Skip to content
Website
🧱 CFC 241Heat pump: source, installation and noiseChapter 4 of 10 in the section

Draining condensate: actual volume, pipe freezing and ice sheets

In winter, an air-to-water heat pump produces large quantities of water during defrost phases. This chapter details the practical rules for sizing pipe diameters, ensuring a continuous drainage slope, installing reliable frost protection trace heating and positioning the outlet away from any walkway to prevent ice sheets forming on the ground.

Key takeaways

  • Defrosting an evaporator generates several litres of liquid water, discharged within a few minutes.
  • A minimum internal diameter of 32 millimetres and a continuous slope prevent blockage.
  • The self-regulating heating cable must run down to the frost-free discharge point without a break.
  • The outlet must never discharge onto a pedestrian path or a vehicle access.

Sizing the collector pipe and slope for defrost peaks

On an outdoor air-source heat pump, liquid water production is neither regular nor continuous. During critical periods characterised by humid outdoor air between -2 °C and +5 °C, the evaporator quickly accumulates frost. During the cycle reversal for hot-gas defrosting, the machine releases a large quantity of water in only three to six minutes. The installer must treat this instantaneous flow as an intermittent, high-intensity gravity flow, otherwise the drip tray will overflow through the slots of the casing before the water even reaches the drain pipe.

Sizing the drain pipe does not follow the usual rules for condensate from indoor boilers. Small-diameter flexible corrugated tubes (16 or 20 mm) must be avoided for an outdoor connection: the ambient cold immediately freezes a ring of ice against the inner wall, reducing the flow section until it is completely blocked. The minimum required section for the exposed part is DN 32, and DN 40 or DN 50 is recommended as soon as the run exceeds 1.50 m. The rigid pipe must have a constant downward slope of at least 3 % (i.e. 30 mm per metre of run), straight, with no sharp 90° bend. Changes of direction are made with two 45° bends to prevent any hydraulic slowdown.

Choice of pipe sizes and slopes for outdoor condensate drainage
Length of outdoor runMinimum nominal diameterRecommended minimum slopeLayout of the run
Less than 1.00 mDN 3230 mm / m (3 %)Direct vertical drop into the outlet
Between 1.00 m and 3.00 mDN 4030 to 50 mm / mEven slope, 45° bends only
More than 3.00 mDN 5050 mm / m (5 %)Reinforced thermal insulation and continuous trace heating

The connection below the machine's tray outlet must be completely watertight and mechanically protected. A trap installed in the open air always freezes; the water seal must either be inside the heated volume of the building, or be omitted in favour of an air gap with an open discharge above an infiltration point.

Protecting the pipe against frost and locating the outlet away from walkways

Elastomer foam insulation alone does not protect a pipe holding stagnant condensate when the air temperature falls below 0 °C. A self-regulating heating cable with a linear output of 15 to 25 W/m is essential. The cable must be laid along the underside of the pipe or threaded inside a watertight sleeve provided for this purpose, fixed with aluminium adhesive tape to spread the heat. It must run up into the drain spout of the machine's tray and go down beyond the frost line in the ground or into the receiving manhole. The cable is controlled either by an outdoor temperature sensor cutting the power above +3 °C, or by the heat pump's control board.

The discharge point of the condensed water determines the safety of people moving around the building. Letting condensate run freely over a concrete slab, asphalt or permeable paving right next to the heat pump creates an invisible ice zone as soon as the bise wind rises. Discharges must absolutely be directed to an infiltration pit made of a bed of frost-resistant 16/32 gravel, a drainage trench or a buried pipe connected in accordance with cantonal drainage directives.

For installations on a masonry plinth, the outlet must run down inside a tubular duct formed in the concrete, ending in a drained infiltration pit protected from surface ingress. Where the unit is mounted on wall brackets, the run down the façade requires fixing clamps with an insulating lining to decouple the pipe acoustically from the masonry, while preserving the clearance needed for the pipe's thermal expansion.

Installing the heating tape and insulation under the outdoor unit

During cycle-reversal defrosting, the evaporator of an air-to-water heat pump releases very cold meltwater, close to 0 °C, at an instantaneous flow that can reach several litres per minute. When the outdoor air is below freezing, this film of water loses its last heat as soon as it touches the sheet metal of the receiving tray or the inner wall of the drain pipe. Without active heat input, a sleeve of ice builds up in successive layers at the bottom of the profile, blocks the drain opening and causes the water to overflow onto the concrete plinth.

To prevent this freezing solid, the heating fitter lays a self-regulating heating cable along the drain run. The conductive core of this tape adapts its heat output to the local temperature of the pipe, which limits electricity consumption once natural thawing begins. The cable is laid along the underside of the drain pipe, held every 20 to 30 centimetres with pure aluminium adhesive tape. This metal tape has a dual function: it secures the conductor without crushing it mechanically and spreads the thermal energy around the circumference of the pipe before it passes through the plastic wall.

The trace heating does not stop flush with the threaded sleeve: the cable must absolutely enter the machine's condensate tray to form a loop around the drain outlet, then run down inside the pipe to the frost-free point in the ground or the boiler room. An insulating sheath of extruded closed-cell elastomer, vapour-tight and protected from ultraviolet rays by a sheet-metal casing or a resistant spiral sheath, covers the whole bundle. The heating installer ensures that the cable's power supply, connected to the terminals provided on the heat pump control, is controlled by the outdoor temperature sensor and the controller's defrost signal.

Designing the discharge point and preventing ice in the surroundings

Water from defrosting must never run freely onto a vehicle-accessible surface, a pedestrian access path or a service staircase. Defrost cycles multiply precisely during periods when the ambient air is saturated with humidity and close to freezing, i.e. between -2 °C and +3 °C. At the slightest nocturnal drop in temperature, a few discharges are enough to turn the foot of the slab and adjoining paving into a genuine sheet of ice, creating a major slipping risk for users and maintenance technicians.

Outlet solutions for defrost condensate depending on site configuration
Type of drainageExecution requirementsCritical points to monitor
Soakaway / infiltration bedExcavation backfilled with washed round gravel 16/32, taken below the ground frost level (80 to 120 cm depending on altitude).Saturation of clay soil in rainy periods, clogging by fines in the absence of a separating geotextile.
Connection to combined / rainwater sewerPenetration through the insulated building envelope to an internal downpipe with a disconnecting trap.Watertightness of the wall penetration against pressurised water, siphoning-out by the air depression of the evaporator.
Guided flow over a gravel bedDrainage strip around the perimeter with no pedestrian traffic, bordered by a watertight concrete kerb.Cold air pushed back towards the heat pump casing, mud splashed onto the bodywork.

Where direct infiltration on the plot is authorised by the cantonal environmental services, the gravel bed must be sized to absorb a cumulative volume that can exceed fifty litres per day during prolonged freezing fog. The rigid PE-HD drain pipe, with a minimum internal diameter of 40 millimetres to prevent capillary retention, must go down into the centre of the filter mass and end with a clean bevel cut at 45 degrees to promote rapid dripping without forming icicles.

Where the pipe is brought into the boiler room for connection to the internal drainage system, the tradesperson pays close attention to sealing the core-drilled opening in the façade. The sleeve must include a sealing gasket with compressible elastomer rings to block runoff water ingress and the passage of rodents. Art. 3 OPA requires the employer to take the protective provisions and measures that comply with the recognised rules of technology to prevent accidents. This obligation applies fully on handover of the work: a condensate outlet discharging above a walkway breaches the safety rules on the usability of the surroundings.

  1. Checking the bedding and free slopeCheck with a spirit level that the collector keeps a minimum slope of 2 to 3 % over its entire outdoor run, with no intermediate sagging creating pockets of retained water.
  2. Ohmic check of the heating tapeMeasure the insulation resistance with a megohmmeter at 500 V DC and check the continuity of the self-regulating conductor before the watertight insulating sleeve is finally closed.
  3. Real discharge testPour a 10-litre bucket of lukewarm water into the evaporator tray of the machine at standstill to validate the drain rate and confirm that there is no overflow at all around the casing.

Emergency diagnosis and repair of winter drainage faults

In mid-winter, a faulty condensate drain shows itself abruptly: the outdoor unit goes into safety shutdown through restricted airflow, the fan rubs against a block of ice built up at the bottom of the tray, or the access path becomes a real ice rink. Faced with this winter incident, the service technician must secure the pedestrian routes and defrost the evaporator without damaging the coil's aluminium fins, before undertaking the complete hydraulic and electrical rework of the drainage system.

  1. Securing the surroundings and gentle de-icingSpread grit on the traffic areas made slippery by the overflow of meltwater. Switch off the outdoor unit at the local isolator. To dissolve the mass of ice in the base and free the fan, pour lukewarm water or blow moderate warm air. Hitting the ice with a chisel, screwdriver or hammer is not permitted, as it risks puncturing the refrigerant pipework and causing a refrigerant leak.
  2. Checking the trace heating and the flow profileMeasure the continuity and insulation resistance of the self-regulating heating tape laid along the pipe. Check that the outdoor temperature sensor or the defrost contactor actually powers the cable as soon as the temperature falls below three degrees. Identify sags in the drain pipe creating pockets of stagnant water and check that the internal diameter is nowhere less than forty millimetres.
  3. Mechanical rework and watertight insulationReplace any flexible corrugated hose with a rigid smooth plastic pipe laid with a constant fall of at least two centimetres per metre. Reinstall a heating tape delivering at least twenty watts per linear metre, run to the free end of the pipe. Wrap the whole in an elastomer sleeve at least nineteen millimetres thick, protected from ultraviolet rays and wildlife by a mechanical sheath.

Where the initial discharge was mistakenly directed to a traffic area, the installer must reroute the pipework to a gravel infiltration mass located away from walkways or to an internal wastewater collector fitted with an air admittance valve. Letting defrost effluent run onto a pedestrian path engages liability under art. 229 CP in the event of a fall caused by ice, as soon as a breach of the recognised rules of technology creates a danger to physical integrity.

Frequently asked questions

What volume of condensate does a heat pump produce per defrost cycle in mid-winter?

During cycle-reversal defrosting in damp, cold weather, between zero and four degrees, the evaporator suddenly releases two to five litres of liquid water in less than five minutes. Over a full day with ten to fifteen reversals under freezing fog, the cumulative volume commonly reaches thirty to fifty litres. This peak flow requires a wide pipe and a definite slope to avoid any instantaneous overflow beneath the unit.

Why must flexible corrugated pipes be avoided for outdoor condensate drainage?

Spiral or corrugated sheaths retain water in their undulations and form low points under their own weight as soon as they warm up or fill. In sub-zero temperatures, each trough gradually freezes and starts a complete blockage plug. Always install a rigid, smooth synthetic pipe with a minimum internal diameter of forty millimetres, supported by closely spaced clamps ensuring a continuous downward slope of two per cent with no sagging.

How should the frost protection heating cable on the condensate pipe be controlled effectively?

The self-regulating heating cable must be controlled by a thermostat measuring the outdoor temperature, switched on as soon as the air falls below three degrees, or driven by the defrost signal from the heat pump control with a post-drainage delay. A permanent supply all winter causes unnecessary electricity consumption of several tens of kilowatt-hours. Conversely, manual switch-on is not acceptable because the user invariably forgets to activate it before the first night frost.

What are the compliant solutions for the final outlet if no stormwater sewer is nearby?

The standard solution is to dig a gravel infiltration pit directly beneath or immediately next to the unit. This excavation of about one cubic metre is filled with washed rounded gravel of sixteen to thirty-two millimetres, going below the local frost depth, generally between eighty and one hundred centimetres. The end of the condensate pipe enters it vertically to discharge the water into the heart of the drainage mass, preventing any resurgence at the surface towards neighbouring walkways.

Texts and standards cited

  • CP art. 229breach of the recognised rules of the art of construction: anyone who, when directing or carrying out a construction or demolition, intentionally breaches the rules of the art and knowingly endangers the life or physical integrity of persons is liable to a custodial sentence of up to five years or a monetary penalty; through negligence, up to three years or a monetary penalty

In the same section