Skip to content
Website
🧱 CFC 272Wall coverings: wallpaper and wall hangingsChapter 6 of 10 in the section

Corners: cut-through internal corner, wrapped external corner, and the wall that is out of plumb

In this chapter, the painter learns to get round internal and external corners without creases or lifting, by neutralising out-of-plumb structural work. You will be able to split the drop in the internal angle, mark a new vertical reference line with a plumb line and make clean returns on new or old masonry.

Key takeaways

  • A continuous drop in an internal corner will inevitably crease as soon as the wall deviates from the vertical.
  • Splitting the drop in the corner with a twenty-millimetre return guarantees a joint free of mechanical tension.
  • Every start on a new wall face requires a plumb reference line to be marked out rigorously.
  • On an external corner, the paper wraps round the arris by at least twenty millimetres before the next drop is hung.

Splitting the drop at the internal corner and systematically re-establishing plumb

Trying to make a full drop follow an internal corner in one piece is the most common technical error in wallpapering. Even in recent construction, masonry walls or light partitions have execution tolerances that depart from perfect verticality. As soon as the corner drifts by even five millimetres over the ceiling height, paper hung continuously is subjected to mechanical twisting. Two immediate defects appear: either the drop forms a hollow "bowstring" in the angle, refusing to adhere at the bottom, or it blisters and produces diagonal creases that cannot be worked out with a spatula or pressing roller.

  1. Measuring widths and splitting the approach dropMeasure the distance between the edge of the last drop hung and the internal corner at three heights: top, middle and bottom. Take the largest measurement and always add 20 to 25 mm to form the return flap. Cut the drop lengthwise to this exact dimension on the pasting table.
  2. Hanging and setting into the angleHang the first part of the drop alongside the previous drop, edge to edge. Smooth the flat surface towards the corner to expel air. Mark the bottom of the angle carefully with a conical corner roller or the back of the paperhanger's scissors, without piercing the paste-soaked paper.
  3. Folding back the flap and trimmingFold the 20 mm surplus back onto the adjoining wall. If the out-of-plumb condition creates an excessive or irregular overlap towards the top or bottom, even out this return with a metal rule and a cutter to keep a regular strip of about 15 to 20 mm, perfectly pressed into the bottom of the angle.
  4. Marking a new reference lineNever start from the edge of the cut return to hang the next drop. On the adjacent wall, measure the width of the remaining offcut of the drop (original total width minus the usable width of the first part hung). Transfer this measurement from the bottom of the corner, subtracting 5 mm to create a slight overlap, then mark a perfectly vertical line with a plumb line or laser level.
  5. Hanging the offcut and making the joinApply paste to the wall or the offcut depending on the type of substrate. Align the outer edge of the offcut with the plumb line just marked. The inner edge thus overlaps the 15 to 20 mm flap folded back in the previous step, compensating for the out-of-plumb corner without any tensile stress.

For thick coverings, heavy vinyls or high-weight non-woven papers, simply overlapping two thicknesses in the corner can create a visible ridge or one prone to later lifting. In this specific case, the painter makes a double cut: after overlapping the offcut onto the folded-back flap by about 20 mm, cut through both layers at once with a cutter fitted with a new blade, guided by a wide corner spatula. Remove the two residual strips, apply a bead of seam adhesive if necessary, then press the tight joint down with a flat roller.

The external corner and handling distorted walls in renovation

On an external arris, the most common defect results from cutting edge to edge exactly on the sharp arris. Daily rubbing, passing traffic or light knocks inevitably end up fraying the edge and lifting the covering. The drop must go round the corner and stop on the secondary face. This principle requires the cut to be planned in advance, leaving a minimal, stable and firmly pasted return.

Corner-turning techniques according to profile and type of covering
ConfigurationMaterial appliedRecommended return allowanceFitting operation
Standard internal cornerOrdinary wallpaper or non-woven15 to 20 mm on adjoining wallSimple overlap of the offcut aligned on the plumb line
Irregular internal cornerSolid vinyl or heavy non-woven25 to 30 mm on adjoining wallDouble cut with corner cutter and edge-to-edge bonding
Straight external cornerStandard paper or vinyl20 to 25 mm around the arrisWrapping round, tight pressing and start of the next drop on plumb
Distorted external corner (old)Glass-fibre cloth or textile covering30 to 50 mm around the arrisFine cuts at the bottom and top to absorb the curvature of the wall

In old buildings in French-speaking Switzerland — whether village houses in mixed masonry or town buildings with plaster and lime renders — external corners are rarely straight. They frequently show bulges, worn rounding or significant warping. When wrapping a bulging corner, the paper tends to split or gape at the curve. To release the tension without distorting the pattern on the main face, make slight horizontal cuts with scissors in the return flap, at the top against the cornice and at the bottom level with the skirting.

When the external corner is fitted with a metal angle bead with excess thickness poorly made good by the previous trades, report this geometric defect immediately to the site management. If hanging must continue as is, applying a reinforced dispersion adhesive or a special border adhesive on the return area prevents any lifting caused by the lack of absorption of the metal beneath.

Plumb drift and mastering the split at an internal corner

In recent buildings as in traditional construction, interior wall arrises almost never have rigorous verticality. When a painter tries to run a continuous drop across an internal corner, the three-dimensional distortion of the angle immediately produces diagonal creases and lifting under tension. Since textile or cellulose material does not have the elasticity required to follow a helical broken line, systematically splitting the covering is the only lasting technical solution. This operation requires a longitudinal cut of the incoming drop, a calibrated overlap in the bottom of the angle and the marking of a new guiding plumb line on the adjacent wall.

Execution starts by measuring the gap between the edge of the last plumb drop and the internal corner. This distance must be taken at a minimum of three points: at the top under the ceiling, in the centre at mid-height of a person, and at the bottom level with the skirting. The largest of the three measurements is used as the base, to which the painter adds a regular allowance of between fifteen and twenty millimetres. This section of drop is then cut on the pasting table or directly at the wall, then pressed towards the bottom of the angle. This overhang compensates for the out-of-plumb corner without creating uncontrolled build-up on the second wall.

  1. Taking measurements and cuttingMeasure the distance between the edge of the last drop hung and the bottom of the angle at the top, middle and bottom. Add 20 mm to the widest dimension found to cut the first strip.
  2. Pressing and tightening the angleApply the pasted strip against the previous drop with butt joints, then press towards the bottom of the angle using a corner roller or a flexible spatula to press the 15 to 20 mm return firmly onto the next wall.
  3. Setting out the new plumb lineOn the new wall, measure the nominal width of the next drop less 5 to 10 mm from the bottom of the angle, then mark a strictly vertical line with a laser level or heavy plumb line.
  4. Overlap and trimming to fitHang the new drop, setting its outer edge exactly on the plumb line. The inner edge then overlaps the previous return in the angle, eliminating any risk of drift across the whole room.

External corners and the peculiarities of old buildings

The treatment of external corners responds to physical constraints opposite to those of internal corners, but shares the same need for splitting as soon as the out-of-plumb condition exceeds the usual visual tolerances. On a sharp arris, a drop must never stop exactly on the arris: rubbing, mechanical tearing and repeated cleaning would inevitably lift the edge of the paper. The proven method is to take the covering round the corner with a minimal, carefully pressed return, on which the next drop ends after an evening-up cut.

Execution parameters for corners according to wall type
Geometric configurationRequired return on the arrisRecommended cutting methodPlumb reference required
Standard internal corner15 to 20 mm on the adjoining wallStraight cut on the table before hangingPlumb line marked for each new wall
Square external corner25 to 30 mm beyond the sharp arrisDouble cut with cutter on stainless steel ruleVerticality check on both faces
Old building with severe out-of-plumb30 to 40 mm with cuts at points of tensionDouble cut after overlappingComplete re-setting of the axis with laser
Rounded arris or deteriorated plaster20 mm on blocking primerClean trimming after partial dryingTraditional plumb line, damped

In old buildings in French-speaking Switzerland, whether refurbished farmhouses or early twentieth-century apartment buildings, walls show pronounced bulges, render swelling and considerable corner skews. The plumb drift can reach several centimetres over a storey height. In these configurations, the return at an external corner must be slightly increased to absorb the irregularity of the substrate without exposing the final cut to direct view. As soon as the drop goes round the arris, small transverse cuts of a few millimetres in the upper and lower edge release the residual tensions.

The flatness requirement and the acceptance limits of the substrate are defined by standard SIA 257. Where the misalignments or the general curvature of the corner exceed the deviations provided for by the rules of the trade, the painter reports the defect to the site management in accordance with the contractor's duties under standard SIA 118. Work may only continue after agreement on the final tolerances accepted by the client, the role of the hanging being to neutralise optically the out-of-square conditions through rigorous setting out and invisible cuts.

Remedial protocols and handling critical drift at corners

On a renovation site, the appearance of a hollow crease, a gap or a pattern offset in a corner almost always signals the same error: the attempt to follow the angle with a continuous drop. When the substrate deviates from the vertical, forcing a non-woven or vinyl strip into the corner creates immediate diagonal tension. The material refuses to lie flat, swells into an air blister that cannot be worked out or twists onto the next wall. If the defect is noticed during pasting, the reaction must be immediate: split the drop with a cutter along the arris before the paste grabs.

  1. Emergency splitting and pressing downCut the drop in the bottom of the angle with a new blade guided by a smoothing spatula. Fold the corner section back onto the starting wall, pressing it firmly down to the bottom. The residual offcut on the adjacent wall is removed.
  2. Repositioning with a plumb lineNever restart from the bevelled offcut left by the defective corner. Mark a new vertical line with a plumb line or laser on the arrival wall, offset by the exact width of the drop less 5 millimetres.
  3. Overlap and reinforced bondingHang the new drop set rigorously on the plumb reference. Let the inner edge end in the internal corner, overlapping the tongue from the previous wall. On waterproof coverings, apply a vinyl border adhesive to prevent spontaneous lifting of the overlap.
  4. Double cut on thick coveringsFor heavy textures where the build-up remains visible, cut through both superimposed thicknesses at once 3 millimetres from the arris with a metal rule. Remove the two offcut strips and press the edges back edge to edge with a seam roller.

Frequently asked questions

How should you react to an internal corner whose plumb drifts by more than 30 millimetres?

Continuity of the drop is ruled out. The tradesperson cuts the drop so that it runs only 5 to 10 millimetres onto the adjacent face. On this second wall, a complete new vertical plumb line is marked with a plumb line, from which the next drop is aligned in a direct overlap. The pattern offset is thus absorbed at the bottom of the fold without generating any tension in the material.

Why does wallpaper split in the internal corner several days after hanging?

This mechanical defect occurs when a drop goes round the angle in one piece without being split. As it dries, the paste shrinks and the paper tightens like a bowstring as it pulls out of the bottom of the angle. At the first thermo-hygrometric variation or vibration of the building, the excessive tension tears the wall covering over its full height along the internal arris.

Which adhesive should be used for overlapping a corner return on heavy vinyl?

Standard cellulose adhesive for non-woven does not bond to the plasticised or closed surface of a vinyl wall covering. When splitting at an internal corner with an overlap of a few millimetres, a bead of special border and seam adhesive in pure acrylic emulsion must be applied, then the edge pressed down with a conical roller to secure the joint.

On an out-of-plumb external corner, what minimum return width must be kept?

The minimum return on the adjoining wall must never be less than 20 millimetres, the technical ideal being between 25 and 30 millimetres. A narrower strip frays, offers no mechanical grip and lifts under frequent traffic. After turning the arris, the next drop is fitted by double cut or hung on the reset plumb line.

Texts and standards cited

  • norme SIA 118General conditions for the execution of construction work relating to notices of defects in the substrate and notifications of geometric anomalies.

In the same section