Skip to content
Website
🧱 CFC 215Composite facades: glass, metal and fixingsChapter 4 of 10 in the section

Installing Insulating Glazing: Setting Blocks, Rebate Drainage and Ventilation

After this chapter, the site foreman or site manager will know how to accurately locate setting blocks and perimeter blocks, check the drainage system and ensure continuous rebate ventilation on a mixed façade with a metal structure, thereby guaranteeing the long-term integrity of the insulating glass edge seal.

Key takeaways

  • Imperatively position the setting blocks at a precise distance from the frame corners.
  • Ensure full chemical compatibility between the setting blocks and the secondary sealant.
  • Create unobstructed drainage openings to immediately drain accidental water infiltration.
  • Guarantee continuous rebate ventilation to prevent any destructive standing residual moisture.

Blocking of Insulating Glazing: Load Transfer and Rebate Clearance

In a metal load-bearing framed façade, blocking an insulating glass unit fulfills a dual mechanical and physical mission. It transfers the glass self-weight and climatic loads to the load-bearing profiles while maintaining uniform perimeter clearance. Standard SIA 331 sets out the basic principles for designing and implementing these components on steel or aluminium profiles. If blocking is poorly distributed or crushes the rebate base, point loads break the glass or cause shearing of the perimeter seal.

Setting block
Rot-proof rigid element inserted between the bottom edge of the glazing and the metal profile, designed to transfer the self-weight of the glazing to the structure without blocking drainage.

Setting blocks are placed under the edge of the glass, at a distance from the corners generally between 50 and 100 mm. The standard block length varies from 80 to 100 mm to distribute bearing pressure, with a minimum thickness of 5 mm to raise the glazing above the drainage plane. The recurring error consists in placing the block directly at the base of the channel without a glazing bridge, thus obstructing the passage of water. For fixed elements, two setting blocks are sufficient; adding an intermediate support in the centre creates a flexural breaking line in the glass.

Functions and setting rules of the various blocks according to standard SIA 331
Block typeMain functionLocation on fixed frameRecommended material
Setting blockCarries the glazing self-weightTwo blocks on the bottom transom at 50-100 mm from cornersPolypropylene, hard polyamide or EPDM 80 Shore A
Perimeter blockMaintains the glazing centred in the rebateAt jambs and head, spacing according to formatElastomer or resilient plastic 60 Shore A
Wind-load blockTransfers wind pressure and suctionAt the fixing points of pressure plates and mullionsCompatible bearing strips or stops

Drainage and Ventilation: Neutralising Water to Save the Perimeter Seal

The residual space between the metal transom and the perimeter seal of an insulating glass unit is never water vapour-tight. Driving rain inevitably infiltrates through glazing bead gaskets or internal condensation runs down the profiles. If water ponds in the rebate, it attacks adhesion between the glass and the primary barrier butyl. Seal debonding leads to rapid saturation of the molecular sieve in the spacer, generating irreversible internal fogging.

  1. Machining of drainage slots or holesDrill at least two 8 mm diameter holes or mill 5 × 20 mm slots at the low points of each transom, always located between the setting blocks and not behind them.
  2. Installation of ventilated glazing bridgesPlace grooved block bridges under the setting blocks to allow water to circulate freely beneath the support toward the drainage outlets.
  3. Opening the air ventilation circuitProvide ventilation holes in the upper part of the mullions to create pressure equalisation and continuous air scavenging that dries out residual moisture.
  4. Inspection before clipping the glazing beadsCheck with a mirror or gauge that the drainage holes are not blocked by machining burrs, welding flash or crushed EPDM gaskets.

Geometric Positioning of Blocks and Load Transfer in Metal Façades

Installing insulating glass on a load-bearing metal frame follows a rigorous mechanical logic: carry the self-weight without stressing the edge of the glass and maintain squareness against climatic loads. Standard SIA 331 defines layout rules to prevent the glazing from coming into direct contact with the steel or aluminium of the profile. Any direct point contact under load creates stress concentrations fatal to the glass edges.

Functions and setting rules of blocks according to the metal frame typology
Block typeMain functionRequired positioningTypical material
Setting block (support)Complete transfer of glazing self-weight to the load-bearing structure100 mm from the lower corners, on rigid horizontal transomsPolypropylene or hard polyamide (Shore A 80-90)
Perimeter block (lateral)Maintains squareness and transfers wind loads or movementsLateral, opposite pivot points or at mid-heightSemi-rigid elastomer (Shore A 60-70)
Sash blocking wedgeTransfer of diagonal loads on integrated opening framesAt corners diagonally opposite the hingesRigid moisture-resistant plastic

Setting blocks must imperatively rest on block supports suitable for the metal load-bearing profile. If the block is placed directly at the rebate base without a rigid bridge, it risks slipping or tilting when the façade pressure plates are tightened. The width of the block must exceed the total thickness of the insulating glazing (inner glass, cavity spacer and outer glass combined) by at least 2 mm, so that all glass panes rest flat on the block without overhang.

Implementation of Rebate Drainage and Ventilation in Curtain Walls

Infiltrating water and condensation water inevitably penetrate the rebate around external gaskets. The ultimate objective of standard SIA 331 is to prevent the perimeter seal of the insulating glazing from being prolonged immersed in water. To keep the spacer dry, the rebate base must fulfill a dual function: discharge water to the exterior and guarantee sufficient air circulation to dry out residual moisture.

  1. Drilling or machining the drainage outletsDrill slots of at least 8 mm diameter or slotted holes of minimum dimensions 5 × 20 mm at the low point of each module. In mullion-transom façades, provide at least two drainage openings per glazed bay, distributed near the ends to drain the collection zones.
  2. Installation of drainage bridges and distributorsInterlock the sealing pieces under the pressure plates to ensure continuity of drainage between the transom and the perforated cover cap. Check that the EPDM sealing flaps do not buckle during tightening.
  3. Inspection of upper and lower ventilationEnsure rebate ventilation by creating natural pressure equalisation: ventilation holes at the top of the glazing supplement the bottom drainage system to generate a continuous vertical airflow along the glass edge.
  4. Verification of perimeter gasketsInsert EPDM or silicone gaskets compatible with the secondary edge sealant of the insulating glazing (polyurethane, polysulphide or silicone). Chemical incompatibility destroys the vapour barrier of the glazing within a few months.

Interface assessment is the responsibility of the metal fabricator during assembly on the construction site. Pursuant to art. 365 CO, the contractor is liable for the sound quality of the material he provides; if the material supplied by the client or the ground designated by him is found to be defective, or if another circumstance jeopardises the proper or punctual execution of the work, he must inform the client immediately, on pain of bearing the consequences (para. 3). This principle applies directly when receiving insulating glass units delivered with damaged edge seals or profiles machined out of tolerances.

Management of Drainage Non-Conformities and Remediation of Defective Blocking

On a mullion-transom metal façade construction site, defective water drainage or faulty blocking directly compromises the watertightness warranty of the insulating glazing. When the perimeter edge sealant (polyurethane, polysulphide or silicone) is immersed in condensation or infiltrating water, hydrolysis of the watertight seal destroys the desiccant within a few seasons, causing irreversible internal fogging. As soon as standing water is detected at the rebate base during progress inspections, the site manager must order an immediate halt to cover cap installations in the affected zone.

  1. Diagnostic of openings and the rebateRemove the cover caps and dismantle the affected pressure plates. Measure the drainage slots in the bottom transom: check the effective cross-section of at least 5 mm in height or 8 mm in diameter, as well as clear discharge free of machining burrs. Check that pressure-equalisation outlets are completely unobstructed.
  2. Rectification of blocking and clearing the rebate baseCheck the position of the glazing setting blocks. According to standard SIA 331, they must transfer the self-weight of the glass without obstructing lateral flow toward the outlets. Replace improvised continuous blocks with grooved blocks or glazing bridges that elevate the glass by at least 5 mm above the base of the profile.
  3. Remediation of the transom-mullion interface sealingInject a bead of sealant compatible with butyl under the transom end pieces and check the presence of the EPDM continuity membrane. Restore upper edge ventilation paths to maintain air pressure equilibrium according to the pressure-equalisation chamber principle.

If the primary supporting structure exhibits excessive deflection creating a reverse slope on the transom, residual water converges toward the centre of the glazing instead of being directed toward the mullions. In the event of a defect attributable to the structure or a third-party trade package, the contractor refers to the requirements of the duty to notify addressed in CFC 201 to record formal reservations.

Frequently asked questions

How do you clean an obstructed drainage opening after the glazing has been installed?

Remove the pressure plate profile and the finishing cover cap of the bottom transom. Clean the opening using a semi-rigid plastic rod to remove machining debris or sealant surplus. The use of a metal drill bit on a power drill is prohibited without a depth stop, as the risk of hitting the clean edge of the insulating glass and causing thermal or mechanical breakage is critical.

What is the minimum distance between the glass corner and the setting block?

According to good trade practice and the requirements of standard SIA 331, glazing setting blocks must be positioned at a distance from the corner between 50 mm and the actual length of the block (commonly 100 mm). Placing a block directly in the corner transfers clamping stresses onto the fragile edges of the glass and increases the risk of spontaneous breakage.

Why is upper rebate ventilation inseparable from bottom drainage?

Gravity water drainage only works if internal rebate pressure equalises with external dynamic pressure. Ventilation openings provided at the top or on the mullions allow the air circulation necessary to neutralise local negative pressure. Without ventilation, water remains trapped by capillarity and suction effects, accelerating the deterioration of the glazing secondary seal.

Can continuous gaskets be used without cut-outs at the blocks?

No. The lips of internal and external EPDM gaskets must be interrupted or cleanly notched at the drainage bridges to prevent any water retention at the rebate base. If the gasket forms a continuous barrier in front of the glazing block, water infiltrating from driving rain bypasses the setting block around the sides and saturates the glass cavity space instead of discharging to the exterior.

Texts and standards cited

  • SIA 331Windows and French doors: requirements for design, glazing blocking, sealing, rebate drainage and ventilation.

In the same section