Key takeaways
- Isolate each loop at the manifold to identify the faulty circuit by the pressure drop on the pressure gauge.
- Let the screed cool down completely before injecting lukewarm water to make the leak stand out on the thermal camera.
- Draw up a signed joint inspection record before any mechanical probing, in order to establish responsibilities.
- Open up a single tile with a light chisel hammer and connect the pipe with a crimped coupling protected by a sleeve.
Isolating the faulty loop and locating the leak point by thermal imaging
A recurring pressure drop on the boiler room pressure gauge never justifies immediate destructive probing. Before any work on the screed, the heating installer must proceed by methodical elimination starting from the distribution manifold. The first task is to isolate the underfloor heating from the heat generators, the expansion vessel and the auxiliary circuits. Each loop is then closed individually at the flow valves and at the micro-actuators or lockshield valves on the return.
The tightness test is carried out circuit by circuit using a manual test pump fitted with a calibrated glycerine-filled pressure gauge. The network is filled with water to a stabilised test pressure. A tight loop holds its pressure, apart from the thermal variations of the test fluid, whereas a punctured loop shows a continuous, clear pressure drop from the first few minutes. This measurement narrows the damage down to a defined thermal zone, reducing the investigation area from an entire storey to a few square metres of floor.
- Complete shutdown and cooling of the zoneStop circulation in the loop concerned for twelve to twenty-four hours. The floor must return to a perfectly uniform ambient temperature with no residual gradient in the screed.
- Impulse heatingInject into the suspect coil water heated to between 35 °C and 40 °C at a pressure of 2 to 3 bar, keeping the other circuits closed to avoid thermal interference.
- Continuous scanning with the thermal cameraFollow the progress of the hot front along the pipe. At the point of the puncture, water escapes into the surrounding screed, producing a diffuse, mushroom-shaped thermal patch that is clearly distinguishable from the regular, straight lines of the sound coils.
Record the defect, open up with a light chisel hammer and fit a sleeve to the pipe
As soon as the centre of the thermal patch has been located and marked on the floor with a grease pencil, no demolition may begin without formal documentation. Mechanical failure of an embedded pipe often results from a later puncture by a third party (door stop, partition fixing, anchor plug) or from crushing during the pour. Art. 364 CO governs the contractor's liability for the execution of the work. The installer calls in site management and the client to draw up a written joint inspection record, supported by the infrared images and the pressure reading.
| Pipe material | Cutting / stripping tool | Fitting type permitted in screed | Corrosion protection required |
|---|---|---|---|
| PE-X (cross-linked polyethylene) | Electrician's pipe-cutting pliers / plastic pipe cutter | Sliding-sleeve or axial crimp fitting | Fully sealed heat-shrink sleeve |
| Multilayer (PE-RT/Al/PE-RT) | Rotary pipe cutter + calibrating/deburring tool | Radial crimp fitting with checked EPDM seal | Self-vulcanising grease tape and insulating sleeve |
| Polybutylene (older installations) | Plastic pipe cutter for a clean square cut | Dedicated mechanical fitting from the original manufacturer | Split plastic sleeve sealed at both ends |
The opening must remain surgical. The joints of the selected tile are first cut out with an angle grinder fitted with a diamond blade and integrated dust extraction, so that no vibration is transmitted to the surrounding tiles. The tile is then broken out with a light hammer drill set to hammer-only mode without heavy impact, or by hand with a flat chisel and a club hammer. As soon as the metal mesh or the top of the coil appears, mechanical chiselling is stopped immediately and the pipe is freed using a fine hand point chisel.
The pipe is freed from its screed coating over a length of at least fifteen centimetres on either side of the puncture, to give the flexibility needed for fitting. The damaged section is cut out cleanly. The inside of the pipe is calibrated before a straight repair coupling in stamped brass or in PPSU certified for embedding is inserted. Crimping is carried out with an electro-hydraulic crimping tool using the jaws that strictly match the fitting profile.
Pressure drop measurement and fine thermal discrimination
Identifying a loss of tightness on an embedded network tolerates no approximation beneath a sealed finish. When the general pressure gauge of an installation drops with no visible trace in the boiler room or service duct, the investigation starts at the distribution manifold. Each underfloor heating loop is isolated individually by its fine-adjustment flow valves and its return lockshield valves. The heating is switched off completely to stabilise the thermal mass of the slab. The hydraulic test is then carried out circuit by circuit using a test pump fitted with a calibrated class 1.0 pressure gauge, which makes it possible to record the pressure drop on a closed loop without interference from the rest of the building.
As soon as a coil shows a clear, continuous pressure drop, locating the leak in space requires a controlled injection of lukewarm water. The injected water must not exceed a difference of ten to fifteen degrees from the room's ambient temperature, to avoid early lateral diffusion within the thickness of the screed. The thermal camera is set to a thermal sensitivity below fifty millikelvins. Scanning of the floor begins as soon as forced circulation starts. Whereas the normal pipe layout draws a continuous line with sharp edges, the leak opening produces a diffuse, dome-shaped thermal patch in which the thermal gradient spreads abnormally between two pipe spacings.
| Operating step | Physical quantity checked | Measuring equipment | Technical decision criterion |
|---|---|---|---|
| Isolation at the manifold | Static pressure (bar) | Test pump with class 1.0 pressure gauge | Continuous pressure drop on a single isolated circuit |
| Slab cooling | Surface temperature (°C) | Surface contact thermometer | Uniformity of the tiled substrate before injection |
| Lukewarm water injection | Loop flow temperature (°C) | Controller or mobile test unit | Flow temperature set to 30 °C to 35 °C maximum |
| Infrared scanning | Emissivity and contrast (mK) | Calibrated thermal camera | Appearance of a diffuse hot spot away from the linear pipe layout |
Joint inspection record and surgical sleeving of the pipe
Cutting into a finished floor under warranty or during an operating dispute directly engages the liability of those involved. Before using any demolition tool on a tiled screed of sixty square metres, the heating technician calls in the client, site management and, where possible, the tiler for a joint inspection record on site. The loop layout, the identified thermal leak zone and the pressure drop measurement are recorded in minutes signed by all parties. This document fixes the intervention zone to one precise tile, avoiding later disputes about the extent of the damage caused to the finish.
- Cutting out the joints and removing the target tileCompletely cut out the grout joints of the marked tile using a diamond oscillating tool or a grooving machine with extraction at source. The tile is split in the centre and then broken inwards without striking the adjacent edges.
- Careful removal of the surrounding screedCarefully excavate the screed around the punctured pipe using a hand chisel and a blunted point chisel. The coating must be cleared for fifteen centimetres on either side of the damage to free up the flexibility needed for crimping.
- Cutting out the damaged sectionMake a square cut of the pipe with a guillotine pipe cutter suited to the outside diameter, remove the burr, then carefully calibrate and deburr the inner bore of the multilayer or cross-linked polyethylene pipe.
- Fitting the permanent mechanical couplingInsert a straight repair coupling in dezincification-resistant brass or in a synthetic material certified for embedding. Crimping is carried out with an axial ring or a dedicated radial jaw, ensuring a lasting and permanent mechanical joint.
- Tightness check at test pressureBring the loop back to a test pressure of six bar for the prescribed time to check that there is no seepage at all on the coupling before the file is passed on to the quantity surveyor or the screed layer.
Once hydraulic tightness has been confirmed under continuous pressure, the repair coupling must be wrapped in a closed protective sleeve or an adhesive tape resistant to the alkaline attack of cement. Direct metal ties on the metal of the fitting are prohibited. The underfloor heating remains under constant pressure-gauge monitoring while the tiler or screed layer carries out the final sealing. Recording the exact position of the coupling on the as-built drawing completes the technical operation.
Handling disagreements and complex damage during the intervention
When a locating and repair intervention on a coil turns into a dispute, the deadlock most often arises from a refusal of a joint inspection record by the person presumed responsible for the damage, or from the discovery of unforeseen structural deterioration of the circuit. If the partition fitter or the joiner disputes the origin of a puncture caused by an anchor plug, all destructive handling must stop before the pipe is freed. Leaving the piercing element in its original anchorage is the essential material evidence for site management and the insurance experts. Under art. 367 CO, each party may request an examination by experts. The installer formally records the position, photographs the precise dimensions relative to fixed walls and has the joint inspection record countersigned by site management in accordance with the rules of standard SIA 118.
Faced with an unforeseen technical complication on the embedded network, three concrete situations require a change of method:
- Failure to hold pressure after crimping: if the pressure gauge records a drop during the six-bar test, the circuit must be isolated again to distinguish a defect in the crimp ring from a second, hidden leak on the coil.
- Structural deterioration of the synthetic material: finding a pipe that has become brittle through prolonged overheating or chemical degradation rules out local sleeving. The entire loop must then be replaced to avoid repeated failures later.
- Refusal by the client to allow opening: faced with a formal objection to cutting into the tiling for aesthetic reasons, the heating installer records the obstacle in a written notice, completely drains the damaged loop and shuts it off at the distribution manifold to prevent any further water damage.
The heating installer's responsibility is limited to their own hydraulic work. The tradesperson guarantees the mechanical tightness of the axial or radial fitting and delivers the hydrostatic test record under sustained pressure. Repair of the screed body, reinstatement of the vapour barrier film, continuity of the thermal insulation and relaying of the tiles fall exclusively to the finishing work trades concerned. Final embedding of the fitting must not begin before the technical drying of the damaged zone, the fitting of a protective sleeve that avoids direct contact with the binder, and formal confirmation that pressure is held.
Frequently asked questions
Can a crimp fitting be embedded directly in the filling mortar?
No, a metal or plastic fitting must never come into direct contact with a cement screed or an anhydrite screed. The alkalinity of the mortar and thermal expansion movements risk damaging the mechanical joint. The coupling must be sheathed in a split corrugated protection or wrapped in a sealed, closed elastomer tape. This decoupling preserves the axial play of the pipe and shields the crimp from residual aggressive moisture.
How do you tell a leak from a simple purge imbalance when the pressure drops?
An imbalance caused by trapped air generally stabilises after venting and readjusting the cold water pressure. Conversely, an active leak causes a continuous, repeatable pressure-gauge drop, even with the circulator stopped. When the suspect loop is isolated at the manifold, the drop stops on the rest of the installation. An individual test under air or water pressure at six bar confirms beyond doubt the pressure loss of the closed loop.
What fluid temperature should be injected to locate the leak with the thermal camera?
The ideal temperature difference between the cold screed and the injected fluid is between fifteen and twenty degrees. A flow water temperature of about forty degrees is enough to show the thermal wave of the coil without saturating the infrared image. If the floor is already warm, heating must be switched off for several hours before injection. Too strong a gradient produces a diffuse thermal patch that hides the exact point where the water emerges.
Is it permitted to install a demountable threaded fitting under a screed?
No, demountable mechanical connections, threaded or with a conical compression ring, are prohibited under screed without a permanent access hatch. Only certified permanent fittings, such as axial or radial crimp couplings and electrofusion joints for PE-X or multilayer, are permitted in embedded sections. Every concealed fitting must be unaffected by traffic vibration and provide lasting tightness guaranteed at the design pressure of the installation.
Texts and standards cited
- SIA 118General conditions for the execution of construction work
- CO art. 367Inspection of the work and notice of defects; examination by experts
