Key takeaways
- Forced mechanical ventilation extracts the heavy gases that accumulate at the low point of the plant room.
- A portable multigas detector continuously monitors the oxygen content and the explosivity thresholds.
- The outside attendant maintains permanent visual or voice contact with the boiler-room fitter.
- Access doors must remain free of any unintended locking, with hose crossings protected.
Clearing the air and forced extraction in a blind boiler room
Boiler rooms located on the second basement level or at the back of a courtyard often have a blind layout, with no windows and with airtight fire-rated lobbies. During the assembly of heat-distribution pipework by brazing, the draining of installations or the vacuum pulling of thermodynamic circuits, the gases used rapidly alter the ambient atmosphere. The inert gases used for purging, the refrigerants used in retrofits and acetylene and propane fumes are denser than air. Without airflow sweeping the room, these compounds stagnate at floor level, accumulate in technical trenches or lifting pits, and displace breathable air from the bottom upwards, with no obvious warning smell.
Art. 18 OLT 3 deals with air pollution. Art. 33 OTConst specifies that the ambient air at workstations contains between 19 and 21 % oxygen by volume and that hazardous substances are discharged to the open air, filtered or diluted by artificial ventilation. In a boiler room not sufficiently ventilated by a static system, the installer sets up a mobile blowing or mechanical extraction unit before any torch is lit or any fluid is purged. Simply opening a door leaf is in no case acceptable air renewal for hot work.
- Check the oxygen content with a calibrated multigas detector before going down to the boiler-room floor.
- Deploy a reinforced spiral extraction hose to prevent the duct from collapsing under negative pressure.
- Keep the axial fan running continuously for as long as the fitters are present.
- Strictly prohibit the use of pure oxygen to ventilate or cool an overheated confined space.
In addition to extraction at the low point, a supply of fresh outside air by mechanical blowing helps to mix the volume evenly and speeds up the removal of brazing fumes. The injected airflow must, as a minimum, replace ten to fifteen times the geometric volume of the room per hour during prolonged thermal work on steel or copper manifolds.
Buddy supervision and permanent securing of the access
Carrying out thermal work in a confined volume strictly prohibits lone working. An operational pair is formed from the preparation of the construction site. The first fitter carries out the pipework or connection work inside the room, while the second person acts as lookout and safety attendant from outside the confined area. This attendant stands immediately next to the access, outside the potentially polluted atmosphere, and keeps direct visibility or an uninterrupted voice link with his colleague.
- Position of the attendantThe lookout stays at the landing or in front of the access lobby, equipped with a direct means of communication with the emergency services and a self-contained torch.
- Monitoring ambient parametersThe attendant keeps an eye on the remote display of the gas detector and checks that the air extraction unit keeps running properly.
- Action in the event of an incidentIf the fitter feels unwell, the attendant alerts the emergency services without entering the room himself unless wearing self-contained isolating respiratory protection.
The exit route must remain fully accessible at every moment. It is out of the question to use toolboxes, gas cylinders or makeshift concrete blocks to hold the door leaf, as these objects may slip and jam the door. The installer fits a reliable mechanical wedge or uses a door stop designed for the purpose, while laying a rigid crossing bridge over the ventilation ducts and the flexible torch hoses. This mechanical protection ensures that the door will not pinch the lines and that the fitter can leave the boiler room in a single direct movement without stumbling over an obstacle on the floor if an emergency occurs.
| Safety item | Function on site | Critical check point |
|---|---|---|
| 4-gas detector | Oxygen and explosivity monitoring | Calibration up to date and prior atmosphere test |
| Mobile extractor | Clearing the atmosphere | Duct discharged to open air without recirculation |
| Threshold bridge | Protection of hoses at crossings | Clear walkway with no trip hazard |
| Outside attendant | Alarm and access control | Permanent presence without leaving the post |
Controlling dense gases and adjusting the airflow in the confined space
In a blind boiler room or a technical basement with no natural openings, brazing, chemical stripping or the draining of thermal installations generate pollutants with dangerous airflow behaviour. Gases used as fuel (propane, butane) or for purging (argon, nitrogen), as well as solvent vapours and certain refrigerants from heat pumps, are denser than air. Without mechanical turbulence, these compounds flow along the walls, fill the low points, accumulate at floor level and gradually push oxygen upwards, with no smell or warning colour.
To guarantee this breathable atmosphere prescribed by art. 33 para. 1 OTConst, forced ventilation cannot be improvised with a simple axial fan placed in the middle of the room. Disorderly mixing puts the vapours back into suspension and directly exposes the fitter's airways. The set-up requires an extraction or blowing fan connected to semi-rigid spiral ducts at least 200 mm to 300 mm in diameter.
Art. 18 OLT 3 covers air pollution at the workplace. The technique chosen by the installer depends on the pollution source. When the torch produces rising thermal fumes, the extraction hood is hung as close as possible to the heating zone to carry metal oxides outside. Conversely, during purging or when dense gases are used, the suction nozzle must be placed against the floor slab, in the lowest corner of the boiler room, while fresh air is blown in from the opposite side to sweep the entire technical volume.
Keeping the escape route clear and buddy supervision protocol
Access to an underground boiler room is the only lifeline of the personnel working there. As soon as a space is classified as confined, work by a lone fitter is prohibited: the permanent presence of a second trained person is an integral part of the work method. This safety attendant stays outside the danger zone, at the access landing or at the top of the hatch, maintaining continuous visual or verbal contact with the operator in the pit.
| Layout of the technical room | Critical risk of entrapment | Material arrangement on the construction site |
|---|---|---|
| Blind boiler room with EI30 swing door | Accidental locking, air ducts jammed | Latch deactivated, door leaf mechanically blocked, clear passage of 80 cm |
| Distribution pit or underground substation | Accumulation of heavy gases, climbing out impossible without help | Fixed ladder extending 100 cm above the pit edge, rescue harness with davit arm |
| Blind basement with a zigzag route | Loss of orientation in dense brazing fumes | Battery-powered lighting along the floor, direct radio link between the pair |
The lookout's task is exclusive: he does not prepare crimp fittings, does not cut steel tubes and does not load the van. If his colleague feels unwell, if the forced ventilation fails or if the portable multigas detector (CH4, CO, H2S, O2) sounds an alarm, his first action is to shut off the supply from the gas cylinders left outside, raise the alarm and start emergency extraction without ever exposing himself to a contaminated atmosphere.
Finally, the evacuation route must remain fully clear over a constant minimum width. Boiler cartons, antifreeze drums, dismantled circulating pumps and cable drums must on no account be left in the line of the door or in the flight of stairs. Any obstacle turns a ten-second quick escape into a deadly trap in the event of a fire or sudden oxygen deficiency.
Emergency response to an airflow failure in a basement
In a blind or underground boiler room, the failure of an extraction unit or a sudden leak of technical gas turns the room into a respiratory trap. Dense gases such as propane or certain refrigerants push out the ambient air from the floor with no visible sign. Art. 33 OTConst regulates air quality at workstations, requiring in particular an oxygen content between 19 and 21 % by volume and the discharge, filtration or dilution by artificial ventilation of hazardous substances. Art. 18 OLT 3 for its part aims at preventing indoor air pollution.
- Alarm and withdrawal by the outside attendantAs soon as the portable detector sounds or voice contact is lost, the attendant outside gives the order to evacuate. He operates the manual control of the room's forced ventilation to push the fresh-air flow to its maximum.
- Evacuation along the marked routeThe worker reaches the access without trying to recover his heavy tools. The exit route kept clear allows a quick exit to the landing without stumbling over crates of fittings or brazing cylinders.
- Securing the lobby and calling the emergency servicesOnce the fitter is out, the fire door closes without being locked, to contain the contaminated atmosphere. The pair calls 118 from a safe area, stating the fluids involved.
Buddy working and supervision require a strict split of roles: the person guarding the access stays outside whatever happens. If the operator collapses, the attendant keeps the mechanical ventilation running, guides the professional rescuers on their arrival and prevents anyone else from going down into the contaminated area.
Frequently asked questions
Why is it prohibited to wedge open the fire door of a boiler room under works?
The temptation is great to wedge the door with a wooden wedge to run hoses or ventilate. If a fire starts during brazing, the automatic door closer can no longer perform its compartmentation function. Toxic smoke invades the building's stairwells. Air circulation must be provided by a dedicated forced-ventilation duct, leaving the door leaf free to close.
What exact role must the outside attendant fulfil during the work?
The attendant stays in a ventilated area outside the room. He maintains continuous visual or voice contact with the heating installer. He checks that the mobile fan works properly and watches over the exit route kept clear. If the worker feels unwell, he raises the alarm and guides the emergency services without going down into the contaminated atmosphere himself.
How should the ventilation ducts be positioned when gases heavier than air are used?
Propane and most refrigerants sink to the floor slab, pushing oxygen upwards. For effective extraction, the suction mouth of the flexible duct must be placed less than twenty centimetres from the floor, at the lowest point of the room. The fresh-air blowing fan is installed outside to inject clean air at the upper level.
Can one work alone in a boiler room when wearing a four-gas detector?
No. Even with a calibrated detector, a fitter working alone in a confined basement risks sudden loss of consciousness in the event of an accidental purge or massive gas release. The detector warns of the danger but can neither winch up a casualty nor call the emergency services. Organising work in an enclosed space with no direct exit requires the permanent presence of a pair dedicated to outside supervision.
Texts and standards cited
- OTConst art. 33air quality: oxygen content between 19 and 21 % by volume, limit values for hazardous substances not exceeded, discharge, filtration or dilution by artificial ventilation
- OLT 3 art. 18air pollution