🧱 CFC 272Exterior painting: facade, timber and metalChapter 5 of 10 in the section

Rusted metal: surface preparation grade, brushing, anti-rust primer and limits

On an outdoor construction site, painting over residual corrosion dooms the coating system to early failure. This chapter details how to assess the oxidation, carry out effective mechanical rust removal in line with recognised requirements, select the compatible anti-rust primer and formally identify the cases of deterioration where on-site manual or power-tool preparation is no longer sufficient.

Key takeaways

  • So-called adherent rust traps moisture, causing the paint film to detach prematurely within twelve months.
  • Manual or power-tool mechanical brushing achieves, at best, only a very thorough preparation grade.
  • The inhibiting anti-rust primer must be applied within four hours of mechanical rust removal.
  • Flaking corrosion and deep pitting call for abrasive blasting in a workshop, outside the painter's scope of work.

Assessing the ferrous substrate and carrying out mechanical rust removal on site

In exterior renovation work on ironwork, railings or metal soffits, the building painter regularly faces corroded substrates. Considering that compact rust can serve as a base for a modern paint system is a major technical error. The underlying oxidation retains hygroscopic traces and residual salts that continue their electrochemical action beneath the dry film. Blistering and flaking inevitably appear with the next winter cycle.

On-site surface preparation grade
Level of visual cleanliness obtained by manual or light mechanical means, assessed by comparison with reference photographs showing the removal of mill scale, loose rust and deteriorated old coatings.

On a finishing work construction site, abrasive blast cleaning is rarely feasible, for obvious reasons of containment, dust emissions and access. The tradesperson must therefore use suitable hand tools and power tools to reach the highest conventional cleanliness level possible, generally described as very thorough brushing.

Cleanliness levels achievable on site depending on the tools used
Tool usedActual mechanical actionVisual result obtainedOperational limit
Triangular scraper and hand brushChipping off coarse scale and scrapingSurface partly bared, embedded rust visibleLow output, ineffective on black rust
Angle grinder with rotary wire brushTearing off the oxidised surface layersMetallic appearance with a risk of superficial burnishingTends to close the pores without removing the oxide
Non-woven silicon carbide abrasive discAbrasion without excessive heating of the substrateUniformly bright bare metal with the roughness retainedRapid wear on sharp edges and rivets
Pneumatic needle scalerHammering to knock off mill scale and crustsEffective spot removal in recesses and weldsHigh noise level and significant vibration

The recurring pitfall of brushing with a rotary wire brush on a grinder is the polishing of the rust: the steel wires crush the oxide without removing it, creating a deceptive shine that prevents any subsequent mechanical key. The work must always finish with careful dust removal by industrial vacuum, followed by degreasing with a non-greasy solvent.

Applying the anti-rust primer system and formalising the limits of the substrate

Mechanical rust removal leaves reactive metal exposed to the weather. Ambient outdoor humidity triggers flash rust within a few hours. The anti-rust priming coat must be applied the same day, on a clean, dry, dust-free substrate. The choice of primer depends on the residual condition of the iron and on chemical compatibility with the intended finishing coats.

  1. Final dust removal and degreasingRemove all grinding dust with a clean cloth soaked in cleaning thinner, taking care not to spread a greasy film.
  2. Applying the inhibiting anti-corrosion coatApply by brush a high-build primer rich in zinc phosphates or inhibiting pigments, paying particular attention to edges and weld beads.
  3. Observing recoating timesWait until the coat is fully dry, in accordance with the manufacturer's technical instructions, before applying the intermediate and the satin or gloss finishing coats.

The painter must know the limits of the service provided. Where the metal shows penetrating flaking corrosion, a reduction in cross-section or a massive presence of deep pitting that cannot be cleaned out with power tools, the durability of the paint system can no longer be guaranteed. Under the usual rules of the Code of Obligations on defects in material supplied by the client, the tradesperson must formally notify the principal or the client that on-site treatment is only a stopgap, or require the element to be removed for complete blasting and metal coating in a specialised workshop belonging to the metal construction trade.

Treating complex assemblies and applying barrier coats

On exterior metalwork such as railings, wrought-iron grilles or metal shutters, rust never develops uniformly. The electrochemical initiation points are systematically concentrated in water-retaining areas: overlaps of flat bars, gusset plates, rivet holes and the feet of posts set in mortar. The building painter faces a major physical constraint here: rotary brushing or deburring tools cannot reach gaps narrower than two millimetres. Trying to conceal these gaps without prior neutralisation guarantees failure of the paint film with the next winter cycle.

Once the anti-corrosion primer formulated with epoxy or urethane alkyd resins has cured, the painter must build up a sufficient dry film thickness to slow the diffusion of oxygen and water vapour. The intermediate coat plays this role of physical screen. The addition of a lamellar pigment, such as micaceous iron oxide, creates a flaked stack that considerably lengthens the tortuous path water must follow to reach the base metal.

Manual application system on a rusted ferrous structure prepared on the construction site
System stageRecommended binder typeMinimum dry film thicknessTechnical role on the construction site
Local impregnation coatPenetrating alkyd or two-component epoxy25 to 35 micronsWetting of the micro-cavities of pitting and blocking of residual oxidation that cannot be removed.
General anti-corrosion primerSynthetic resin loaded with inhibiting pigments50 to 60 micronsGalvanic or chemical passivation of the steel bared during mechanical brushing.
Intermediate coatUrethane alkyd with micaceous iron oxide40 to 50 micronsBarrier effect against moisture, ultraviolet protection and mechanical reinforcement of the film.
Decorative finishGloss or satin exterior alkyd enamel35 to 45 micronsSurface sealing, resistance to rain washing and colour stability.

Behaviour of rust under the film and scope of on-site intervention

Leaving an oxidation spot under a film-forming system causes what chemists call underfilm or filiform corrosion. Residual mill scale and iron oxide have a nobler electrochemical potential than sound metallic iron. In the presence of the traces of moisture inherent in preparation on an outdoor construction site, a galvanic micro-cell is activated under the paint. This phenomenon produces gas release and a volume swelling of the rust that can reach six times the volume of the original metal. The mechanical stress inexorably lifts the film, even the most flexible, within a period of six to eighteen months.

  1. Visual check for the onset of blisteringLocating micro-blisters on sharp edges and around screw heads, indicating loss of film adhesion through expansion of the oxide.
  2. Testing residual adhesionCross-cut incision with a blade to check whether the film lifts in rigid flakes or retains a plastic bond with the metal.
  3. Spot exposure and assessment of the substrateManual scraping to measure the depth of the rust crater and determine whether a loss of metal cross-section compromises the structure.
  4. Informing the site managementSending a notice of defect stating that manual on-site rust removal has reached its physical limits and that workshop blasting has become imperative.

To cost a complete repaint of exterior metal elements with thorough mechanical rust removal, degreasing and a three-coat system, the labour and materials budget is of the order of CHF 45 to 80 per linear metre for a simple grille. For quantity-surveying details or the estimating of complex ornamental work, refer to specialised costing scales.

Managing non-conformities and limits of on-site intervention

On an exterior renovation construction site, the painter regularly encounters metalwork whose deterioration exceeds what manual or power-tool treatment can deal with. Where the corrosive attack is accompanied by detachment of residual mill scale, deep flaking or pronounced craters, the combined action of the scraper, wire brush and angle grinder cannot clean the substrate lastingly. Trying to seal this oxidation under an anti-rust primer inevitably leads to blistering under the film within twelve months, under the action of trapped residual moisture and interstitial oxygen.

  • Immediate finding of perforation or structural thinning: stop the rust removal and give notice of the impairment of the structure's mechanical strength.
  • Presence of lamellar oxidation that cannot be reached in gaps, overlaps and sheet pinch points: record the impossibility of achieving the specified preparation grade.
  • Powdery rust dust persisting after brushing: do not apply directly, and proceed with degreasing followed by dust removal under vacuum extraction.
  • Site management refuses repairs by localised blasting: formalise in writing the reservations on adhesion and corrosion protection before applying the system.

Faced with a ferrous substrate corroded beyond the grade admissible for thorough manual or mechanical preparation, the foreman applies the rules of the trade. In accordance with standard SIA 118, the company informs the site management in writing of the defects found and of the unsuitability of the substrate before starting the painting. If the client nevertheless requires the finishing coats to be applied without blasting or replacement of the element, the painter declines all responsibility for the performance of the anti-rust system and for any subsequent filiform corrosion.

Frequently asked questions

Can mechanical brushing be replaced by a chemical rust converter?

No. A chemical converter does not penetrate thick mill scale or flaking rust. It transforms only a very thin superficial oxidation film. Applying such a product to an unbrushed substrate creates an unstable, brittle crust that compromises the adhesion of the anti-rust primer and causes massive detachment outdoors.

How should riveted or bolted assemblies that cannot be accessed on a balustrade be treated?

Non-dismountable contact areas concentrate moisture by capillarity. The painter clears the surrounding areas with a triangular scraper, removes the cracked mill scale with a rotary brush, removes dust carefully, then applies a rich, penetrating anti-rust primer. A polyurethane sealant compatible with exterior paints then seals the joint to prevent any water infiltration.

What is the maximum interval between brushing the metal and applying the primer?

On an outdoor construction site, the primer is applied the same day, within three to six hours of rust removal. The relative humidity of the air causes almost immediate flash oxidation on bare steel. If a yellow or rust colouring reappears before the protective coat is applied, complete re-brushing is absolutely required.

What should be done if corrosion has reduced the metal cross-section of a railing?

The painter must immediately stop all preparation on the affected area. A loss of material exceeding one third of the original thickness compromises the stability of the structure and the safety of users. The problem falls to the metalwork fabricator. The painter issues a formal notice of non-conformity to the site management.

Texts and standards cited

  • norme SIA 118General conditions for the execution of construction work