Interior paint systems: selection and application: the execution reference
This section is aimed at team leaders, foremen and site managers who must specify and carry out interior painting work in compliance with SIA 257. It details the essential technical sequence between substrate preparation, the application of a suitable primer, the intermediate coat and the choice of finishing film. It guides you in eliminating visible touch-ups, controlling saturated colours and securing damp rooms without compromising profitability.
- 10chapters
- 22 000words
- 6sections in the training course
- 60chapters in total
Key values to remember 4
5 °C
Minimum ambient air and substrate temperature for the application of dispersion paints
80 %
Maximum relative air humidity permitted during interior painting
3 %
Maximum moisture content by mass of a plaster to allow the application of a system
21 %
Maximum oxygen content by volume required to preserve indoor air quality
Scope of work of the interior painter and construction site interfaces
The role of the building painter (CFC 272) is to build up a durable, protective and aesthetic film-forming system on a stabilised substrate. The painter's task is not to correct defects in plumbness, overall flatness or structural hollows attributable to the structural work or to lightweight partitions. According to the recognised rules of the art and SIA 257, the painting contractor takes over a substrate prepared by other trades, in particular the plasterer (CFC 271). If a surface shows unevenness or a roughness outside the tolerance for the agreed level of requirement, the contractor applies the duty to notify under art. 365 CO para. 3 before any painting is carried out, without taking the plasterer's place for heavy reprofiling of the walls.
| Trade / CFC | Sole responsibility of the third-party trade | Painter's take-over point (CFC 272) |
|---|---|---|
| Plastering and staff (CFC 271) | Overall flatness, joint tapes, complete plasters and agreed surface levels | Cohesion check, light sanding to remove loose grains, consolidation of substrates by impregnation |
| Screeds and floors (CFC 281) | CM moisture measurement for screed acceptance, self-levelling floor smoothing compounds | Indicative moisture test to refuse or approve installation on skirting boards or thresholds |
| Parquet floors (CFC 283) | Sanding of the wood, impregnating oil treatment and varnishing of floors | Airtight protection of the boards when painting the walls |
| Facades and ETICS (CFC 221) | Installation of external thermal insulation, reinforcement and base facade renders | Refresher paint on existing renders without reworking the insulation |
Likewise, the structural anti-corrosion protection of load-bearing beams and columns is the responsibility of the metal construction contractor (CFC 215). The interior painter treats radiators, exposed secondary pipework and metal door frames for interior distribution. On each element, the preliminary analysis of the surface condition determines the mechanical and chemical adhesion of the whole system.
Execution method: logical progression of the ten chapters
The success of an interior painting job depends on strict compliance with the application chain. To guarantee a result that is beyond dispute at the acceptance of the work, the technical chapters must be learned in a sequential, site-based order, from the compatibility of chemical formulas through to the final handover of the walls.
- 1. Master the complete system and the tools (O2-01 to O2-03)The applicator selects a consistent range from a single manufacturer to prevent conflicting chemical reactions. They adapt the roller sleeve, spray nozzle or brush bristle to control the film tension and avoid patchiness requiring touch-ups.
- 2. Adapt the formulas to physical constraints (O2-04 to O2-07)Each substrate has its own rules: waterproofing and scrub resistance in wet rooms, tinted intermediate coats to support saturated bright colours, tannin blocking on woodwork and heat resistance on heating systems.
- 3. Secure critical surfaces and the occupied environment (O2-08 to O2-10)Managing raking light on ceilings requires a deep matt finish without tension. The construction site requires rigorous prior masking and the technical refusal of partial touch-ups in favour of treating complete wall sections.
By following this technical path, the execution teams limit recurring damage: blistering on a blocked substrate, softening of an old alkaline substrate or visual defects visible under the overhead light of glazed bays.
📘 Chapters in this section 10
Thinking in systems: primer, intermediate coat, finish coat and the same manufacturer
Secure adhesion by locking in the chemical compatibility between primer and finish within a single certified range.
Interior paint systems: selection and applicationHiding power, flashing and lap marks: working wet on wet and finishing the wall
Eliminate roller marks and patchiness by matching your working pace to the open time.
Interior paint systems: selection and applicationThe tool determines the finish: roller, airless spray gun, brush and the expected appearance
Select the optimal application equipment to balance speed of application and final texture without unnecessary overconsumption.
Interior paint systems: selection and applicationWet rooms: washable paint, cleaning resistance and limits against water
Prevent blistering and mould with scrubbable films formulated for frequent exposure to water.
Interior paint systems: selection and applicationDeep colours: number of coats, tinted undercoat and colour durability
Achieve perfect colour depth from the second coat thanks to an intermediate coat tinted to a similar shade.
Interior paint systems: selection and applicationInterior woodwork: sanding, bleeding knots and brush-mark-free lacquer
Block tannin and resin bleed-through to achieve an interior lacquer as smooth as a mirror.
Interior paint systems: selection and applicationPainting a radiator: cold substrate, heat-resistant product and yellowing
Stop thermal yellowing and peeling at once by applying heat-resistant resins on cooled metal.
Interior paint systems: selection and applicationThe ceiling: direction of application, raking light from a glazed opening and a deep matt appearance
Banish application shadows under raking light with deep matt paints formulated to need no touch-ups.
Interior paint systems: selection and applicationMask before opening the tin: floors, joinery, furniture and condition report
Protect adjacent work and save decisive cleaning time thanks to prior airtight sheeting.
Interior paint systems: selection and applicationThe impossible touch-up: patching an old wall, aged shade and the whole wall
Defend technically the painting of a complete wall section against complaints about a visible localised touch-up.