|---|---|
| Rubber sealing lips | Cracks, soiling, deformations | Perfect elasticity, absence of grease or dust |
| Circuits 1 and 2 | Vacuum buildup under test suction | Nominal pressure reached, maintained without rapid drop |
| Alarm system | Simulation of a vacuum drop | Immediate triggering of audible and visual signal |
| Suspension sling and pins | Mechanical deformations, safety cotter pins | Intact components, pins in place and locked |
Rigorous cordoning and management of the exclusion zone under the installation trajectory
Even with an approved dual-circuit lifter, handling a glazed panel presents a major hazard of sudden breakage or falling. At workstations and passageways, measures must be taken so that workers are not endangered, in accordance with art. 17 OTConst. Transporting glazing over unrestricted accessible areas exposes the construction site to serious accidents. The load travel zone must imperatively be subject to strict zoning and impassable physical cordoning.
- Exclusion zone under load
- Perimeter on the ground and on scaffolding decking covering the travel path of the glazing, increased by a dispersion radius to contain shards in the event of breakage under stress.
The absolute ban on standing or walking beneath the suspended load applies to all trades present. The metal construction site foreman erects rigid barriers or red-and-white warning tape at the base of the building and blocks off access to walkways located within the operating radius. Warning signs must explicitly indicate the heavy lifting hazard in progress. During final approach against the metal mullions, guiding is carried out exclusively using tag lines secured to the lifter, thus avoiding placing hands beneath the edges of the glass.
- Cleaning and perimeter markingDegrease the suction pad contact area with residue-free cleaner and install physical barriers on the ground to prohibit access beneath the crane trajectory.
- Vacuum suction and static testActivate both vacuum circuits, check that pressure gauges are in the green, lift the glazing 100 mm off the stillage and observe pressure retention for one minute.
- Travel controlled with tag linesMove the load slowly at minimum height, without slewing over personnel, with rope access technicians and erectors keeping the unit aligned from outside the hazard cone.
- Presentation and setting on the frameworkInsert the glazing into the rebate of the load-bearing steel profiles, position the required setting blocks and edge spacers before deactivating the vacuum.
Installation kinematics and wind resistance of heavy glazing
Moving a glass unit for a mullion-transom facade demands total control over dynamic forces. A large triple-glazed unit develops considerable inertia and offers a major surface area for wind exposure. As soon as it leaves the transport stillage, suspension by construction site crane or mobile crane lorry exposes the unit to local aerodynamic turbulence, amplified by the wind tunnel effect along metal facades.
Tilting from the inclined position on the stillage to the vertical heavily mobilises the lifter's tilting and rotation mechanisms. This operation must imperatively be carried out at reduced speed, as close as possible to the ground of the buffer storage area. Direct manual guiding of the glass is prohibited until the load is stabilised at chest height directly opposite its insertion plane: only synthetic tag lines of sufficient length allow orientation control without personnel entering under the unit.
| Indicative glass make-up | Cumulative thickness | Indicative weight per m² | Load per suction pad (safety factor x2) |
|---|---|---|---|
| Standard thermal double glazing (6/16/44.2) | 20 mm of glass | 50 kg/m² | 1.0 kN/m² |
| Heavy acoustic triple glazing (8/16/6/16/44.2) | 22 mm of glass | 55 kg/m² | 1.1 kN/m² |
| Reinforced safety triple glazing (88.4/16/8/16/66.2) | 36 mm of glass | 90 kg/m² | 1.8 kN/m² |
| Triple laminated burglar-resistant glass (1010.4/16/10/16/88.2) | 46 mm of glass | 115 kg/m² | 2.3 kN/m² |
Shear force on the suction pad lips during vertical lifting constitutes the most critical phase for grip. When the glazing transitions from horizontal to vertical, the coefficient of friction between the elastomer and the glass surface governs retention. The presence of surface moisture, morning condensation, sealant silicone residues or construction site dust drastically reduces this friction and can cause slippage under load, regardless of the vacuum level measured on the pressure gauge.
Approach handling, insertion into the framework and release
Introducing the glazing into the rebate of the metal framework requires millimetre-accurate coordination between the crane operator and the metal constructors positioned on the work platforms. The final approach is carried out using precision light hoists or compact manipulators to eliminate jolts from the main winch. Art. 17 OTConst stipulates that at workstations and passageways, measures must be taken so that workers are not endangered by falling objects and materials.
- Local cleaning and degreasingWipe down the gripping area on the glass using a residue-free volatile cleaner. Visually check the condition of the lifter's rubber sealing lips: no cuts, mastic soiling, or incipient tears.
- Locking the vacuumApply the lifter at the geometric centre of gravity of the unit. Switch on the vacuum pump, wait for automatic shut-off after full vacuum is reached (minimum 0.7 bar relative vacuum) and lock off the independent dual circuits.
- 100 mm proof liftLift the glazing 10 to 15 cm off the storage stillage. Disconnect the main power supply for one minute to validate the autonomy of the air reserves and verify that audible pressure-drop signals do not trigger.
- Guided transfer and insertionTraverse the element on the hoist rope with two opposing wind restraints. Position the load directly in front of the metal framework, place the bottom edge onto calibrated setting blocks, then tilt gently into the rebate.
- Mechanical securing before ventingImmediately install temporary pressure plates screwed onto the aluminium or steel profiles before opening the depressurisation valves to release the suction pads of the lifter.
The setting blocks for the glazing support the entire permanent dead load and transfer these loads to the vertical mullions via screwed setting block supports. These rot-proof synthetic support pieces must possess adequate Shore hardness (generally 70 to 90 Shore A) to prevent any creep under the tonnage of a triple-glazed unit. The lifter must never be used to force the unit into its rebate during mechanical alignment: any twist induced on the glass under vacuum can cause spontaneous breakage from point bending.
Site organisation must also comply with general prevention rules defined in art. 82 LAA, under which the employer takes, to prevent occupational accidents and diseases, all measures shown by experience to be necessary, applicable according to the state of the art, and suited to the given conditions. Assigning technicians trained in the specific operation of the selected lifter model and in guiding suspended loads ensures the safety of this sensitive installation phase.
Managing lifting incidents: vacuum loss, loss of control and securing
On a mullion-transom metal facade construction site, handling triple glazing weighing several hundred kilos allows no improvisation when a technical failure occurs. The moment the audible or visual device on the vacuum lifter indicates an abnormal vacuum drop, the nature of the manoeuvre changes: it is no longer about trying to adjust the glazing into the rebates of the steel framework, but about immediately securing the load and personnel.
- Triggering of critical signalThe pressure gauge drops below the permissible operating threshold or the buzzer sounds. The banksman orders an immediate halt to the approach towards the metal framework.
- Evacuation of the slewing zoneIn accordance with art. 17 OTConst, measures must be taken at workstations and passageways so that workers are not endangered by falling materials. All erectors clear the ground footprint and balconies located beneath the slewing envelope.
- Emergency set-downThe crane operator places the glazing onto softwood timbers or unload trestles previously arranged away from circulation paths, without attempting to align it perfectly.
- Technical diagnosis off-loadThe team inspects the condition of the elastomer lips, checks for moisture or grinding dust on the suction pads, and checks the tightness of both independent vacuum circuits before resuming work.
If the wind picks up suddenly and exceeds the limit set in the lifter manual, or if a gust causes the glazing to twist despite the tag lines, the site manager halts lifting. In accordance with art. 82 LAA, to prevent accidents, the employer takes all measures shown by experience to be necessary, applicable according to the state of the art, and suited to the given conditions. The load must be lowered and lashed onto its storage stillage until aerodynamic conditions allow a millimetre-accurate approach without risk of impact against the metal mullions.
Frequently asked questions
What should be done if the lifter's audible alarm sounds while the glazing is positioned halfway up the facade?
The banksman halts insertion. The crane operator locks the jib. The vacuum reserve provides several minutes of autonomy: if the glazing is already entered into the plane of the metal mullions, the team immediately pushes it against the framework's setting blocks and tightens the temporary pressure plates. If it is suspended in mid-air, the crane operator initiates an emergency vertical descent towards the secured ground, avoiding abrupt trolley movements.
Can a single-circuit lifter be used to install triple glazing on a Swiss construction site?
No. SUVA directives and recognised technical rules require the use of a vacuum lifter equipped with two entirely independent vacuum circuits for building construction site work. Each circuit must feature its own non-return valve, buffer reserve tank, and acoustic and visual alarm system, ensuring the load remains supported in the event of failure of the other.
How is the exclusion zone beneath the trajectory of heavy glazing accurately sized?
The exclusion perimeter covers the direct vertical projection of the load plus a safety radius calculated according to lifting height and the potential tipping trajectory in the event of failure. This zone is physically demarcated on the ground with rigid barriers or chains accompanied by warning signs. Access to balconies and openings below is cordoned off for the entire duration of craning operations.
Why does the presence of water or dust on the glass defeat the vacuum reserve?
Water and dust prevent the rubber sealing lips from seating hermetically against the smooth glass surface. Micro-interstices create leak paths that the vacuum pump cannot always continuously compensate for. The vacuum reserve empties prematurely, causing the appliance's alarm to trigger immediately and risking sudden detachment of the heavy glazing through total loss of vacuum.
Texts and standards cited
- OTConst art. 17protection against the collapse of structural elements or falling objects and materials: at workstations and passageways, measures must be taken so that workers are not endangered.
- LAA art. 82general prevention rules: to prevent occupational accidents and diseases, the employer takes all measures shown by experience to be necessary, applicable according to the state of the art, and suited to the given conditions; workers assist them (in particular, they use personal protective equipment).