🧱 CFC 241Heat pump: source, installation and noiseChapter 3 of 10 in the section

Decoupling the machine: base, anti-vibration mounts and flexible connections

The vibrations of a poorly isolated compressor travel through the load-bearing structure and create audible resonances in the dwellings. This chapter details how to build a base decoupled from the slab, how to select the anti-vibration mounts methodically and how to fit the flexible sleeves to prevent any structure-borne transmission.

Key takeaways

  • The SIA 181 standard requires strict acoustic insulation against noise from internal technical equipment.
  • The heavy concrete base must be decoupled from the structural work by a resilient mat.
  • Elastomer mounts or springs are sized according to the total mass and the rotation frequency.
  • Flexible compensating sleeves prevent vibrations from being transmitted from the generator to the hydraulic pipework.

Designing and casting a heavy base decoupled from the load-bearing slab

Structure-borne transmission is the most costly trap when installing a heat pump in an indoor plant room. When the vibrations emitted by the compressors, circulators and fans enter the reinforced concrete of the building, the acoustic energy travels without significant attenuation up to the upper floors. The slab then acts like a loudspeaker membrane. In operation, a low-frequency dull noise is transmitted into sensitive rooms, creating a clear non-conformity with the requirements of the SIA 181 standard on noise protection in buildings.

To stop this spread, fixing the machine mechanically and directly to the floor slab or the raft foundation is prohibited. The first physical barrier is an inertia base in reinforced concrete, cast completely independently of the load-bearing structure. The aim is to provide sufficient stabilising mass, ideally between one and two times the total weight of the heat pump filled with water. This extra load absorbs the compressor's jolts and lowers the centre of gravity of the assembly.

  1. Laying the resilient underlayRoll out a closed-cell elastomer or polyurethane mat onto the bare load-bearing slab, specifically rated to carry the permanent load without excessive residual settlement. Turn the insulating material up against the vertical walls all around the perimeter.
  2. Installing the formwork sealingLay a robust polyethylene film over the insulation, with welded or taped overlaps. This sheet prevents concrete laitance from penetrating and forming hard connections between the base and the load-bearing slab.
  3. Reinforcing and casting the inertia massPlace the reinforcement mesh on plastic spacers without puncturing the sealing film. Cast dense concrete at least 150 mm thick. Under no circumstances pass anchor rods grouted into the load-bearing floor through the base.
  4. Treating the perimeter jointOnce the concrete has fully set, trim the perimeter resilient strips that protrude from the base. Fill the annular gap with a flexible, permanently elastic sealant, with no hard point.

Noise and vibrations must be avoided or combated by construction measures, measures on operating installations, insulation or isolation of the sources, or by work organisation.

art. 22 OLT 3

Selecting the anti-vibration mounts and fitting the decoupling sleeves

A floating base is not enough if it remains directly coupled to the machine frame. The heating installer must insert a second level of decoupling between the sections of the thermodynamic unit and the concrete mass. Dampers are never chosen by guesswork. The choice is based on an accurate calculation of the static load on each support point and on the minimum rotation frequency of the compressor, which varies depending on whether it runs at fixed speed or via an inverter frequency drive.

Selection criteria for anti-vibration suspensions under a thermal generator
Support technologyNatural frequency rangeTypical static deflectionRecommended field of application
Elastomer pads and mounts8 Hz to 15 Hz2 mm to 6 mmFast rotating machines (above 1500 rpm), compact outdoor units.
Helical steel springs3 Hz to 6 Hz15 mm to 30 mmLarge low-speed compressors or those fitted with inverters running below 30 Hz.
Combined spring and elastomer mounts4 Hz to 8 Hz10 mm to 20 mmHeat pumps on roofs or on light floors requiring a high level of damping.

Sizing the suspensions requires checking the deflection of each mount once the heat pump is filled with water and ready for service. A mount that is too hard transmits all of the mechanical pulsations. Conversely, an undersized mount bottoms out mechanically, producing a metal-to-metal contact that destroys the acoustic filtering effect. The asymmetric centre of gravity of a heat pump, caused by the off-centre weight of the hermetic compressor and the plate heat exchanger, frequently makes it necessary to combine mounts of different Shore hardness under the same frame.

Even when perfectly suspended on its mounts, a heat pump feeds its oscillations into the distribution pipework if the hydraulic connections are rigid. Metal pipes carry the shock wave into the fixing clamps and then into all the masonry of the building. To break this transmission path, the installer systematically fits flexible compensating sleeves in reinforced elastomer or braided anti-vibration flexible hoses on the flow and return of the primary circuit and of the condensers.

Finally, all pipes connected to the machine require decoupled wall penetrations. The pipe must never touch the concrete or masonry of the plant room. A sleeve through the wall lined with polyethylene foam or rock wool provides the mechanical isolation. This discipline at the singular points ensures lasting compliance with the acoustic requirements of the SIA 181 standard and protects the company from tenant complaints that cannot be resolved without completely removing the unit.

Positioning the anti-vibration mounts and fitting the flexible sleeves

The effectiveness of a decoupling system depends on strict compliance with the load conditions of each support point. A heat pump has an asymmetric mass because of the off-centre position of the compressor and the plate heat exchanger. If the sized anti-vibration mounts are swapped or poorly distributed, the underloaded elastomer elements remain too stiff and transmit the vibrations, while the overloaded elements are fully crushed until they bottom out, creating a direct metal connection with the floating base.

  1. Checking the base and positioning the supportsCheck the flatness of the surface of the decoupled concrete base. Mark out the exact position of the anti-vibration mounts, strictly following the load markings given in the data sheet of the acoustician or the manufacturer.
  2. Lowering the machine and levelling itLower the heat pump vertically without hitting the mounts, so as not to shear the damping pads. Check the level on the frame along two perpendicular axes. Correct any deviations by shimming under the mount base plates without introducing any twisting stress into the frame.
  3. Checking the static deflectionUse a vernier caliper to measure the actual deflection of each mount under the operating weight of the machine (including the water in the evaporator and the condenser). The measured deflection must match the theoretical design value with a maximum tolerance of 10 %.
  4. Fitting the flexible sleeves on the hydraulic circuitInstall the rubber compensating sleeves or axial compensators on the flow and return connections. The sleeves must be fitted straight, with no angular misalignment, no axial twist and without carrying the weight of the upstream distribution pipes.

Eliminating sound bridges and acceptance checks according to SIA 181

The transmission of a structure-borne wave into the massive structure of the building generates very low-frequency resonances in adjacent or overlying living spaces. The SIA 181 standard sets the requirements for noise protection from technical installations. If the vibrations of the refrigeration unit enter the reinforced concrete, the low frequencies travel from floor to floor without significant attenuation, turning the floors and light partitions of the flats into true loudspeaker membranes.

Critical connection points and decoupling measures
ComponentRisk of installation errorRequired insulation measure
Main hydraulic pipesMechanical tension or compression on the sleeveSupport the pipework with fixed brackets immediately after the flexible sleeve.
Wall fixing clampsBare metal clamps tightened onto the pipesClamps with thick double-lip EPDM lining and decoupled hanger screws.
Penetrations through slabs and wallsDirect mortar grouting around the fluid pipesOversized sleeves packed with mineral wool and sealed with flexible sealant.
Electrical supply trunkingRigid trunking screwed to both the wall and the heat pumpPower cables run loosely in a flexible spiral conduit without tension.

The employer and the installation teams must ensure that nuisances are controlled from the design of the installation, in accordance with the general principle of prevention set out in art. 22 OLT 3, which requires noise and vibrations from work installations to be avoided or isolated.

  • Check the perimeter air gap of the floating base: no mortar grout, piece of tile or gravel must fill the resilient edge strip.
  • Check that there is absolutely no contact between the heat pump frame and the surrounding walls of the plant room.
  • Slightly loosen the fixing screws passing through the mounts if damping washers have not been provided, so as to rule out any rigid clamping of bolt head against plate.
  • Measure the surface vibrations with a portable vibrometer on the base and then on the load-bearing slab, in order to certify an attenuation consistent with the acoustic calculations before acceptance.

Diagnosis and remedial work when structure-borne transmission is found

When a heat pump transmits vibrations to the upper floors, the diagnosis must be carried out rigorously before heavy work is considered. A minor execution error is enough to ruin the acoustic effectiveness of an otherwise heavy base-and-machine assembly. The receiving slab feeds the compressor's excitation frequencies directly into the load-bearing concrete walls, making the sound emergence perceptible as far as the bedrooms.

  1. Systematic search for the parasitic contactInspect the entire perimeter of the floating mass. Mortar that has fallen into the perimeter joint, a tiled skirting touching the base or a sealant that is too hard creates a direct sound bridge. Run a thin blade around the whole perimeter to check that the decoupling of the base from the slab is effective over its full thickness.
  2. Mechanical check of the flexible connectionsExamine the flexible sleeves on the hydraulic pipes. An elastomer compensator fitted under axial tension, misaligned by more than 5 millimetres or restrained by a rigid clamp fixed to the wall without a resilient lining transmits the hydraulic pulsation directly to the secondary pipework and to the masonry.
  3. Load check of the anti-vibration mountsCheck the static deflection under each support point. Anti-vibration mounts sized without taking into account the asymmetric distribution of the masses (compressor side clearly heavier than the condenser) work outside their nominal range: one is crushed to its metal stop, the other remains too stiff, cancelling the attenuation at low frequencies.

If the acoustic rating level exceeds the values prescribed by the SIA 181 standard during the acceptance checks, the installer must rectify the defective interfaces. Under art. 368 CO, the client may require the defects to be remedied when the work proves not to comply with the contractual and normative rules.

Frequently asked questions

Can the mounts be fixed directly to the bare slab without casting a heavy base?

On a thin concrete slab or above sensitive rooms, this practice must be strictly avoided. The heavy decoupled base provides an essential inertia mass that lowers the natural frequency of the system and stabilises the heat pump. Without this inertia, the sized anti-vibration mounts are not enough to filter the low-frequency vibrations emitted by modern compressors.

How can I check that a flexible sleeve transmits no vibration to the hydraulic network?

Place your hand downstream of the compensator while the compressor is running at full load: the pipe must remain free of mechanical pulsation. Make sure that the first hanger clamp after the sleeve is fitted with an elastomer ring and placed at a minimum distance of one metre, leaving the sleeve its full freedom of multidirectional deformation without permanent tension.

Why are vibrations heard more in the attic than in the basement?

Structure-borne vibrations travel through the concrete walls without significant attenuation until they meet a more flexible floor, typically a roof or a light floor. These structural elements then resonate and act as a loudspeaker. The SIA 181 standard requires the source to be treated at the raft foundation to avoid this phenomenon of overall structural spread.

How should the perimeter joint around the floating base be treated after casting?

The compressible joint decoupling the base from the slab must be trimmed cleanly two millimetres below the finished level. It is then protected with a silicone or polyurethane elastomer sealant of low Shore hardness, never with rigid levelling compound or overlapping tiling. This flexible treatment prevents construction site dust or dirty cleaning water from working its way in by gravity.

Texts and standards cited

  • SIA 181Noise protection in buildings: acoustic requirements for technical installations
  • CO art. 368 COClient's rights in case of defects in the work: repair, price reduction or damages