Skip to content
Website
🧱 CFC 241Emitters: underfloor heating and radiatorsChapter 9 of 10 in the section

Floor cooling: temperature limit, dew point and slippery floors

This chapter guides you through the settings and safety devices of a floor cooling system. You will learn how to determine the minimum permissible water temperature, how to position the room and condensation sensors, how to configure the dynamic interlock of the heat pump and how to explain the physical limits of the system to the client.

Key takeaways

  • The flow water never drops below 18 °C, in order to prevent any condensation on the surface.
  • The controller continuously calculates the dew point from the humidity and the room temperature.
  • A direct-contact condensation thermostat immediately shuts off the valve or the circulator.
  • The installer informs the user that a cooling floor lowers the temperature without dehumidifying the indoor air.

Minimum flow temperature and dynamic dew point calculation

In an underfloor heating installation operated in cooling mode (geothermal free cooling or reversible heat pump), the finished tile surface must never reach the condensation temperature of the indoor air. When warm, humid air comes into contact with a floor that is too cold, the absolute humidity condenses into droplets. In a tiled dining room, this phenomenon turns the floor covering into a slippery film, damages the skirting boards and quickly causes damage. The heating installer's role is to limit the control settings so as to keep the circulating water above the critical thresholds.

Dew point
Temperature at which the ambient air reaches a water vapour saturation level of 100 %, causing this vapour to change to the liquid state on surfaces in direct contact with it.

In common practice on Swiss construction sites, the minimum permissible flow temperature for a cooling floor is set between 18 °C and 20 °C. This value ensures a stabilised slab surface temperature of around 20 °C to 21 °C. The SIA 384/1 standard and Swiss technical rules recommend not creating a difference of more than 3 K to 4 K between the room and the slab, in order to preserve the physiological comfort of the occupants while avoiding the risk of interstitial or surface condensation.

Condensation temperature of indoor air according to relative humidity
Room temperature (°C)Relative air humidity (%)Calculated dew point (°C)Recommended minimum flow setpoint (°C)
245012.918.0
265516.318.5
266518.821.0
287022.0Cooling shut-off

The dynamic calculation relies on a communicating central controller connected to combined temperature and relative humidity sensors placed in the reference zones. The controller applies the psychrometric calculation formula in real time. It adapts the cooling curve by raising the flow temperature by at least 2 K above the instantaneous dew point calculated in the least favourable room. If the air becomes too humid, the motorised mixing valve closes to reduce the cold flow rate.

Safety interlock chain and communication with the operator

The safety of a cooling floor cannot rely on software control alone. A sensor failure, a calculation drift or a sudden lowering of the setpoint by the user would lead to flooding of the screed. To guarantee reliable protection, the installer implements a double hardware and software barrier on the hydraulic distribution.

  • Room temperature and humidity sensor: transmits the humidity level and temperature to the heat pump controller in order to adjust the cooling water curve.
  • Condensation safety thermostat: fixed directly on the flow manifold or on the main chilled water pipe, fitted with a measuring element whose electrical resistance varies and which is sensitive to the moisture film.
  • Dry interlock contact: cuts the power supply to the secondary circulator or forces the three-way mixing valve to close as soon as the relative surface humidity reaches 90 % to 95 %.
  • Underfloor flow aquastat: mechanical with manual reset, set with a low limit stop at 16 °C to physically prevent the injection of water below this threshold.

The contractor is responsible for the proper execution of the installations in accordance with the contract for work and services under art. 364 CO. It is therefore their duty to explain clearly to the operator the real capabilities of the system. A cooling floor is not a direct-expansion air-conditioning system: it only absorbs sensible loads and does not dehumidify the occupied space at all. If the windows stay open during a hot, humid summer storm, the latent load drives up the indoor humidity, immediately triggering the safety interlock.

Positioning of the shut-off devices and flow control on the manifold

Maintaining an adequate water temperature requires a strict decoupling between the chilled water production and the distribution in the floor coils. The installer places on the flow distributor a thermowell receiving the temperature sensor connected to the mixing controller. The minimum permissible flow setpoint must under no circumstances drop below 18 °C in floor cooling, in order to keep the tile surface temperature above 20 °C. Lowering the water to 15 °C or 16 °C to force the room temperature down inevitably leads to crossing the local dew point during summer storm episodes, when the relative humidity of the indoor air exceeds 70 %.

Dew point monitoring is carried out by a redundant measurement chain. In addition to the room units continuously measuring the dry-bulb temperature and relative humidity in the reference room, the installer fits a physical condensation sensor clipped directly onto the inlet pipe of the distribution manifold. This safety element measures the surface cooling of the pipe by means of a moisture-sensitive resistive element. As soon as the relative humidity in contact with the metal or plastic pipe reaches the critical threshold of 85 %, the sensor switches a potential-free changeover contact.

Monitoring and safety devices against condensation on a cooling network
Control deviceRecommended locationAction on the hydraulic circuitReaction time
Room humidity and temperature sensorNeutral interior wall at 1.50 m above the floorContinuous shift of the calculated water setpoint5 to 15 minutes (software integration)
Contact condensation humidistatFlow pipe upstream of the distributorOpening of a dry NC contact cutting off the cold injectionLess than 30 seconds
Mechanical strap-on thermostat, low limitFlow pipework at the heat exchanger outletDirect safety shut-off of the zone circulatorAlmost instantaneous (hardware thermal safety)

The safety interlock must not rely solely on a software command from a home automation gateway. The hard-wired safety loop must act directly on the shut-off devices: the servomotors of the three-way mixing valve or the electrical supply of the secondary circulation pump. In the event of detection of critical humidity or a failure of the flow sensor causing the water to fall below 16 °C, the break contact cuts off the supply of cold fluid and switches the circuit to closed recirculation. This reflex action prevents the floor from dropping below the dew point temperature and avoids the formation of liquid water on the joints and the tiles.

Commissioning, thermal limitations and user instruction

During testing and commissioning, the technician systematically checks the flow rates on each loop at the flowmeters of the manifold. The hydraulic cooling regime shows a very small flow-return temperature difference, of the order of 3 K (for example 18 °C flow for 21 °C return). This small temperature difference requires mass flow rates about 30 % to 40 % higher than in winter heating mode. Any balancing fault leads to over-supply of certain loops where the tiles reach a dangerously low temperature too early, while other rooms remain under-cooled.

The thermal output that a cooling floor can absorb remains limited to a range of 25 W/m² to 40 W/m² in order to preserve foot-contact comfort and the safety of the occupants. The cooling floor is not an air conditioner: it does not treat the humidity of the ambient air and cannot guarantee a constant indoor temperature under intense solar loads. Art. 364 CO subjects the contractor's liability to the same rules as that of the employee. As part of this duty of careful execution, the heating installer draws up an operating guide for the occupant, explaining the operation and the limits that must never be exceeded for their installation.

  • Software lock of the minimum water setpoint at 18 °C, protected by an installer access code to prevent any risky modification by the users.
  • Keeping glazed doors and external doors closed during sunny and stormy periods in order to avoid an uncontrolled inflow of humid air into the dwelling.
  • Ban on thick rugs or insulating coverings laid on the floor, which prevent heat transfer and cause peripheral condensation on the adjacent tiles.
  • Clear explanation of the dew point alarm indicator: when it lights up, it signals a preventive automatic shutdown of the cooling unit and does not constitute a hardware malfunction of the installation.

Emergency procedure and diagnosis in case of confirmed condensation

The appearance of a film of water on the tiles of a dining room demonstrates a clear failure of hygrothermal monitoring. The danger of a domestic slipping accident then becomes very real for the users of the building. Faced with this fault, the heating engineer applies a methodical emergency protocol in order to neutralise the supply of cold, identify the control fault and preserve the integrity of the interior finishes.

  1. Hydraulic isolation and active shut-offThe first step is to force the closure of the motorised mixing valve and to switch off the circulator of the distribution circuit. The safety contact of the condensation sensor placed on the manifold flow must switch the heat pump to technical standby and block the production of chilled water.
  2. Physical measurements of the roomThe service technician uses a calibrated thermo-hygrometer to measure the room temperature and relative humidity, then a contact thermometer for the slab. Comparing the actual calculated dew point with the water flow temperature clearly reveals the extent of the undercooling suffered by the floor covering.
  3. Identification of the root causeThe examination checks for the absence of massive, uncontrolled inflows of humid air, such as a French window left open during a stormy episode, or a sensor fault. In accordance with art. 364 CO, the contractor carries out the work under their personal direction and bears responsibility for the proper execution of the technical services entrusted to them.

Closing the intervention requires drawing up a repair report handed to the owner or the technical manager of the building. This document recalls the unavoidable physical constraints of passive or active floor cooling. Unlike a direct-expansion air conditioner fitted with a condensate collection tray, the floor removes no water vapour from the indoor atmosphere. During a humid heatwave, forcing too low a room setpoint is an illusion that produces a soaked floor. The technician access code of the main controller must remain confidential to prevent the occupant from bypassing the safety interlock of the heat generator.

Frequently asked questions

Why does the tile floor become slippery even before any drops of water are visible?

As soon as the surface temperature of the slab approaches the dew point to within one kelvin, a microscopic layer of moisture is adsorbed onto the porcelain stoneware tiles. This invisible film radically reduces the dynamic friction coefficient of the floor without forming visible puddles. Visual detection often comes too late, hence the need for a condensation sensor set to trigger at ninety-five per cent local relative humidity on the manifold.

What is the absolute lower limit for the water flow temperature in cooling mode?

In practice on Swiss construction sites, the control locks the minimum water setpoint between eighteen and nineteen degrees Celsius. Going below eighteen degrees exposes the installation to condensation as soon as the indoor air exceeds twenty-five degrees with sixty per cent relative humidity. Even though the heat pump can produce water at seven degrees for fan coil units, the low-temperature floor circuit requires this higher threshold to avoid any risk of surface liquefaction.

How does the system react if the occupant leaves a glazed door open during stormy weather?

The intrusion of warm, saturated air makes the indoor dew point jump from sixteen to more than twenty-one degrees within a few minutes. The room sensor transmits this change to the controller, which raises the flow setpoint. If the floor surface falls below this critical threshold, the condensation sensor placed on the manifold opens its dry contact. This action cuts off the water circulation and prevents the formation of a slippery film.

Can the user be allowed to change the minimum temperature on their thermostat?

No, the setting of the minimum permissible temperature belongs exclusively to the installer menu locked by an access code. Letting the occupant lower this value on the pretext of feeling a stronger coolness would inevitably lead to soaking the floor on humid days. The installer must explain that floor cooling provides gentle comfort by shaving summer heat peaks, but does not replace a dedicated refrigeration-based air conditioning system for removing humidity.

Texts and standards cited

  • CO art. 364obligations of the contractor: liability subject to the same rules as that of the employee; he carries out the work in person or under his personal direction; unless otherwise customary or agreed, he procures at his own expense the means, equipment and tools required.

In the same section