Key takeaways
- The preliminary survey validates the stairwell dimensions, the headroom and the strength of the steps.
- Lowering a heavy appliance requires a motorised mechanical means suited to negotiating the stairs.
- The crew positions itself outside the crushing zone, with one operator dedicated to the controls.
- The installer refuses the handling in writing if the geometric or structural conditions are dangerous.
Route reconnaissance, mass calculation and mechanised equipment
Delivering a thousand-litre storage tank or a cast-iron floor-standing boiler involves loads ranging from two hundred and fifty to over four hundred kilos when empty. Entrusting this mass to two fitters on a flight of stairs leads straight to muscle injury or crushing. Before starting to unload the lorry, the team leader carries out a complete dimensional reconnaissance of the route, from the outdoor access threshold to the concrete base in the boiler room. He checks the clear width between handrails, the turning radius on the landings, the headroom under the ceiling and the mechanical strength of the steps. In old buildings, worn oak steps or cantilevered molasse sandstone flights cannot bear a concentrated point load under the wheels of a loaded trolley.
- Survey of the passage clearanceMeasure the usable width at the narrowest points, in particular fire-door frames, pipework under the ceiling and handrail returns. Deduct the thickness of the appliance's protection.
- Probing the staircase structureCheck the condition of the step nosings, the absence of cracks in the concrete slabs and the anchoring of the stringers. If in doubt about the load-bearing capacity of a timber staircase, install temporary propping underneath.
- Preparing the applianceAlways remove the detachable components permitted by the manufacturer, such as insulation jackets, burners, control panels and inspection hatches, in order to lower the centre of gravity.
- Setting up the guidanceLay load-spreading plates or ribbed guide rails on the steps to avoid jolts and to pass over the step nosings without destructive mechanical shock.
| Equipment | Permissible mass | Required configuration | Advantages and limitations |
|---|---|---|---|
| Electric tracked stair-climbing hand truck | Up to 400 kg | Straight staircases, wide landings | Automatic attitude holding; bulky on tight turns. |
| Electric star-wheel hand truck | Up to 250 kg | Regular steps, shallow nosings | Very manoeuvrable on an intermediate landing; mechanical jolt as each step is passed. |
| Anchored winch with aluminium ramp | Over 400 kg | Certified structural anchor point | No physical effort for the crew; lengthy set-up time with force reactions to be taken up. |
Distribution of forces, critical thresholds and notification of refusal
The Ordinance on Construction Work requires work stations and load transport to be organised so as to limit the exposure of heating fitters to the risk of accidents and health damage. Prevention rules recommend a maximum load of twenty-five kilos per worker for manual carrying in perfect ergonomic conditions. A hydraulic storage cylinder of three hundred and twenty kilos would require thirteen coordinated people, which is physically impossible in a narrow stairwell one metre wide. Motorised mechanical assistance is therefore the only admissible method of execution. If this mechanisation proves impossible, manual intervention must be stopped categorically.
- Spiral or winding staircase too narrow to fit the frame of a mechanised trolley.
- Damaged step nosings, cantilevered steps without an outer stringer, or no possibility of propping under the flight.
- Insufficient headroom forcing the fitters to tilt the load beyond its stable tipping angle.
- Intermediate landing smaller than the combined turning radius of the load and its transport device.
- Slippery, muddy outdoor access ground or an unstabilised slope towards the access opening.
As soon as the geometric survey or the structural assessment reveals a technical impossibility, the team leader stops the operation and alerts his site management. The company then formalises a written notice to the client, in application of the duty of care provided for by the Code of Obligations (CO). This document states that the characteristics of the premises prevent safe passage under the Ordinance on Construction Work and the recognised rules of occupational safety. The letter proposes suitable technical alternatives: removing the generator by mobile crane through a basement light well whose grating has first been removed, opening a temporary floor opening, or splitting the thermal volume into several smaller modular storage tanks. The additional cost and the adjustment of the schedule are a matter for contractual negotiation.
Mechanical restraint and guidance means on the flight
Bringing a heat storage tank or a floor-standing boiler into a technical basement requires immediate abandonment of manual carrying as soon as the mass of the equipment exceeds the lifting capacity of a single fitter. The Ordinance on Construction Work requires traffic routes to be secured and falling objects on walkways to be prevented. The crew must never attempt to slide the load on simple planks relying on human strength alone. At the top of the stairs, the site foreman has a proven structural anchor point installed: a certified lifting tripod or a steel cross-beam wedged between two reinforced concrete load-bearing walls. This anchor receives a manual restraint winch or a certified steel-cable tirfor. The role of this mechanism is not to pull the appliance downwards, but to hold the mass under constant tension to neutralise any kinetic energy if the trolley loses grip or suffers a failure of its magnetic brakes.
| Transfer device | Maximum load | Clear width | Operating constraints |
|---|---|---|---|
| Electric tracked stair-climber | Up to 400 kg | 800 mm | Straight flight mandatory, intermediate landing of at least 1.20 m. |
| Electric star-wheel hand truck | Up to 170 kg | 700 mm | Solid steps only, rigid risers mandatory. |
| Low-profile trolley on steel ramps | More than 500 kg | 950 mm | Heavy anchor at the top required, headroom of at least 2.00 m under the lintel. |
- Probing the flight and laying the running tracksCheck the strength of the step nosings. Lay 22 mm marine plywood panels to form a regular ramp, fixed at the top and wedged at the bottom to prevent any sliding.
- Securing the appliance on the transport platformCentre the tank on the mechanical frame. Strap the casing down with two certified ratchet straps. The centre of gravity must stay pressed against the platform to neutralise rearing up when tipping over the edge.
- Setting up the continuous-tension restraintConnect the tirfor cable to the upper eyelet of the trolley with a forged shackle. Put the line under tension before the first step to remove any slack that could create a dynamic shock.
- Controlling the descent and stabilising upstreamOperate the electric advance step by step. Two fitters ensure axial alignment from upstream using rigid guide bars, never positioning themselves under the machine.
Structural check, damage en route and notification of refusal
Before putting a heavy machine on a service staircase, the installer rigorously checks the strength of the load-bearing structure. Cantilevered steps in hard limestone or natural stone, very common in old buildings in French-speaking Switzerland, work in direct shear at the wall fixing. Lowering a three-hundred-kilo appliance concentrates a critical dynamic stress on a very narrow bearing edge. Likewise, fir flights weakened by the persistent humidity of cellars can give way suddenly under the combined weight of the machine, the tracked device and the workers. The Ordinance on Construction Work obliges the employer to guarantee the stability of access routes to avoid any risk of collapse. At the slightest sign of cracking in the stone or instability of the stringers, the operation is suspended before the load is placed on the first step.
When the clearance under the lintel blocks the rotation of the tank, the intermediate landings prevent the trolley from pivoting or the static strength of the staircase is uncertain, the team faces a technical impossibility of execution. Continuing by force would destroy the masonry and expose the fitters to serious bodily injury. In application of the Code of Obligations (CO), where material circumstances relating to the client's structure compromise the proper and timely execution of the work, the contractor must notify the client without delay. The team leader stops the operation, parks the machine securely on a horizontal surface and formalises the refusal in writing to the site management.
- Survey of dimensional obstructions: headroom under the lintel less than the rotation diagonal, or passage width too narrow to manoeuvre.
- Proven lack of load-bearing capacity: loose stone steps, rotting timber stringers or absence of load-bearing risers.
- Justified refusal to proceed: notification of immediate interruption of manual or semi-mechanised handling to protect the integrity of the crew.
- Proposal of an alternative access: external crane lift through a basement light well, removal of a basement window frame or prior propping of the staircase.
Emergency stop procedure, blocking on the flight and formal notification of impossibility
When sliding a storage cylinder or a three-hundred-kilo boiler goes wrong in a stairwell, the physical danger is extreme. A slipping skid, a torn strap or the breaking of a timber step nosing puts the crew in a critical position. In this situation, the standing instruction given to installers remains clear: never hold the load with your arms or back. No worker must stand downslope of the thermal unit on the descending flight. As soon as an imbalance occurs, the operator releases the controls of the electric tracked handler to engage the automatic mechanical brake, while the restraint winch anchored at the upper landing blocks the descent.
When the clearance of the corridor, the strength of an old stringer or the narrowness of an intermediate landing make passage technically impossible, the site foreman must refuse to carry out the handling. The Ordinance on Construction Work prescribes organising operations so as to prevent any harm to the health of workers. Manually moving a three-hundred-kilo generator without suitable equipment ruins the technicians' spines and creates a risk of fatal crushing. The company sends a written notice of interruption to the client and to the site management. This document details the dimensions measured by laser, the insufficient turning radius, the permissible load per square metre and the impossibility of using a motorised stair-climber. The initial quote must not absorb these unforeseen access extra costs. Lifting remains stopped until a viable fallback solution is approved, such as a mobile crane working through a basement light well or the prior removal of a fanlight.
- Measure with a laser rangefinder the usable passage widths, headroom and turning radii on each landing.
- Notify by registered letter or against signature the refusal of manual transport due to danger of serious bodily harm.
- Require the intervention of a company specialised in heavy crane lifting or the opening of a dedicated floor opening.
Frequently asked questions
How many operators are needed to lower a 300 kg cylinder to the cellar?
Handling a load of three hundred kilos requires three trained professionals, even with an electric tracked hand truck. The main operator steers the handle and modulates the speed of descent. The second installer, positioned to the side outside the line of fall, stabilises the machine against tipping and checks the passage over the step nosings. The third man stays on the landing to monitor the restraint sling and block traffic on the stairs.
What should be done if the old timber staircase has worm-eaten or flexible steps?
Sliding a three-hundred-kilo thermal appliance directly is prohibited on a deteriorated staircase. Fir steps flexing under the load risk breaking cleanly. The crew lays two solid timber planks of sufficient cross-section along the full length of the flight to spread the pressure onto the load-bearing stringers. If the stringers themselves show signs of sagging, the installer stops work and demands certified propping.
How is a refusal to lower an overly heavy generator formalised legally?
The refusal is made by written notification from the site manager addressed to the project management, before any attempt to slide the load. The letter recalls the occupational safety requirements set by the Ordinance on Construction Work. It states the weighed mass of the appliance, the narrowness of the passage or the excessive slope found, and concludes that it is technically impossible to guarantee the physical integrity of the fitters without an external crane lift.
Is an electric stair-climbing hand truck sufficient for all types of staircase?
No, the electric tracked stair-climbing hand truck imposes strict geometric constraints. The appliance requires a minimum usable passage width of eighty centimetres and an intermediate landing at least one metre twenty deep to rotate. On spiral staircases or those with alternating treads, the support of the tracks becomes unstable and risks slipping off. In these complex configurations, the use of profiled ramps or a winch remains unavoidable.
Texts and standards cited
- OTConstSafety and protection of workers' health in construction work