Skip to content
Website
🧱 CFC 272Interior paint systems: selection and applicationChapter 4 of 10 in the section

Wet rooms: washable paint, cleaning resistance and limits against water

This chapter enables you to select the right paint system for kitchens and bathrooms according to standard SIA 257. You will be able to specify the appropriate cleaning resistance class, assess the behaviour of the film against water vapour and set out unambiguously the technical limits where paint must give way to other trades.

Key takeaways

  • A washable paint withstands maintenance scrubbing but never constitutes a waterproof barrier against liquid water.
  • Standard SIA 257 requires paints to be qualified according to their wet-scrub resistance class.
  • Exposure to vapours requires a stable microporous film, resistant to fungal growth without completely blocking exchanges.
  • Any area subject to direct runoff or standing water must necessarily be treated with waterproofing works beneath tiling.

Qualifying mechanical resistance to cleaning and vapour permeance

In wet rooms such as professional or domestic kitchens and bathrooms, confusion between cleanability and waterproofing gives rise to many disputes. Standard SIA 257 governs painting work and defines the requirements applicable to interior wall coatings. A paint film described as washable refers to a surface capable of withstanding repeated cleaning with neutral detergents without premature alteration of its binder, colour or gloss level. This in no way implies continuous impermeability against continuous or pressurised liquid water.

Wet-scrub resistance
Standardised ability of a paint film to retain its integrity and thickness after a defined number of brushing or mechanical scrubbing cycles in the presence of a cleaning solution.
Classification of interior finishes according to their behaviour under maintenance
Resistance classWear thicknessCleaning durabilityRecommended field of application
Class 1Less than 5 micrometres after 200 cyclesScrubbable and brushable, resists mild detergentsKitchen walls, changing rooms, high-traffic circulation areas
Class 2Between 5 and 20 micrometres after 200 cyclesWashable with a sponge and non-abrasive cleanerKitchen ceilings, bathroom walls outside splash zones
Class 3Between 20 and 70 micrometres after 200 cyclesCan be cleaned occasionally dry or with a damp clothDry rooms, living rooms, bedrooms

Managing air humidity requires a rigorous balance. In a kitchen or bathroom, the humidity level varies rapidly in cycles. A pure acrylic dispersion or a water-based alkyd paint of class 1 or 2 forms a closed film that limits the immediate penetration of condensation. However, this film must retain a minimum permeability to water vapour so that the mineral substrate can dry out after vapour peaks. A film-forming system that is too tight, applied on plaster or a plaster block, traps residual moisture, causing blistering through osmotic pressure as soon as the room is first heated.

Setting the application boundaries against direct water splashing

The painter must draw an uncrossable line between surfaces exposed to a humid atmosphere and those subject to direct runoff. Against a shower-head jet, bathtub splashes or hot water discharge at a sink, no dispersion paint system, even a two-component one, can substitute for structural waterproofing. Microcracks in the substrate, shrinkage of connection joints or the mere micro-porosity of the film eventually allow liquid water to penetrate, disintegrating the underlying render or plaster block.

  • Immediate surround of the shower tray and bathtub up to two metres above the tray.
  • Direct cooking and sink splashback exposed to hot grease and continuous liquid splashes.
  • Perimeter junctions between washbasin worktops and plasterboard partitions.
  • Wall bases at floor level exposed to floors being washed with large amounts of water without a waterproof skirting.

In these critical areas, the rules of the trade require composite waterproofing beneath tiling or the installation of bonded compact backing boards, work that falls to other trades such as the tiler. If the tender specification asks the painter for a lacquered or polyurethane finish within the direct reach of a shower without primary waterproofing, the contractor incurs liability if he does not formally state technical reservations before starting work. Even on a water-repellent board, paint never compensates for the absence of a corner waterproofing strip bridging the junctions.

  1. Checking the application zonesIdentify on the plans and on the construction site the geometric limits of the direct-splash zones before any application begins.
  2. Notification of technical limitsNotify the site management in writing of any incompatibility between the requested finishing system and exposure to liquid water.
  3. Application of the appropriate systemApply an adhesion primer followed by two coats of class 1 satin dispersion only on the areas of peripheral condensation.

Behaviour of binders against condensation and grease

In a kitchen or bathroom, paint suffers a combined attack: repeated cycles of relative humidity saturation, deposits of volatile fatty substances and mechanical maintenance actions. According to the requirements of standard SIA 257, the ability of a finishing coat to fulfil its role depends on the nature of the binder and the level of free resin present at the surface of the dry film. A standard matt dispersion has an open porosity that absorbs condensate and retains soiling within the coat; conversely, a satin or gloss lacquer closes the surface microstructure.

The behaviour of a film against gaseous water molecules must not be confused with its resistance to the passage of an abrasive sponge. The wet-scrub resistance class exclusively measures the mechanical removal of material after a defined number of standardised abrasion cycles. A film classified as highly resistant guarantees that regular cleaning will not cause premature polishing or erosion of the binder, but it never turns the wall into a waterproof barrier. If vapour condenses persistently without intermediate drying, moisture passes through the polymer network and reaches the render substrate.

Choice of paint systems in wet rooms according to standard SIA 257
Finishing systemResistance to air humidityCleaning resistanceRecommended use
Solvent-free matt acrylic dispersionHigh permeance, sensitive to standing condensationLow, risk of degradation through repeated scrubbingCeilings of well-ventilated bathrooms only
Pure satin acrylic dispersionGood resistance to moderate condensation cyclesExcellent, withstands frequent cleaningBathroom walls outside splash zones
Water-based polyurethane enamelLow water uptake, closed and taut filmVery high, resists household solvents and greaseKitchen walls, behind sinks, damp corridors
Two-component water-based epoxy resinAlmost vapour-tight barrier, non-saponifiableMaximum, resists detergents and disinfectantsShared sanitary rooms, professional laundries

Critical interfaces and absolute limits of paint against liquid water

Continuously splashed liquid water exerts hydrostatic pressure and capillary action that no water-based wall paint can withstand in the long term. Corner junctions, pipe penetrations and the connection with sanitary fittings are the systematic points of failure of a thin film-forming system. As soon as a microcrack appears at a junction, water seeps by capillarity beneath the dry film. Differential swelling of the substrate causes immediate flaking of the film edges, making any later cleaning destructive.

The painter must draw a clear boundary between his work and the waterproofing works of the finishing work. At the immediate perimeter of a bathtub, on the walls of a shower cubicle or beside a worktop exposed to jets, the substrate requires composite waterproofing beneath tiling or a bonded synthetic panel with welded joints. The painting craftsman is not required to make up for the absence of a technical splashback by piling on coats of varnish or gloss enamels. Faced with non-compliant instructions, the contractual rules of the Code of Obligations (CO) require a warning notice to be sent to the client in order to be relieved of liability in the event of detachment caused by water.

  1. Delimiting the exposure zonesIdentify on the plans and on the construction site the surfaces subject to direct runoff (not permitted for a simple painted finish) and those receiving only occasional splashes or vapour.
  2. Checking the minimum overlapMake sure that a rigid waterproof or tiled covering extends at least 20 centimetres beyond the water points or the areas exposed to jets before starting the junction with the paint system.
  3. Treating the connection jointInsert a fungicidal elastomer sealant between the edge of the tiling or splashback and the paint film, to prevent residual moisture from penetrating through the edge of the dry film.
  4. Observing the curing timeWarn the users that acrylic or polyurethane binders require between two and three weeks of full curing before withstanding vigorous cleaning with water.

Handling moisture damage and technical repair protocol

On a renovation construction site, the appearance of stains, blistering or mould in bathrooms and kitchens triggers the search for responsibility. The painter is frequently blamed through ignorance of the physical properties of the film. In accordance with standard SIA 257, an interior wall paint, even one formulated for wet rooms, is a decorative and soiling-protection coating, not a tanking waterproofing. Liquid water continuously splashed or infiltrated behind a skirting board inevitably ends up disintegrating the interface between the substrate and the paint.

When damage occurs, the painter's intervention must go beyond mere cosmetic concealment. Before any renewal of the finish, the moisture content must be documented, the cause of the infiltration stopped and the ventilation of the room checked. Repair then requires a systematic remediation method:

  • Manual or mechanical chipping and scraping of all flaking, blistered or chalking areas until a rigid and perfectly cohesive substrate is reached.
  • Complete drying of the substrate, verified with a pin-type or dielectric moisture meter, in order to confirm the return to the permissible values for the substrate.
  • Neutralisation of surface mould and bacteria by applying a residual curative biocide, followed by careful brushing once the surface is dry.
  • Application of an opacifying and isolating adhesion primer to block the bleed-through of residual stains, soot and mineral salts.
  • Filling with a water-repellent filler suited to wet rooms, fine sanding, then application of a two-coat system of certified washable acrylic dispersion or polyurethane paint.

If the client persists in demanding paint on a surface directly sprayed by a water jet or subject to permanent condensation without mechanical ventilation, the contractor notifies his reservations in writing. In accordance with the principles of standard SIA 118 and the Code of Obligations (CO), this step protects the company by recording its refusal to guarantee the durability of a film stressed beyond its technical limits.

Frequently asked questions

Can a washable matt paint become polished through repeated scrubbing in a kitchen?

Yes. Although a modern matt paint can reach the best wet-scrub resistance class, repeated mechanical action with a sponge or cloth crushes the mineral fillers at the surface. This creates irreversible shiny patches known as burnishing, particularly visible in raking light. For a kitchen splashback or around worktops, the painter recommends instead a satin or velvet finish, whose more closed film withstands scrubbing without lasting optical alteration.

Can the inside of a shower tray be painted directly with a washable lacquer?

No, it is technically prohibited. A washable wall paint withstands frequent cleaning and air humidity, but it is not impermeable to water under standing water or continuous direct splashing. Without a waterproofing system beneath tiling or a rigid waterproof lining, water penetrates the microporosity of the finishing film, soaks the plaster or plasterboard, and leads to widespread peeling of the film within a few weeks of service.

Is applying a paint containing a fungicide enough to remediate a mouldy bathroom?

No, this type of paint is a preventive measure, not a curative remediation. If mould is already embedded in the pores of the old coating or the plaster, painting over it traps the spores, which will proliferate as soon as moisture returns. The micro-organisms must first be destroyed with a suitable biocide, the substrate left to dry, the causes of moisture repaired and the proper ventilation rate ensured before applying a fungicidal finish.

What delay should be observed between the last coat of paint and putting the shower back into service?

Touch-dry occurs within a few hours, but full curing of a washable acrylic dispersion takes between fourteen and twenty-eight days depending on temperature and ambient humidity. During this period, the binder remains vulnerable to hot water and dense vapours. The rooms should be ventilated regularly and any exposure to saturated humidity avoided for at least forty-eight to seventy-two hours after application of the second coat.

Texts and standards cited

  • SIA 257Paints, varnishes and interior wall coverings
  • SIA 118General conditions for the execution of construction works
  • Code des obligationsGeneral rules on the contract for work and notice of defects

In the same section