Key takeaways
- The ladder is used only as a means of access or as a work position for a brief task with no lateral force.
- A fall from one metre fifty frequently results in serious injuries and lasting disabilities.
- The support angle of a single ladder must strictly follow the one-in-four slope, i.e. approximately seventy degrees.
- The mobile individual platform is a better replacement for the stepladder for cutting in and for ceiling application.
Strict tolerance for ladders and stepladders: the conditions imposed on the construction site
In the finishing and wall-covering trades, the stepladder and the single ladder have long been the reflex equipment for reaching ceilings, transoms and the tops of box sections. This habit sustains a major accident risk. According to SUVA statistics, a considerable proportion of disabling occupational falls occur less than two metres above the ground. At a height of one metre fifty, impact on a raw slab or tiling produces calcaneus fractures, head injuries and ligament tears of the shoulder whose severity equals that of accidents on heavy scaffolding.
For a painter to be legally allowed to carry out an application task from a stepladder or portable ladder, four cumulative conditions must be met without exception:
- Nature and duration of the task: the task must be of minimal duration, not exceeding a few consecutive minutes, such as an isolated touch-up of a skim-coat filler repair or a localised brush retouch.
- Low mechanical effort: the movement must generate no lateral thrust likely to destabilise the stiles, which rules out firm sanding with an abrasive pad or vigorous smoothing of a glass-fibre cloth.
- Maintaining points of support: the painter must keep three solid points of contact with the equipment at all times, which in theory makes two-handed work with a tray and roller impossible.
- Limited working height: the operator's feet must never go above the last rungs or the top platform where it has no complete guardrail.
The stability of the equipment depends on precise geometric parameters. For a single leaning ladder, the setting angle must be between 70 and 75 degrees to the horizontal, corresponding to the one-quarter rule: the distance from the foot of the ladder to the wall is a quarter of the extended length. The stiles must rest on a level, non-slip floor, clear of debris or loose protective sheeting, and the top must extend at least one metre above the landing level when used as a passage. For the stepladder, the spreader and the restraint straps must be fully locked before any climb.
Adopting the individual platform to make painting and wall covering safe
As soon as a painting operation involves a continuous pass, handling a short pole, regular dipping into a paint pot or hanging a wall-covering drop, use of the conventional stepladder is prohibited. The proven technical answer on Swiss construction sites is the light mobile individual platform, commonly referred to as PIR or PIRL depending on its working height. This equipment provides a stable, enclosed work position that frees both of the tradesperson's hands entirely while eliminating the risk of tipping over.
| Operational criterion | Conventional stepladder | Individual platform |
|---|---|---|
| Fall protection | None (no guardrail) | Full (top rails, mid-rails, integrated toe boards) |
| Foot standing area | Narrow steps or small landing | Spacious non-slip platform |
| Permissible lateral force | Almost none, otherwise it will slip | Absorbed by the geometry and the stabilisers |
| Duration of standing | Very brief tasks only | Ergonomic position for continuous cycles |
| Movement on the floor of a storey | Permanent manual carrying | Retractable castors under load |
Integrating individual platforms into painting teams changes the organisation of the mobile workshop. Made of light aluminium alloy, this equipment folds to pass through standard door openings of 80 or 90 centimetres and is easily carried in a medium-sized van. Telescopic models allow the platform height to be adjusted in 25-centimetre steps, ensuring an ideal application height for rolling a ceiling without neck strain or harmful lumbar extension.
- Checking the ground the platform will stand onCheck that the surface is level, sweep away laitance or plaster dust and make sure that no cardboard protective sheet slides under the pads or castors.
- Deployment and mechanical lockingOpen the structure, engage the metal spreaders until they click positively into place and set the lateral stabilisers if the platform height exceeds one metre.
- Access and closing the guardrailClimb the non-slip access stairs, step onto the work platform and be sure to close the safety gate or the rear rail before picking up the roller.
The foreman ensures that no platform is moved with a painter or open buckets on the platform. Although setting up this equipment takes one extra minute when unpacking compared with an old wooden stepladder, the productivity gain when cutting in and the calmness of the movement more than compensate for this set-up, while guaranteeing strict compliance with the safety directives in force in Switzerland.
The four tolerance criteria and the rules for setting up on the construction site
On a finishing-work construction site, the ladder and the stepladder are not permanent work positions, but temporary means of access or equipment reserved for short-duration tasks. The Suva guidelines and the ordinance on construction work regularly remind us that a fall from a modest working height, even one metre fifty above finished floor level, causes irreversible bodily injuries: wrist fractures, head injuries or ligament avulsions. For the painter, the risk is aggravated by the nature of the professional movements, which often involve the upper body stretching towards the ceiling or the returns of reveals.
Work on a ladder or stepladder is tolerated only when four cumulative conditions are scrupulously met. The first concerns duration: the task must be occasional and not exceed a few minutes per position, without prolonged accumulation over half a day. The second requires a total absence of significant lateral forces, excluding heavy mechanical sanding, vigorous scraping of old lacquers with a knife or hanging thick wall coverings under tension. The third condition requires permanent maintenance of three points of contact with the equipment when climbing and descending, as well as a stable frontal support while working. The fourth requires that the standing height never exposes the feet to an elevation without a guardrail that could cause a loss of balance into the void.
| Technical parameter | Requirement on site | Direct risk in case of failure |
|---|---|---|
| Support slope | One-quarter ratio of the usable height, i.e. an angle close to 70 degrees | Base sliding backwards or tipping by lifting off at the top |
| Type of ground | Level, load-bearing, dust-free surface, free of loose unsecured sheeting | Loss of grip of the feet, differential punching or lateral slipping |
| Extension above the top | Stiles extending at least one metre above the access level at the top of the work | Loss of grip at the delicate moment of stepping onto the upper landing |
| Spreading device | Rigid metal spreader and restraint straps locked on the stepladder | Sudden collapse under the painter's weight or asymmetrical imbalance |
Deploying mobile individual platforms and phasing the work
The mobile individual platform, whether compact or foldable for cramped construction sites, is the preferred material means of replacing the ladder and stepladder for applying paints and hanging wallpaper. Unlike the narrow steps of a ladder, its platform of at least forty by fifty centimetres offers full support for both feet. It incorporates a rigid guardrail fitted with a top rail, a mid-rail and a toe board, completed by an automatic gate or a closing chain that protects the painter through three hundred and sixty degrees.
- A sturdy tool holder to hold the lacquer tray, roller sleeves and cutting-in brushes without encumbering the hands when climbing.
- Quick-deploy retractable stabilisers to neutralise the risk of tipping as soon as the platform height exceeds one metre.
- Travel wheels fitted with an automatic braking system or positive lock as soon as the painter's load is applied to the platform.
- Folding system allowing free passage through interior door frames of eighty centimetres without complete dismantling.
Integrating this light equipment favourably changes the phasing of the painting construction site. When treating ceilings and wall friezes, the painter has both hands free to hold the short pole, load the roller or guide the strip of non-woven backing. The productivity gains quickly offset the initial investment: the marked reduction in muscle fatigue at the ankles and calves allows a steady pace to be maintained, while removing the micro-stoppages caused by the constant instability felt on a ladder rung.
Arbitration in case of non-compliance, refusal of a work position and safety inspection
During a construction site inspection carried out by Suva or the cantonal labour inspectorate, the use of a single ladder or a stepladder to roll a ceiling or hang glass fibre systematically leads to work being stopped. The OTConst states unequivocally that the ladder is above all a means of passage and may serve as a work position only for very occasional tasks, without significant physical strain. Faced with orders to speed up from the works management on an unsecured position, the foreman applies the precautionary principle: he stops the exposed area and records the incident the same day in the construction site log.
- Recognise that the operation is incompatibleExamine the nature of the task and its execution schedule. If the task goes beyond a simple touch-up of a few minutes or requires sustained application force, the use of the ladder or stepladder must be ruled out in favour of a stable work platform.
- Check stability and support angleFor the rare meticulous touch-ups that are permitted, ensure a load-bearing, dry floor free of debris. The straight ladder requires a support angle of 70 degrees, locked non-slip feet and securing at the top. The painter never works beyond the safety rungs prescribed by the manufacturer.
- Replace the access with an individual platformIf the stability criteria cannot be guaranteed, have a mobile individual platform or a foldable room scaffolding brought in. Report this logistical need in writing to the works management to justify adapting the means of access and to ensure continuity of the finishing work.
A fall from a height of one metre fifty produces spinal injuries and fractures just as incapacitating as a fall from a storey. In confined configurations or in stairwells, the foreman coordinates with the other trades the installation of specialised decking, refusing the use of ladders turned into makeshift trestles, a practice prohibited on all Swiss construction sites.
Frequently asked questions
Can an entire ceiling be painted from a traditional double stepladder?
Use of a double stepladder to paint a complete ceiling is not permitted by the OTConst or by Suva. This operation requires repeated movements above the shoulders, continuous lateral movement and no rear guardrail. The painter must use a mobile individual platform or an interior scaffolding. The stepladder remains reserved for very short local touch-ups requiring no pressing effort.
What angle of inclination must be observed when setting a single ladder against a wall?
A leaning ladder must be set at an angle of inclination between 68 and 75 degrees, the recommended value being 70 degrees. To check this angle without an instrument, place the tips of your shoes against the stiles at the bottom: your elbows must touch the stiles when your arms are stretched out horizontally. The ladder must also extend at least one metre above the upper access level concerned.
What are the employer's obligations when purchasing platforms for the painter?
The employer must provide mobile individual platforms that meet the safety standards in force, fitted with top rails, a mid-rail and a toe board. The equipment must have deployable stabilisers suited to the platform height and wheels fitted with effective brakes. The company must also train painters in assembly, daily visual inspection and the instructions for use set out in the technical manual.
Is it permitted to place a plank between two ladders to create a working bridge?
A makeshift bridge made of a board placed between two double or single ladders is strictly prohibited on Swiss construction sites. This precarious set-up guarantees no horizontal stability, has no fall-arrest device and exposes the tradesperson to a sudden tip-over when loading with paint. Only certified mobile scaffolding with a locked platform, integrated guardrails and base stabilisers is permitted for continuous work along a partition.
Texts and standards cited
- OTConstOrdinance on the safety and health protection of workers in construction work
