Key takeaways
- Immediate flushing of the pressurised circuit prevents permanent blocking of airless valves and nozzles.
- Airtight wrapping in plastic film keeps the roller sleeve intact until the next day without any intermediate washing.
- Settling in three airtight cans allows the flushing solvent to be reused three times.
- Strict application of the OPChim governs vapour capture and the safe storage of hazardous residues.
Flushing the spray gun circuit without waiting for the binder to set
On an airless pump, a mixed system or a low-pressure unit, a twenty-minute delay in emptying the circuit is enough to ruin the lower pump packings and valve seats. Acrylic, alkyd and water-based polyurethane resins undergo accelerated coalescence due to mechanical heating in the constriction zones. A poorly flushed spray gun becomes unusable: the build-up of cured paint film on the needle, in the handle filter or against the outlet ball destroys the needle seal, causes spitting on restart and requires complete dismantling of the hydraulic chambers. The purge process must therefore begin at the exact moment work stops, before the paint film loses its solubility.
- Depressurise and switch to the return loopStop the mechanical drive of the pump, point the trigger towards the inside of the paint drum to release the residual pressure, then turn the purge valve towards the recirculation hose.
- Push the good paint back into the original containerReplace the paint bucket with the primary flushing liquid tank. Prime the pump at low speed to recover the volume of paint contained in the suction tube before the clear fluid arrives.
- Flush the high-pressure line and the gun bodyRemove the reversible nozzle and its nozzle holder. Aim the gun, without nozzle, against the wall of an earthed metal collection container, then open fully until clean liquid flows out.
- Mechanically clean the filtration elementsRemove the handle filter, the main manifold filter and the suction strainer. Brush these components in a clean bath using a soft synthetic-bristle brush, never a metal scraper.
Handling solvents and degreasing fluids requires strict compliance with the provisions of the Chemicals Ordinance (OPChim) and the Suva requirements on explosive atmospheres. The friction of a solvent sprayed at high pressure generates electrostatic charges capable of causing a spark and igniting solvent vapours. The gun body must remain in firm contact with the metal of the collection container, which must be earthed. The operation is carried out in a ventilated area, the painter wearing chemical-resistant nitrile gloves, sealed goggles and a half-mask filtering organic vapours.
Keeping the roller sleeve and regenerating the solvent by settling
Cleaning a paint roller between two successive coats is a clear waste of time and an ecological heresy. The operation disperses between thirty and fifty litres of drinking water fouled with synthetic resins, weakens the heat-bonded assembly of professional sleeves and soaks the textile fibres, which alters the viscosity of the next pass. If work continues the next day with the same product, the roller must not be rinsed: simply load it with fresh material without excess, then wrap it airtight in a sheet of stretch polyethylene film or a dedicated storage box, expelling the air inside. The sleeve keeps its elasticity and is immediately ready for the next application.
| Container | Cleanliness level | Role in cleaning | Final destination |
|---|---|---|---|
| Can 1 (first bath) | Spent solvent, saturated with resins and fillers | First soaking to loosen and coarse cleaning | Disposal of sludge through a special channel |
| Can 2 (second bath) | Semi-clarified solvent after settling | Intermediate rinsing of equipment and brushes | Transferred to can 1 in the next cycle |
| Can 3 (finishing bath) | Clear solvent, low residue content | Final rinsing of fine parts and nozzles | Transferred to can 2 in the next cycle |
A flushing solvent is never disposed of after a single use: stored at rest for forty-eight to seventy-two hours in a sealed closed drum, the mineral pigments and heavy resins settle naturally at the bottom of the container. The clarified liquid in the upper part is carefully drawn off by siphoning or top draining, then fed back into the washing cycle. This three-stage procedure allows the same volume of solvent to be used three consecutive times before saturation, which drastically reduces the cost of buying synthetic thinner while reducing atmospheric emissions of volatile organic compounds.
Organisation of the settling station and management of residual sludge
Sensible management of washing liquids relies on a fixed or mobile station made up of three airtight metal containers labelled in accordance with the Chemicals Ordinance (OPChim). Virgin solvent is used exclusively for the last pass through the pump or for finishing precision equipment. The first-rinse solvent, saturated with pigments and resins, is transferred into a settling can with a conical closure. After resting for at least forty-eight hours, protected from temperature variations, the solids settle at the bottom of the container. The clarified supernatant is then drawn off by gravity or siphoning to supply the coarse-cleaning can, ready for a new cycle.
| Washing stage | Type of fluid | Intended use | Final destination |
|---|---|---|---|
| Tank 1 (initial cleaning) | Settled solvent (second or third pass) | Initial loosening of fresh resins on nozzles and hoses | Transferred to the settling drum once saturated |
| Tank 2 (intermediate rinsing) | Clarified solvent (first settling) | Circulation through the pump and passage over the gun body | Moved to tank 1 as soon as it becomes markedly cloudy |
| Tank 3 (finishing) | Pure technical solvent | Final rinsing of needle seats and nozzle thread | Recovered for feeding back into tank 2 |
The sediments formed at the bottom of the containers are a pasty residue made up of mineral fillers and cured binders. These residues must on no account be discharged into the drain or left with the ordinary construction-site rubbish. Under the waste ordinance, these paint sludges and spent solvents are classified as special waste. The paint workshop must collect these fractions in drums approved for the transport of dangerous goods, fitted with the appropriate waste code, before handing them over to an authorised collection company with a tracking slip.
Preventive maintenance of airless spray guns and storage of equipment
Stopping spraying for more than thirty minutes requires a complete purge of the high-pressure unit. When a two-component polyurethane or epoxy lacquer has been used, gelling permanently blocks the internal circuit if the reactive solvent has not removed every trace of binder before the end of the pot life of the mixture. For water-based phases, flushing is done with lukewarm water with a neutral detergent added, followed by a pass of storage thinner to prevent oxidation of the steel compression chambers.
- Depressurising and removing the filtersSwitch the unit off, open the priming valve to release the pressure in the hose and engage the safety trigger lock. Remove the nozzle holder, the handle filter and the main pump manifold filter so as to brush them separately in the clarified solvent bath.
- Dynamic flushing in open then closed loopPlace the suction tube in the intermediate solvent can and the return hose in the waste container. Pump at low pressure until clear liquid comes out, then recirculate the clean fluid for two minutes to remove micro-agglomerates lodged against the valve seats.
- Lubricating the piston rod and storage preparationInject a few drops of oil specific to the piston throat into the stuffing box to stop the PTFE or leather seals from drying out and sticking to the metal. If the equipment is not reused the next day, fill the pump body with an anti-corrosion storage liquid to expel residual air.
The reversible tungsten carbide nozzle demands rigorous care. It is never cleaned with a metal point, otherwise the calibre of the orifice changes and uneven application beads result. The nozzle is immersed in an airtight cup containing clean solvent, diffuser facing downwards, or stored in a container filled with a solvent-based protective liquid intended for this purpose. Likewise, roller sleeves temporarily kept in airtight sleeves for resumption the next day must be inspected before reuse: if the surface film has started to dry on the edges of the plastic core, the roller must be discarded so as not to mark the finishing substrates.
Emergency procedures: recovering from mechanical blockages and managing pollution
When immediate flushing of the spray gun circuit has been neglected or interrupted by a breakdown on the construction site, the setting of the binder blocks the passage of the product within a few tens of minutes. On two-component polyurethane or epoxy systems, the irreversibility of the chemical cross-linking makes any conventional solvent ineffective once polymerisation has begun. The equipment is clogged from the suction strainer to the nozzle, leaving the pump immobilised under a dangerous residual pressure that must be released manually before any mechanical handling.
- Depressurising and isolating the circuitOpen the purge valve towards an earthed metal can to release the static charge and hydraulic pressure. Disconnect the pneumatic or electric supply before any dismantling.
- Careful dismantling of the moving partsRemove the nozzle, the nozzle holder and the handle filter. Immediately immerse these metal parts in an active soaking solvent, without immersing the flexible sealing gaskets, which would swell on prolonged contact with esters.
- Mechanical unblocking against the flowClean the nozzle channel using a calibrated nylon or brass needle, avoiding steel points, which scratch the tungsten carbide. Flush the gun body against the flow at low pressure.
If the roller sleeve kept between two coats has dried following a failure of the plastic film seal, no soaking will restore the original elasticity of the fibre: the crusted polyamide leaves unacceptable lap marks and must be discarded with ordinary construction waste. Likewise, if the reused, settled solvent starts to release dissolved resins on the first pass, the washing chain is compromised. In accordance with the OPChim and the waste ordinance, this saturated thinner must never be poured into the wastewater but recorded in a labelled drum for disposal as special waste.
Frequently asked questions
How can you save a spray gun nozzle blocked by a resin that has begun to set?
Remove the nozzle without delay and soak it in a closed container holding a solvent mixture suited to the product's safety data sheet. Use only a synthetic-bristle brush and a soft cleaning needle specific to the orifice diameter. Never force it with a piece of wire or a cutter, otherwise the spray pattern will be distorted and the part rendered unusable.
How long can a roller really be kept without washing between two coats?
For water-based paints, a roller saturated with material and wrapped airtight in stretch film or a sealed bag can be kept for up to forty-eight hours without deterioration. For solvent-based lacquers, tight wrapping blocks the evaporation of volatile compounds for twenty-four hours. If the ambient temperature exceeds twenty-five degrees, this time is halved to avoid a crust forming around the textile fibres.
How can you tell that a settled flushing solvent can no longer be reused?
The supernatant liquid becomes unusable when it retains an opaque colour or abnormal viscosity after forty-eight hours of rest. If it leaves a sticky film on a clean spatula after evaporation, its dissolved binder content is excessive. Reusing such a solvent risks fouling the pressure regulator or contaminating the next colour when the spraying machine is started up.
How should the solid deposit that builds up at the bottom of the settling tanks be disposed of lawfully?
The residual sludge from solvent clarification is flammable and polluting special waste under the waste ordinance. It is forbidden to let it dry in the open air on the construction site. Scrape these pasty sediments together into an airtight metal drum intended for this purpose, then hand them over to an approved collection company with a special waste tracking slip.
Texts and standards cited
- OPChimRules governing the handling, labelling and risk control of hazardous chemical products and solvents.
- OLEDRequirements for the separation, collection and compliant disposal of special and hazardous construction waste.
