Key takeaways
- An unsealed bottom edge draws in standing rainwater by capillary action until the wood rots.
- Systematically removing fittings and hinges guarantees a perfectly continuous protective paint film.
- Careful sealing of end grain is carried out before any intermediate coat or microporous finish.
- Excess film thickness in the rebates causes the sashes to stick immediately in their rebates.
Seal the bottom edge and treat the critical water-accumulation points
On a timber window sash, fungal decay almost never starts in the middle of the stiles. Run-off water flows down the glazing, passes the drip rail and collects on the bottom rail of the frame or drips under the bottom edge of the sash. At this precise spot, the cuts in the wood leave the grain open: this is end grain. These fibres act like a bundle of straws that draws up standing moisture by capillary action. As soon as the moisture content of the wood exceeds twenty per cent over a prolonged period, wood-destroying fungus settles in and rots the core of the profile, without the outer surface film immediately showing any visible blistering.
- The bottom edge of the sashes: a face that is invisible from the inside and all too often botched or simply skipped during a brush refresh without taking the sash off.
- The drip groove of the drip rail: a groove under the sill piece that breaks up the water stream and is often filled by successive paint runs.
- The lower corner joints: tenons and mortises that work under thermal shock, crack the dry film and let infiltrating water in.
- The bottom glazing rebate: contact zone where detached putty or cracked silicone sealant traps condensation water against bare wood.
- The areas under espagnolette plates and hinges: metal screwed directly into the wood, creating a focus of oxidation and permanent condensation.
| Critical zone | Common defect | Work required of the painter |
|---|---|---|
| Bottom edge of sash | Open fibrils, blackening, soft rot | Mechanical stripping to bare wood, sanding P80 then P120, saturating impregnation |
| Drip groove (drip) | Groove filled by old coats, water bridge | Cleaning out with a profiled scraper to restore the capillary break |
| Mitre joints | Longitudinal crack at the stile-rail junction | Light chamfering with a triangular scraper and filling with elastomeric filler |
| Rebate bottom | Detached flashing, standing condensation water | Removal of friable putty, cleaning and renewal of the flashing |
Remove the ironmongery, treat the rebate and respect the clearances
To ensure lasting protection, the painter never paints around metal parts. Handles, finger plates, stays, hinges and espagnolette mechanisms must be fully removed. Painting around ironmongery leaves unprotected sharp edges, sticks moving parts together and prevents drying under the plates. When bare metal sits on a stripped and primed substrate, moisture can no longer get in through the screw holes or start corrosion under the paint film. Only the pins fixed in the frame stay in place, carefully masked with clean masking tape.
- Methodical removalTake off the sashes, unscrew the ironmongery, and number each part and screw in separate trays to make refitting easier without upsetting the joinery.
- Sanding and strippingStrip back the damaged wood, sand the whole profile and break all sharp edges to guarantee the minimum covering thickness of the film.
- Sealing the edgesApply two passes of water-repellent impregnation to the lower end grain until it will take no more, then a moisture-regulating primer coat.
- Painting the rebates and refittingApply the microporous system in thin, even coats, allow to dry right through before refixing the ironmongery and rehanging the sash.
The painter pays particular attention to the flexible weather seals crimped into the bottom of the rebate. These elastomer lips must on no account receive oil-based or acrylic paint: the solvents and binders plasticise or harden the rubber, destroying its elasticity and causing continuous air leaks. In the event of accidental overspill, immediately wipe the lip with a cloth soaked in a suitable cleaner before it polymerises. In accordance with the recognised rules of the trade and the Code of Obligations (CO), the painter is liable for damage caused to mechanisms and seals through lack of prior protection.
Moisture diagnosis and preparation of the five critical zones
On a timber frame, rot never occurs in the middle of a sheltered vertical stile. It takes root at the low points where rainwater runs off, where snow melts and where moisture penetrates by capillary action: the bottom edge of the sash, the mitre joints of the bottom rail and the glazing rebates. If a watertight film is applied to damp wood without first sealing the cross-cuts, the water remains trapped in the mass. With the first warmth of the sun, vapour pressure lifts the paint film, forming blisters that tear and promote immediate attack by wood-destroying fungi.
Checking the substrate requires an electric moisture meter with insulated pins in order to measure the core of the wood and not just the surface skin. Taking a single reading in the middle of a stile is pointless: the pins must be driven into the bottom rail, near the corner joints and on the bottom edge. When the level exceeds the tolerated threshold, no primer must be applied, as failure is guaranteed. The tradesperson must postpone the work, ventilate the premises or remove the sashes for drying in the workshop. Trapping water under a lacquer is the main cause of premature rot in external joinery.
- End grain
- Section perpendicular to the wood fibres where the sap channels are cut cleanly across. This zone absorbs liquid water up to ten times faster than the longitudinal faces, acting like a bundle of capillary tubes open towards the core of the frame.
Surface preparation requires removing the surface layer of greyed wood degraded by the sun. This skin has lost its mechanical cohesion: no paint can adhere to it durably. Sanding is carried out from P80 grit to P120 grit, taking care to break the sharp edges to create a chamfer with a radius of at least 2 mm. Sharp corners cause the film to thin spontaneously under the effect of surface tension, starting a rapid failure of the protective coating when exposed to the weather.
Fibre saturation, application protocol and mechanical tolerances
Durable protection of the five critical points relies on the exclusive use of moisture-regulating products. The system must prevent penetration of external liquid water while allowing internal water vapour generated by occupied rooms to escape. The treatment of cross-cuts and joints tolerates no shortcut: open fibres must be chemically saturated before any application of microporous build-up paint.
| Critical point | Degradation mechanism | Mechanical preparation | Recommended finishing system |
|---|---|---|---|
| Bottom edge of sash | Intense capillary suction by the cut fibres | Stripping to bare wood and breaking edges to 2 mm | Saturating impregnation and microporous edge sealer |
| Lower mitre joints | Cracking of the film due to differential shrinkage | V-opening of the cracks and brushing | Penetrating primer and elastomeric bridging filler |
| Rebate and rebate bottom | Prolonged standing water under the glazing | Removal of chalking putty and dust removal | Regulating primer and elastic microporous enamel |
| Drip rail and drip | Erosion of the film on the drip underside | Stripping the drip back to bare wood and fine sanding | Two coats of high-UV-resistance satin enamel |
| Ironmongery recesses | Capillary infiltration under screwed-on ironmongery | Removal of espagnolettes and sanding of the recesses | Fungicidal protective primer before refitting the ironmongery |
- Removal of the ironmongeryRemove espagnolettes, keeps and ironmongery completely. The painter treats the wood under the metal plates to eliminate unprotected zones of capillary infiltration.
- Fungicidal impregnation and saturationApply a water-repellent regulating primer to all bare areas, brushing the bottom edge until the capillary network will absorb no more.
- Sealing the end grainApply a specific microporous sealer to the bottom edge in order to close the vessels hermetically without forming a troublesome excess thickness.
- Satin microporous finishApply two even coats of microporous paint along the grain, spreading the material to avoid excess thickness in the corners of the rebates.
The painter must guarantee a peripheral operating clearance of 3 to 4 mm after complete drying. Excessive build-up of successive films in the rebates rubs when the window is operated, tears off the paint and jams the frame as soon as the wood swells in damp weather. It is strictly forbidden to paint flexible silicone or EPDM weather seals: the paint hardens the elastomer, destroys its elasticity and creates air and water leaks. Finally, the water drainage holes at the bottom of the frame must remain perfectly clear to drain condensate and driving rain to the outside.
Handling critical damage and remedial protocols
On a renovation construction site, stripping external joinery regularly reveals structural defects hidden by old watertight films. When the tip of a knife sinks more than five millimetres into the end grain of the bottom edge, the mitre joint or the underside of the drip rail, the painter's work stops immediately. Filling a damp cavity with polyester filler or an oily filler is a clear execution defect: the brown cubical rot will continue to develop under the new film, causing it to peel off prematurely at the first summer thermal cycle.
- Finding of deep rot and duty to notifyIn the event of fungal decay affecting the mechanical strength of the bottom joint or the drip rail, formally report the defect to the site management by written notice. Replacement of the affected part or the making of a sound-wood graft is the joiner's responsibility before any resumption of the finishing work.
- Dealing with jamming after dryingIf the sash sticks after application, pinpoint the rubbing area using tracing paper or by rubbing with chalk. Take the sash off its hinges, mechanically sand the excess film down to the substrate to restore a clearance of at least two millimetres, then saturate again with a thin microporous coat.
- Restoring fouled ironmongeryLacquer runs in the recesses, on espagnolette rods or on hinges cause jamming and destroy the weather-tightness of the profiles. Remove the soiled ironmongery, strip the residues with a suitable solvent without attacking the galvanising, then spray a dry PTFE lubricant before refitting.
The painter is responsible for the continuity of his microporous system on the prepared surfaces, but cannot be held liable for a warped sash or for wood whose internal moisture prevents any adhesion. Reporting structural damage in accordance with the rules of the SIA 118 standard relieves the firm of liability and formally records the technical reservations in the site minutes.
Frequently asked questions
Can the flexible weather seals housed in the rebate be repainted?
No, the peripheral rubber or silicone weather seals must never be painted. Dry paint hardens elastomers, cancels their ability to compress and quickly causes them to stick permanently against the frame rebate. During painting work, these seals must be carefully removed from their groove or fully masked with suitable protective tape, then cleaned without aggressive solvent before the sashes are put back into service.
What minimum clearance must be kept between frame and sash to prevent the film from sticking?
A peripheral operating clearance of at least two millimetres is required on each contact face after the system has dried completely. The combined application of a primer and two finishing coats generates an excess thickness of one hundred to two hundred micrometres per face. If the initial clearance is insufficient, the film thickness causes destructive rubbing and leads to irreversible sticking of the films if the window stays closed for a long time in hot weather.
Why does the end grain of the bottom edge absorb more paint than the faces?
The longitudinal fibres of the end grain act like a bundle of capillary channels open to the outside. Their absorption capacity is up to twenty times greater than that of faces sawn flat-sawn or quarter-sawn. To guarantee effective protection against standing water at the sill, this bottom edge requires several consecutive passes of impregnating primer or a specific saturating treatment, applied wet on wet until it will take no more, before starting the finishing coats.
How should the joint cracks under the drip rail be treated without blocking the wood's breathing?
The shrinkage cracks at the mitre joints must be filled exclusively with a microporous elastic filler compatible with water-based or solvent-based paints. Never use standard silicone sealant or rigid resin, which blocks gas exchange or prevents the natural hygroscopic movements. After applying the impregnating primer and allowing it to dry, inject the filler into the clean crack, smooth it carefully without excess thickness, then cover it with the intermediate coat of the paint system.
Texts and standards cited
- norme SIA 118General conditions for the execution of construction work
