🧱 CFC 272Section 5 of 610 chapters

Wall coverings: wallpapers and wall hangings: the execution standard

Installing a wall covering demands absolute geometric rigour and a chemical mastery of adhesive bonding under raking light. Intended for team leaders and site managers in French-speaking Switzerland, this guide details the application of CFC 272 according to standard SIA 257. From the layout of the drops to complex pattern matches, you will find here the trade rules needed to guarantee invisible joints, lasting adhesion and an acceptance without reservations.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

Norme SIA 257

15 °C

Minimum ambient air and substrate temperature for installation

Norme SIA 257

1 m to 1.5 m

Perpendicular viewing distance during the acceptance inspection

Norme SIA 257

2 %

Maximum permissible moisture content by mass of a plaster substrate

art. 367 CO

Immediately

Moment at which the client checks the condition of the delivered work and notifies the contractor of defects

Scope of the paperhanger's work and boundaries of finishing work

The field of bonded wall coverings falls to qualified painters and installers under CFC 272. Our intervention begins as soon as we take over the interior substrate in order to turn it into a uniform, stable and dimensionally neutral bonding base. This section deals exclusively with the installation of traditional wallpapers, non-woven wallpapers, textile wall coverings, paintable glass-fibre fabrics and decorative plasters applied with a trowel.

The technical boundary with the other trades must be strictly observed on Swiss construction sites. The general flatness of the walls, the levelling of masonry and plaster surfacing fall to the plasterer under CFC 271. The painter accepts a substrate with a surface quality level specified beforehand in the specification; he does not correct structural misalignments or deflections of the structural work. Likewise, checking floor moisture or slab thermal bridges falls to the screed layers under CFC 281 and to the structural work. Our trade consists of checking the condition of the background, neutralising its absorbency and installing the covering according to the rules of the trade.

Responsibility matrix by trade on interior walls
Service or checkResponsible CFCReference standardLimit of intervention
Levelling and smoothing of plasterCFC 271Standard SIA V242/1Delivery of a flat surface without hollows
Primer coat and absorbency regulationCFC 272Standard SIA 257Bonding coat and levelling of the substrate
Installation of papers and wall hangingsCFC 272Standard SIA 257Layout planning, pasting, edge-to-edge hanging and smoothing down
Waterproofing under tiles in wet roomsCFC 271 / 281Standard SIA 248Direct water spray zone (shower, bathtub)

Execution path: from substrate preparation to the acceptance record

To avoid recurring damage such as joints opening on drying, blistering or dark backgrounds showing through, the installation team must work through the ten technical chapters in a rigorous methodological order. This path guarantees a smooth transition between workshop logistics and finishing on the construction site.

  1. Preparatory phase: substrate, stripping and procurementThe construction site starts with the assessment of the existing background. If an old covering is in place, chapter [O5-05] details its removal without damaging the surface of the plaster. Chapter [O5-01] sets the protocol for fine skim coating, sanding and application of the bonding primer to seal porous backgrounds. At the same time, chapter [O5-09] secures the ordering of the rolls by means of a real take-off including waste at the pattern match and the absolute requirement of a single dye lot.
  2. Marking-out phase and pattern geometryOnce the walls are primed, the geometric setting-out determines the visual alignment. Chapter [O5-02] guides the layout planning, including the choice of the starting axis to balance centred patterns and to handle straight or drop matches. Chapter [O5-06] resolves masonry irregularities in internal and external corners that are out of plumb by means of clean cuts and calibrated overlaps.
  3. Installation phase: pasting and material specificsApplication varies according to the backing of the wall covering. Chapter [O5-03] deals with the chemistry of methylcellulose adhesives, the soaking time of traditional papers and the management of ambient humidity to prevent open joints. Chapter [O5-04] covers direct pasting of the substrate for glass-fibre fabrics and non-wovens, followed by their painting. For wet rooms such as kitchens or bathrooms outside the spray zone, chapter [O5-07] sets the waterproofing barriers and the limits of technical exclusion.
  4. Textured finish and final inspectionFor surfaces without drops, chapter [O5-08] governs the application of decorative lime or polymer plasters by means of a contractual reference sample. Finally, chapter [O5-10] defines the acceptance protocol in accordance with standard SIA 257, specifying the permissible inspection lighting and the tolerance criteria for closing out the work in accordance with art. 367 CO.

📘 Chapters in this section 10

Wall coverings: wallpaper and wall hangings

Preparing for wallpaper: skim coat, uniform absorbency and adhesion primer

Master perfect adhesion by blocking the absorbency of the background without glazing your primed substrate.

Wall coverings: wallpaper and wall hangings

Matching the pattern: direction of hanging, drop match, waste and starting point of the layout

Plan your starting axes so that patterns align without awkward cut-offs in the field of view.

Wall coverings: wallpaper and wall hangings

Opening joints: substrate shrinkage, adhesive, soaking time and heated room

Eliminate the spectre of gapped joints for good by controlling shrinkage and soaking time.

Wall coverings: wallpaper and wall hangings

Non-woven and glass-fibre cloth: gluing the wall, dry hanging and painting afterwards

Optimise your dry-hanging pace by ensuring an even adhesive film without excess thickness.

Wall coverings: wallpaper and wall hangings

Stripping the old covering: steamer, fragile plaster substrate and residual adhesive

Remove stubborn coverings without tearing off the plasterboard paper or soaking the underlying substrate.

Wall coverings: wallpaper and wall hangings

Corners: cut-through internal corner, wrapped external corner, and the wall that is out of plumb

Compensate for out-of-plumb masonry with clean double cuts in every corner.

Wall coverings: wallpaper and wall hangings

Damp room: suitable wall covering, condensation behind it, and what we refuse to install

Secure your installations in bathrooms by identifying the zones where the work must be contractually refused.

Wall coverings: wallpaper and wall hangings

Decorative plasters: mandatory sample, reproducible technique and team blending

Guarantee the aesthetic signature of a decorative plaster through formal approval of a reference sample.

Wall coverings: wallpaper and wall hangings

Ordering correctly: take-off, actual offcuts, dye lot and spare roll

Order the exact quantity by including the waste at the pattern drop and the single production batch.

Wall coverings: wallpaper and wall hangings

Accepting a wall covering: lighting, inspection distance and permitted joints

Defend your finishes at handover according to the lighting and viewing criteria recognised by the trade.