Wall coverings: wallpapers and wall hangings: the execution standard
Installing a wall covering demands absolute geometric rigour and a chemical mastery of adhesive bonding under raking light. Intended for team leaders and site managers in French-speaking Switzerland, this guide details the application of CFC 272 according to standard SIA 257. From the layout of the drops to complex pattern matches, you will find here the trade rules needed to guarantee invisible joints, lasting adhesion and an acceptance without reservations.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
15 °C
Minimum ambient air and substrate temperature for installation
1 m to 1.5 m
Perpendicular viewing distance during the acceptance inspection
2 %
Maximum permissible moisture content by mass of a plaster substrate
Immediately
Moment at which the client checks the condition of the delivered work and notifies the contractor of defects
Scope of the paperhanger's work and boundaries of finishing work
The field of bonded wall coverings falls to qualified painters and installers under CFC 272. Our intervention begins as soon as we take over the interior substrate in order to turn it into a uniform, stable and dimensionally neutral bonding base. This section deals exclusively with the installation of traditional wallpapers, non-woven wallpapers, textile wall coverings, paintable glass-fibre fabrics and decorative plasters applied with a trowel.
The technical boundary with the other trades must be strictly observed on Swiss construction sites. The general flatness of the walls, the levelling of masonry and plaster surfacing fall to the plasterer under CFC 271. The painter accepts a substrate with a surface quality level specified beforehand in the specification; he does not correct structural misalignments or deflections of the structural work. Likewise, checking floor moisture or slab thermal bridges falls to the screed layers under CFC 281 and to the structural work. Our trade consists of checking the condition of the background, neutralising its absorbency and installing the covering according to the rules of the trade.
| Service or check | Responsible CFC | Reference standard | Limit of intervention |
|---|---|---|---|
| Levelling and smoothing of plaster | CFC 271 | Standard SIA V242/1 | Delivery of a flat surface without hollows |
| Primer coat and absorbency regulation | CFC 272 | Standard SIA 257 | Bonding coat and levelling of the substrate |
| Installation of papers and wall hangings | CFC 272 | Standard SIA 257 | Layout planning, pasting, edge-to-edge hanging and smoothing down |
| Waterproofing under tiles in wet rooms | CFC 271 / 281 | Standard SIA 248 | Direct water spray zone (shower, bathtub) |
Execution path: from substrate preparation to the acceptance record
To avoid recurring damage such as joints opening on drying, blistering or dark backgrounds showing through, the installation team must work through the ten technical chapters in a rigorous methodological order. This path guarantees a smooth transition between workshop logistics and finishing on the construction site.
- Preparatory phase: substrate, stripping and procurementThe construction site starts with the assessment of the existing background. If an old covering is in place, chapter [O5-05] details its removal without damaging the surface of the plaster. Chapter [O5-01] sets the protocol for fine skim coating, sanding and application of the bonding primer to seal porous backgrounds. At the same time, chapter [O5-09] secures the ordering of the rolls by means of a real take-off including waste at the pattern match and the absolute requirement of a single dye lot.
- Marking-out phase and pattern geometryOnce the walls are primed, the geometric setting-out determines the visual alignment. Chapter [O5-02] guides the layout planning, including the choice of the starting axis to balance centred patterns and to handle straight or drop matches. Chapter [O5-06] resolves masonry irregularities in internal and external corners that are out of plumb by means of clean cuts and calibrated overlaps.
- Installation phase: pasting and material specificsApplication varies according to the backing of the wall covering. Chapter [O5-03] deals with the chemistry of methylcellulose adhesives, the soaking time of traditional papers and the management of ambient humidity to prevent open joints. Chapter [O5-04] covers direct pasting of the substrate for glass-fibre fabrics and non-wovens, followed by their painting. For wet rooms such as kitchens or bathrooms outside the spray zone, chapter [O5-07] sets the waterproofing barriers and the limits of technical exclusion.
- Textured finish and final inspectionFor surfaces without drops, chapter [O5-08] governs the application of decorative lime or polymer plasters by means of a contractual reference sample. Finally, chapter [O5-10] defines the acceptance protocol in accordance with standard SIA 257, specifying the permissible inspection lighting and the tolerance criteria for closing out the work in accordance with art. 367 CO.
📘 Chapters in this section 10
Preparing for wallpaper: skim coat, uniform absorbency and adhesion primer
Master perfect adhesion by blocking the absorbency of the background without glazing your primed substrate.
Wall coverings: wallpaper and wall hangingsMatching the pattern: direction of hanging, drop match, waste and starting point of the layout
Plan your starting axes so that patterns align without awkward cut-offs in the field of view.
Wall coverings: wallpaper and wall hangingsOpening joints: substrate shrinkage, adhesive, soaking time and heated room
Eliminate the spectre of gapped joints for good by controlling shrinkage and soaking time.
Wall coverings: wallpaper and wall hangingsNon-woven and glass-fibre cloth: gluing the wall, dry hanging and painting afterwards
Optimise your dry-hanging pace by ensuring an even adhesive film without excess thickness.
Wall coverings: wallpaper and wall hangingsStripping the old covering: steamer, fragile plaster substrate and residual adhesive
Remove stubborn coverings without tearing off the plasterboard paper or soaking the underlying substrate.
Wall coverings: wallpaper and wall hangingsCorners: cut-through internal corner, wrapped external corner, and the wall that is out of plumb
Compensate for out-of-plumb masonry with clean double cuts in every corner.
Wall coverings: wallpaper and wall hangingsDamp room: suitable wall covering, condensation behind it, and what we refuse to install
Secure your installations in bathrooms by identifying the zones where the work must be contractually refused.
Wall coverings: wallpaper and wall hangingsDecorative plasters: mandatory sample, reproducible technique and team blending
Guarantee the aesthetic signature of a decorative plaster through formal approval of a reference sample.
Wall coverings: wallpaper and wall hangingsOrdering correctly: take-off, actual offcuts, dye lot and spare roll
Order the exact quantity by including the waste at the pattern drop and the single production batch.
Wall coverings: wallpaper and wall hangingsAccepting a wall covering: lighting, inspection distance and permitted joints
Defend your finishes at handover according to the lighting and viewing criteria recognised by the trade.