Key takeaways
- Tighter spacing compensates for the cold-wall effect in front of large glazed openings.
- The SIA 384/1 standard governs the permissible surface temperatures according to the use of the zones.
- A loop must not exceed 100 to 120 metres, otherwise hydraulic throttling occurs.
- Careful balancing on the flow meters ensures correct heat distribution in every room of the building.
Tighten the spacing in the edge zone to neutralise heat loss through the façade
The classic mistake on new-build or heavy-renovation construction sites is to unroll the pipes at uniform spacing over the whole of a living room or living space. While this method speeds up installation on the mesh or studded panels, it produces marked thermal discomfort next to sliding glazed doors. Large glazed walls, even when fitted with high-performance triple glazing, have a higher heat transmission coefficient than insulated external walls. The air cooled on contact with the glass slides down to the floor by natural convection and creates an unpleasant sensation of cold draught at the ankles, while the slab absorbs the body radiation of the occupants.
- Edge zone
- Strip of floor between 0.50 m and 1.00 m wide along an external wall or glazed opening, where the pipe spacing is tightened to raise the local surface heat output.
To counter this phenomenon, the heating installer must create a specific perimeter zone as soon as the floor insulation is laid and the pipe runs are marked out. In this strip of one metre at most, the spacing between pipes is halved compared with the normal living zone. If the nominal spacing in the interior is set at 150 mm or 200 mm according to the thermal design calculation, the coil must be tightened to 75 mm or 100 mm in front of the glazed opening. The hot pipe leaving the manifold feeds this critical strip first before snaking towards the centre of the room, guaranteeing a direct heat supply where the heat loss flow is greatest.
| Layout zone | Usual spacing | Max. surface temperature | Target thermal profile |
|---|---|---|---|
| Living room, bedrooms (normal zone) | 150 to 200 mm | 29 °C | Regular barefoot comfort |
| Glazed edge zone (0.5 to 1 m) | 75 to 100 mm | 35 °C | Barrier against downward convection |
| Bathrooms (small surface area) | 100 mm | 33 °C | Compensation for high heat demand per volume |
| Supply corridors (grouped pipes) | Variable (sleeves) | 29 °C | Neutralisation of parasitic overheating |
Marking out the tighter spacing requires sustained attention when bending synthetic pipes, whether cross-linked polyethylene or polybutylene with an outside diameter of 16 mm or 17 mm. An excessive bending radius risks causing the start of a kink or an irreparable pinching of the pipe wall, drastically reducing the water passage cross-section. Using reinforced clips or notched profiled rails clipped firmly onto the insulation guarantees precise holding of the spacing without mechanically stressing the material.
Controlling loop length and ensuring hydraulic balancing at the manifold
Each underfloor heating loop is a closed circuit with a hydraulic resistance proportional to its pipe length, its changes of direction and the viscosity of the heating water. When the designer or installer tries to cover a large area in one piece by lengthening the loop excessively, the total pressure loss exceeds the pressure available from the circulation pump. The water then chooses the shortest circuits, leaving the oversized loop under-supplied, lukewarm or completely inactive, whatever the demand from the room thermostat.
In site practice, a mandatory ceiling of 100 to 120 linear metres is set for pipe with an inside diameter of 12 mm or 13 mm. As soon as a room exceeds 15 to 20 square metres or includes a tightened perimeter zone that uses a lot of linear pipe, it is mandatory to divide the area into two or three independent loops. These loops must have lengths that are as uniform as possible. If one room has a circuit of 95 metres and a neighbouring office a circuit of 30 metres, the difference in hydraulic resistance becomes difficult to compensate with the mechanical adjustment devices.
- Recording the actual lengthsWrite the exact length laid on each flow and return at the manifold with an indelible marker, reading the metre marking printed on the outer sheath of the pipe.
- Air purging and flushing loop by loopFlush each loop individually with clean water at constant pressure to drive out all air pockets before opening the manifold fully.
- Fine presetting of the flow metersAdjust the setting ring or graduated plunger on the distribution manifold, setting the target flow rate in litres per minute calculated by the thermal design.
- Checking temperature differences in operationCheck with a contact thermometer the temperature drop between flow and return of each circuit, aiming for a typical difference of 5 K to 7 K.
Final hydraulic balancing is the professional signature of the CFC 241 heating installer. Without precise calibration of the float flow meters to the values given by the heating engineer, the heat pump will operate with a set point that is too high in order to artificially compensate for the disadvantaged loops. A network that is properly sized for spacing, balanced for length and regulated on each circuit can operate with a very low flow temperature, directly maximising the seasonal performance coefficient of the generating plant.
Layout calculation and spacing geometry according to SIA 384/1
The SIA 384/1 standard sets the thermal rules for sizing heating installations in buildings. Strict application of this reference means adapting the pipe spacing to the actual heat load of each square metre of floor. Laying a network with uniform spacing of fifteen or twenty centimetres over a whole storey systematically leads to thermal problems: overheating of interior zones with low heat loss and a shortfall in output along the external window and door frames.
- Pipe spacing (or centre distance)
- Axial distance between two consecutive pipes of the same floor emitter loop, measured in millimetres or centimetres. It determines the surface heat emission density and the uniformity of the floor temperature.
To respect the physiological limits of walking barefoot or in shoes, the surface temperature of the finished floor must not exceed twenty-nine degrees Celsius in living and working rooms. In a marginal or edge zone not intended for prolonged standing by occupants, the standard allows a rise up to thirty-five degrees Celsius. This technical tolerance allows a drastic tightening of the spacing over a defined width, creating an immediate thermal shield against cold radiation and downward convection from glazing.
| Layout zone | Usual pipe spacing | Target surface temperature | Preferred layout pattern |
|---|---|---|---|
| Edge of glazed opening (width 0.5 to 1.0 m) | 75 to 100 mm | 31 to 33 °C | Tight spiral or priority flow in serpentine |
| Blank north-facing façade | 100 to 150 mm | 27 to 28 °C | Parallel serpentine or standard spiral |
| Living area or offices (centre of room) | 150 to 200 mm | 24 to 26 °C | Snail (spiral) with constant spacing |
| Sanitary rooms and bathrooms | 100 mm | 28 to 29 °C | Dense spiral over the whole free surface |
Marking out the coil must always start with the supply of the hottest water against the glazed opening. In snail-type winding, the installer unrolls the flow pipe as close as possible to the glazed frame with a spacing of seventy-five or one hundred millimetres over four to six turns. Only once this perimeter strip is saturated does he widen the centre distance to one hundred and fifty or two hundred millimetres to cover the rest of the room. This method ensures that the fluid temperature drop occurs where the demand for output is greatest.
Pressure losses, length thresholds and balancing at the manifold
Thermal stratification and comfort in the rooms depend directly on controlling the pressure losses of the hydraulic circuit. A pipe that is too long accumulates excessive linear friction, limiting the volume flow and creating an excessive temperature difference between flow and return. Conversely, a loop that is too short has a very low hydraulic resistance, taking all the flow to the detriment of distant zones if it is not severely throttled.
- Checking actual lengths against the designRead the metre marking printed on the pipe sheath at the inlet and outlet of the manifold for each flow. Immediately record the actual length unrolled on the site self-inspection sheet. If a room requires more than one hundred metres of pipe because of tight spacing, split the area into two loops of equal length rather than laying an oversized coil.
- Calculating the target flow rate per loopDetermine the mass flow required for each circuit by applying the formula linking the room's heat output, the thermal capacity of water and the planned temperature regime (generally a flow-return difference of five kelvins for a heat pump). Transfer these target values in litres per minute onto the identification plan of the distribution cabinet.
- Dynamic presetting on the manifold flow metersAdjust the float flow meters fitted on the flow manifold or the fine-adjustment valves on the return. Screw in the adjustment spindle to throttle very short circuits (corridors, small bathrooms) to avoid hydraulic short-circuiting, then gradually open the long loops of the edge zone until the theoretical value is reached.
- Checking under pressure and thermal balancingBring the installation up to working pressure to ensure there is no residual air that distorts the float readings. During the later hot circulation phase, measure the flow and return manifolds with an infrared thermometer to confirm that each loop shows cooling in line with the heat balance forecasts.
In the event of a defect in execution or the absence of a rigorous layout plan, the contractor is exposed to the sanctions provided for by the Code of Obligations (CO). Art. 368 CO provides that where the work is so defective that it does not meet the terms of the agreement, the client may exercise his contractual rights, in particular rectification of the work or a reduction of the price. A visible temperature disparity on the floor or a hydraulically saturated circuit constitutes a clear defect in the work attributable to the laying technique.
Handling layout deviations and corrections before pouring
On the construction site, coil layout anomalies most often show up as two critical errors: forgetting the tighter spacing in the edge zone in front of tall glazing, and unexpectedly exceeding the linear loop length. If the installer unrolls a constant spacing of 15 or 20 centimetres right up to the foot of a glazed opening without creating the dense perimeter strip required by the thermal design, floor comfort will never be achieved in very cold weather. The cold radiation from the glass will cause a permanent sensation of downward draught at ankle level.
As soon as a layout deviates from the execution drawings complying with the SIA 384/1 standard, the correction must take place before the screed layer intervenes. When a loop exceeds the safety limit set during hydraulic sizing, often 100 to 120 metres for 16 or 17 millimetre pipe, the local and linear pressure loss exceeds the authority of the regulating valve at the manifold. Trying to compensate for this excessive length by opening the flow meter fully unbalances the whole manifold to the detriment of the shorter adjacent loops.
If the manifold no longer has a free outlet to split an excessive length, the site foreman must warn the engineering office before pouring. Under art. 365 CO, if a circumstance jeopardises the proper execution of the work, the contractor informs the client. In practice, the notification is made in writing the same day to have the addition of a secondary manifold or the redistribution of areas validated. Finally, if an edge zone has been omitted along the terrace threshold, unclip the pipes over a depth of one metre to relay them at a tighter spacing of 7.5 or 10 centimetres. This on-site correction avoids an irreparable dispute once the screed has hardened.
Frequently asked questions
How should an edge zone integrated into the living room loop be treated hydraulically?
The edge zone must always be fed first by the flow pipe in order to benefit from the hottest water temperature coming directly from the manifold. The coil first runs along the glazing in four to six very tight there-and-back runs before continuing its route towards the centre of the room with wider spacing. This layout guarantees the required heat output against the cold wall without needing an independent loop.
What is the maximum recommended length for a loop in 16 or 17 mm pipe?
In site practice, each loop is limited to an absolute maximum of 100 to 110 linear metres, including connections to the manifold. Beyond that, hydraulic pressure losses climb steeply, which prevents the circulator from delivering the design flow rate. An excessive length leads to an excessive temperature drop between flow and return and seriously complicates the balancing of the other circuits at the manifold.
Can a 30-metre loop and a 110-metre loop be connected to the same manifold?
This large difference is technically possible but requires severe throttling on the regulating valve or flow meter of the small circuit. To absorb the pressure difference and maintain the prescribed flow without creating hydraulic whistling, the fine-adjustment valve of the short loop must be closed down considerably. Ideally, when laying out according to the SIA 384/1 standard, the lengths of the loops on the same manifold are harmonised with a difference of less than 25 %.
Why avoid uniform spacing in a living room with large south-facing glazing?
Glazing causes higher surface heat losses than an insulated wall, even with modern triple glazing. Laying a regular 15-centimetre spacing everywhere creates a local shortfall in output at the glass and an excess at the heart of the room. Tightening the spacing to 7.5 or 10 centimetres over a depth of one metre compensates for this negative heat flow and removes floor discomfort without overheating the living space.
Texts and standards cited
- norme SIA 384/1Heating installations in buildings - Calculation of the heat load
- CO art. art. 365 COMaterial and ground; notice in the event of a circumstance jeopardising the proper execution of the work
