Skip to content
Website
🧱 CFC 272Products, VOCs, health and the painter's siteChapter 7 of 10 in the section

Rinsing and leftovers: wash water, containers, and what never goes down the drain

On Swiss construction sites, cleaning paint tools requires a rigorous method to prevent any contamination of the drainage networks. You will learn how to treat wash water using a flocculation settling tank, how to manage residual sludge and how to trace the disposal of soiled packaging and liquid residues under an official special-waste tracking form.

Key takeaways

  • Discharging paint-laden water into drains or clean-water manholes is prohibited.
  • On-site treatment requires a settling tank with flocculating agent and sludge filtration.
  • The OLED requires strict sorting of special waste from the moment it is produced on the painting construction site.
  • Disposal of hazardous residues and solvents requires an official special-waste tracking form.

Ban on discharge into the sewer and treatment of wash water by settling

Washing a roller sleeve or a brush directly under a construction site tap or over an outdoor drain grating is a direct environmental offence. Even when diluted, a water-based dispersion contains synthetic resins, mineral pigments, fungicidal preservatives and coalescing agents that seriously disrupt wastewater treatment plants and suffocate watercourses if discharged into the separate clean-water network. The federal water protection law lays down the strict principle that substances liable to pollute water must not be discharged into public drains without approved pre-treatment.

Flocculation of wash water
A physico-chemical process in which a reactive mineral or organic powder is added to the rinse water to agglomerate the dispersed paint particles into heavy flocs, allowing them to be separated mechanically by settling and filtration.
  1. Prior mechanical wringingBefore any contact with water, always scrape the rollers with a corner knife or a half-moon scraper to return as much pasty material as possible to the original drum.
  2. Closed-circuit washingClean the tools in the upper tank of the workshop or construction site washing station, supplied by a closed-circuit circulation pump or by a restricted water supply.
  3. Reagent dosing and stirringAdd the prescribed dose of flocculating agent and stir the bath vigorously for a few minutes with a mechanical mixer mounted on a drill to start coagulation.
  4. Filtration and settlingLet the mixture rest so that the solids sink to the bottom, then open the lower valve through a specific textile filter that retains the sludge and releases clarified water.

Sludge, soiled containers and traceability under the OLED

The ordinance on the limitation and disposal of waste strictly governs the handling and disposal of construction site residues. For the painter-craftsman, the OLED sets the obligation to separate hazardous waste from other recoverable or combustible fractions. This obligation applies from the work area onwards: mixing leftover solvent-based paint, wet filtration sludge and plastic packaging in the same general-waste skip is a serious breach of professional operating rules.

Classification and disposal channels for workshop and construction site residues
Type of wasteEnvironmental statusRequired packagingFinal disposal channel
Filter cakes and dried sludgeSpecial or controlled wasteSealed leak-proof bags or full-opening drumsIncineration in a specialised plant or approved channel
Leftover liquid water-based or solvent-based paintSpecial wasteOriginal metal drums, hermetically closedThermal treatment plant for special waste
Drained, dry plastic or metal packagingMunicipal or recoverable wasteStacked dry, with no free liquid residueMaterial recycling (metals) or incineration plant
Spent solvents and cellulose thinnersFlammable special wasteSpecific approved containers with earthingRegeneration by distillation or thermal recovery

The transport and handover of these materials to a specialised collection company cannot take place without traceability. The federal ordinance on waste movements requires a tracking form to be issued for special waste each time chemical products, uncured drums or solvents are handed over. This official document states the waste code number, the net quantity, the details of the sender and those of the authorised collection centre. The painter keeps this countersigned copy for the statutory period in order to demonstrate that their practices are fully compliant during cantonal environmental protection audits.

Operating the washing station: mechanical scraping, flocculation and sludge separation

Cleaning paint tools never starts under the tap or the garden hose. Before a single drop of water is used, the painter always carries out a rigorous mechanical scraping phase. Pile rollers, facade-renovation sleeves, cutting-in brushes, airless spray guns and paint transport trolleys contain a significant quantity of liquid product that can still be used or wrung out. The craftsman uses a painter's knife, a curved spatula or an ergonomic scraper to push the lacquer or dispersion back into the original drum or into a mixing bucket. This basic habit makes it possible to recover up to half a litre of paint per large sleeve and reduces by more than half the load of suspended solids that will enter the rinsing cycle of the workshop or construction site.

  1. Dry wringing and drainingScrape each roller vigorously and empty the spray tanks dry. The remaining liquid goes back into its original container if the work continues the next day, or into the collection can for tint bottoms for later neutralisation.
  2. Washing in a closed troughClean the tools in the closed-circuit washing station or in the dedicated retention tray. The water is sprayed at moderate pressure to detach the pigments and acrylic resins without splashing the work area.
  3. Dosing the flocculating productAdd the flocculation powder or the liquid coagulation polymer to the loaded rinse water. Stir the tank energetically with a mixer mounted on a drill for two to three minutes to aggregate the polymer particles.
  4. Filtration through a geotextile basketPour the treated liquid through a pre-filtration basket fitted with a non-woven textile filter. The pigment flocs are trapped on the surface while the clarified water flows by gravity into the lower tank.
  5. Drying and dewatering of sludgeLet the filter bag drain while suspended above the tank. Once the water has drained off, the pasty sludge dries in the open air to form a compact, friable cake, ready for statutory packaging.

Administrative management of residues, buffer storage and the special-waste channel

The management of the painter's construction waste is strictly governed by the ordinance on the limitation and disposal of waste (OLED) and by the ordinance on waste movements (OMoD). Residues from the preparation, application and maintenance of paints can under no circumstances be treated as ordinary household refuse or inert demolition waste. Dewatered sludge from settling tanks, solvent leftovers, drum bottoms of uncured epoxy or polyurethane resins, and wastewater that cannot be treated chemically fall into the category of special waste. The painting contractor has a legal obligation to maintain perfectly secure buffer storage within their depots and to hand over these substances only to carriers or disposal companies holding a cantonal operating permit.

Classification and disposal channels for the painter's workshop and construction site waste
Type of wasteRegulatory status (OLED / OMoD)Collection method and compliant channel
Dried flocculation sludge cakes (aqueous phase)Controlled waste / special wasteIdentified leak-proof bags, storage on a retention tray, disposal via an approved thermal channel
Used cleaning solvents (white spirit, acetone)Flammable and toxic special wasteApproved hermetic metal drums with earthing, incineration in a specialised plant
Soiled plastic or metal packaging that has not been drainedSpecial wasteContainers for hazardous waste, disposal with thermal recovery of the packaging
Metal drums scraped with a spatula, bottom completely dryRecoverable waste (industrial scrap metal)Clean scrap-metal skip or professional recycling centre after verifying complete dryness
Bottoms of polymerised paint with hardener (epoxy, PU)Ordinary waste after complete curingIncineration in a waste-to-energy plant (combustible waste channel)

Any handover of special waste to a third-party collector requires a special-waste tracking form to be drawn up beforehand. This official document certifies the identity of the producer, the precise waste code according to the OMoD, the technical description of the substance, the tonnage handed over and the authorised final recipient. The painter in charge of the construction site or the foreman must keep a signed copy of the form in the company's workshop file. This proof must be immediately available in the event of an inspection by the cantonal environmental services or during environmental compliance audits on public procurement contracts. No illegal disposal, no mixing with plaster or wood skips, and no covert discharge are tolerated by the professional channel.

Accidental spill and network pollution: emergency procedure and traceability

Rinsing tools illegally into a stormwater grating or the failure of a settling tank is a direct harm to the receiving environment. When an incident occurs, the worst mistake is to inject clean water under pressure to try to dilute the mixture: this manoeuvre disperses the pollutant load, saturates the pipes and pushes the residues of binders and synthetic pigments towards the nearest watercourse.

  1. Sealing the manholeImmediately fit a magnetic sealing plate or an inflatable cushion in the downstream collector to stop the soiled fluid from advancing towards the public network.
  2. Containment and absorptionSurround the area with absorbent booms for hydrocarbons and paints, then spread dry mineral binder over the residual liquid sludge to fix the dispersion.
  3. Pumping and packagingPump out the liquid phase retained in the manhole using a construction site sludge vacuum or a sewage tanker, then bag the soiled absorbents in approved drums.
  4. Traceability and notificationNotify the site management and the cantonal environment service, then record the incident with a special-waste tracking form before dispatch to an approved centre.

The management of sludge from mechanical scraping requires complete documentary rigour under the OLED. No drum of dried washing residues or polymerised paint leaves the depot without the appropriate waste code being assigned and the official tracking document being issued. Keeping the disposal forms for five years protects the company during periodic checks by cantonal waste inspectors.

Frequently asked questions

What should be done with wash water after the sludge has been separated at the depot station?

Clarified water from a mechanical flocculation system can be used in a closed circuit for the first cleaning cycles of the following rollers. If the water has to be discharged into the municipal wastewater network, it must strictly comply with the cantonal limit values for turbidity, heavy metals and pH, subject to a formal industrial connection permit issued by the municipality or the canton.

How should empty containers that held water-based paints be disposed of?

A plastic or metal container that is drained and completely dry on the surface can be disposed of in the inert or recoverable combustible waste channel if the film is hardened. However, any container still holding liquid residues, fresh crusts or traces of organic solvents must be labelled as special waste and handed over to an authorised collector with a tracking document compliant with the OLED.

Why is it prohibited to wring out a roller sleeve on natural ground?

Even mineral or water-based paints contain dispersants, fungicides and synthetic polymers that are not biodegradable in the short term. Wringing out onto the soil permanently contaminates the topsoil through infiltration of chemical agents that are toxic to soil micro-organisms. The craftsman must always squeeze their sleeves with a painter's knife directly over the washing tank to concentrate the material before treatment.

What is the company's obligation when settling sludge is removed?

The company must appoint a carrier and a disposal company holding a cantonal permit for the handling of special waste. It first draws up the tracking form with the exact waste code, checks the labelling of the leak-proof containers and keeps the signed copy of the disposal document at its head office. This supporting document attests the lawful handover of the sludge during environmental audits of the construction site.

Texts and standards cited

  • OLEDOrdinance on the limitation and disposal of waste: sorting principles on the construction site, separate disposal of special waste and traceability of hazardous residues.

In the same section