Key takeaways
- Cylinders travel upright and strapped to metal rails, never lying on the loading floor.
- Permanent ventilation of the vehicle prevents any build-up of toxic or explosive gas during journeys.
- Storage on the construction site requires a ventilated area, not in a basement, with fixing by anti-fall chains.
- Non-return valves and flame arrestors must always protect regulators and hoses against deflagrations.
Securing and transport: eliminating the risk of explosion in the utility vehicle
A steel cylinder containing high-pressure oxygen or acetylene dissolved in acetone tolerates no improvisation. In a heating installer's van, placing a cylinder on the floor without restraint turns every emergency braking into an artillery shot. If the valve hits a bodywork pillar and breaks on impact, the energy released propels the cylinder through the sheet metal. For acetylene, the lying position causes liquid solvent to leak into the valve: the gas loses its chemical stability and becomes highly detonating on expansion.
According to art. 3 OPA, the employer takes the protective provisions and measures that meet the requirements of the ordinance, the other applicable occupational safety provisions and the recognised rules of safety technology and occupational medicine. For the transport of compressed gases, this requires fixed equipment in vehicles. Cylinders must travel in an upright position, firmly held against a bulkhead or a metal rack by ratchet textile straps with a minimum capacity of 500 daN. Elastic bungee cords are prohibited because they give way under the dynamic load of a frontal impact.
- Protective cap screwed on or metal guard locked on the neck to protect the valve.
- Valves closed and leak-tight, depressurised upstream and drain points emptied before loading.
- Regulators removed and stored separately in padded boxes to avoid impacts.
- Physical separation between oxidising oxygen cylinders and fuel gas cylinders.
Ventilation of the utility vehicle is the second line of defence. Any cargo space carrying technical gases must have a low ventilation grille at floor level and a static or dynamic extractor in the roof. This continuous air circulation prevents the loading space from becoming saturated in the event of a micro-leak on a valve seal. A free ventilation area of at least 100 cm² at both the low and high points meets the rules of the trade to ensure constant air flushing, whether the van is moving or parked in the sun.
Storage on the construction site and mandatory non-return accessories
Once on the work site, acetylene, propane and oxygen cylinders must never remain in circulation routes or site accommodation. Storage takes place in a reserved location, sheltered from the weather, direct sunlight and sources of sparks. Gases heavier than air, such as propane or acetylene vapours, make any basement storage dangerous: in the event of a leak, they accumulate at floor level, displace breathable oxygen and form an explosive pocket that cannot be detected without a specific odorant.
- Reception and visual inspectionCheck that the cylinder shoulders show no impact damage and make sure the hazard labels remain perfectly legible before unloading anything on site.
- Siting of the storage areaPlace the cylinders on the ground floor or in the open air, on level, stable ground and away from any basement ventilation grille.
- Mechanical lockingSecure the cylinders upright against a rigid structure using a chain or a non-deformable fitting, for each group of compatible gases.
- Setting up the workstationsConnect the flexible hoses only after the cylinders have been finally secured on the welding handling trolley.
At the workstation, the major risk remains flashback or flow reversal. If the torch nozzle becomes blocked during a brazing operation on heating pipework, pressurised oxygen flows back into the fuel hose. Without a shut-off device, the flame travels back up the hose at supersonic speed and causes the regulator or the cylinder to explode.
| Device | Technical function | Required location |
|---|---|---|
| Gas non-return valve (NV) | Prevents flow reversal and mixing of gases | Torch handle inlet |
| Sintered metal flame arrestor (FA) | Extinguishes the flame front by thermal cooling | Regulator outlet or hose |
| Thermal cut-off (TV) | Blocks the gas supply if the internal temperature rises | Safety body on regulator |
| Pressure-sensitive cut-off (PV) | Shuts off the gas flow during a pressure surge | Direct regulator outlet |
The installer checks the condition of these accessories before each ignition. A certified foaming leak-detection product validates the tightness of threaded connections, while using a naked flame to trace a smell of gas is a serious fault. The markings engraved on the metal bodies of the valves must also be checked, and periodic replacement is required to avoid mechanical seizing of the internal springs.
Ventilation of work areas and operational management of thermal incidents
Working in a boiler room or technical basement exposes the installer to specific risks linked to the density of brazing gases. Acetylene is slightly lighter than air, whereas propane and oxygen are heavier. Without constant air flushing, a minor leak on a fitting forms a stagnant pocket at floor-slab level or at the ceiling. Cross natural ventilation or temporary mechanical extraction must ensure continuous renewal of the room's air volume. Any storage of liquefied or compressed gas in cellars, basement light wells or pits not ventilated by gravity is prohibited.
In accordance with art. 3 OPA, the employer takes the protective provisions and measures that meet the requirements of the ordinance, the other applicable occupational safety provisions and the recognised rules of safety technology and occupational medicine.
- Leak test on assemblyApply a specific certified grease-free foaming product to the threaded connections, hose fittings and regulator pressure gauges. Greases are prohibited on oxygen circuits in order to avoid spontaneous ignition.
- Preliminary purging of the hosesBriefly open each cylinder valve before connecting in order to blow dust out of the threads, then purge each line separately in the open air before lighting the torch.
- Closing and depressurising at the end of the shiftClose the cylinder valves, open the torch valves to purge the hoses until the pressure gauge needles fall back to zero, then loosen the regulators' adjusting screw before putting the equipment away.
Flame arrestor devices and maintenance of non-return safety devices
According to art. 82 LAA, to prevent occupational accidents and diseases, the employer takes all the measures that experience has shown to be necessary, that the state of the art makes it possible to apply and that are adapted to the given conditions. On an oxyacetylene brazing installation, the torch and the regulators are the critical points for protection against flow reversal and the travel back of an explosive wave.
Combined safety devices must necessarily combine three mechanisms: a gas non-return valve that prevents one gas flowing back into the other's pipework, a sintered flame-arrestor filter that extinguishes the thermal wave by absorbing heat, and a thermal cut-off that permanently closes off the gas passage as soon as the housing temperature reaches approximately 100 °C. Fitting them on the regulators is essential, ideally supplemented by miniature units screwed onto the torch handles to block any backflow as soon as it forms.
| Component | Main function | Check point on the construction site | Replacement criterion |
|---|---|---|---|
| Non-return valve | Prevent gas mixing in the hoses | Flow direction (arrow on body) and internal tightness | Gas backflow detected by tester or visible fouling |
| Sintered flame arrestor | Extinguishing the flame front by cooling | No soot and nominal flow retained | After any confirmed flashback or crushing |
| Standardised hose | Separate routing of the fluids (blue/red) | No cracks, burns or pronounced kinks | Expiry date exceeded or porosity |
| Protective cap | Protecting the valve against impacts | Fully screwed onto the cylinder collar | Damaged thread or mechanical deformation |
On the construction site, reserve cylinders and empty cylinders must be grouped in a fenced, ventilated storage area, separate from the storage rooms for bituminous products or solvents. Empty cylinders retain a residual pressure and must be handled with the same securing and ventilation instructions as cylinders in service. The valve protective cap remains locked until the precise moment the regulators are assembled.
Emergency protocol: reacting to overheating or a leak
Internal overheating of an acetylene cylinder is the most critical situation encountered by the heating fitter. Spontaneous decomposition of the gas can start without any visible flame, often following a torch backfire not stopped by the flame arrestor or a violent impact on a cylinder lying down during transport. In accordance with art. 3 OPA, the employer takes the protective provisions and measures that meet the recognised rules of safety technology. Installation staff must be able to recognise the warning signs: a local rise in the temperature of the steel shell or black seepage at the valve.
- Evacuation and alertStop work, have the boiler room or the vehicle evacuated and warn the professional emergency services, stating the exact nature of the pressurised gases.
- Emergency coolingSpray the shoulder and body of the cylinder abundantly with a high flow of water from a protected position, only if the operation presents no direct danger to the operator.
- Exclusion perimeterMark out a safety zone of at least 50 metres around the storage area or the van until the fire brigade intervenes.
In a closed utility van, a slow leak turns the loading space into an explosive atmosphere. When the doors are opened, the absence of low-level ventilation favours the stagnation of dense gases such as propane or oxygen-enriched air. No engine must be started and no electric remote opening control must be activated. Art. 82 LAA provides that, to prevent accidents, the employer takes all the measures that the state of the art makes it possible to apply. Regular checking of the non-return safety devices, fitting of compliant combined valves and tightening of the securing straps avoid reaching such extremes on the construction site.
Frequently asked questions
How do you transport two acetylene and oxygen cylinders in a van in compliance with the regulations?
Both cylinders must travel upright, held against a solid wall by dedicated ratchet securing straps. The valve protective caps must be screwed on. The regulator and hoses are removed during the journey. The utility vehicle must necessarily have a high ventilation grille and a low outlet to prevent any gas saturation in the loading space in the event of a slow leak.
Why is it prohibited to lay an acetylene cylinder on the platform or in the vehicle?
Acetylene is dissolved under pressure in a porous mass impregnated with liquid acetone. If the cylinder is lying down, the solvent enters the valve. When it is opened on the construction site, the acetone flows into the regulator, damages the elastomer diaphragms and destabilises the gas, causing flashbacks that cannot be stopped or explosive polymerisation. After any accidental transport lying flat, stand the cylinder upright for at least twelve hours before use.
Where should non-return valves and flame arrestors be installed on an oxyacetylene brazing workstation?
The installation requires combined thermomechanical safety devices comprising a gas non-return valve and a sintered flame-arrestor element. They are screwed directly onto the outlets of the oxygen and acetylene regulators. Additional reverse-flow non-return safety devices must also be fitted as close as possible to the torch handle to protect fitters against accidental gas mixtures caused by a fouled nozzle during work in boiler rooms.
What requirements apply to the temporary storage of gas cylinders on the construction site?
The store must be sited on the ground floor, in a room ventilated to the outside or under a mesh shelter reserved for this purpose. Any storage in a basement, pit or stairwell is prohibited. Oxygen cylinders and fuel gas cylinders must be separated, held vertically by chains or collars and protected against direct sunlight and the risk of mechanical impacts.
Texts and standards cited
- OPA art. 3protective measures and installations: the employer takes the protective provisions and measures that meet the requirements of the ordinance, the other applicable occupational safety provisions and the recognised rules of safety technology and occupational medicine.
- LAA art. 82general prevention rules: to prevent occupational accidents and diseases, the employer takes all the measures that experience has shown to be necessary, that the state of the art makes it possible to apply and that are adapted to the given conditions; workers assist the employer (in particular by using personal protective equipment).