🧱 CFC 272Substrate acceptance and diagnosis before paintingChapter 6 of 10 in the section

Suspect old paint: lead, stripping and protection before scraping

This chapter teaches you to identify the presence of lead in old paint layers before any workshop or site work. You will be able to carry out a rapid screening test, specify suitable containment of the premises, apply wet stripping methods and rule out thermal or dry processes that contaminate dwellings.

Key takeaways

  • Paints applied before the 1960s frequently contain toxic white lead or red lead.
  • Dry scraping and burning off with a blowtorch are strictly prohibited on these substrates.
  • A chemical test with rhodizonate or a laboratory analysis confirms the presence of lead.
  • Stripping requires sealed containment, a wet method and suitable respiratory protective equipment.

Old buildings and lead diagnosis: the inspection protocol before intervention

In the Swiss building stock constructed before the middle of the twentieth century, old oil paints applied to interior woodwork, exterior joinery, cast-iron radiators and window reveals very often contain lead pigments. White lead, or basic lead carbonate, served as an opacifier, and red lead as a major anti-corrosion agent on ferrous metals. Even though the use of lead white was progressively restricted during the last century, successive renovations have routinely painted over these toxic layers without removing them. As soon as a refurbishment operation involves stripping or sanding an old substrate, the painter is exposed to a major risk of lead poisoning through inhalation of microscopic particles or accidental ingestion.

Before attacking any surface with a scraper, a spatula or a mechanical sander, the painter must carry out a systematic check on all buildings constructed before 1960. Two common methods allow this diagnosis to be made in the field: the use of instant chemical reagents, or the taking of paint flakes for spectrophotometric or chemical analysis in a specialised laboratory. In a diagnosis of the whole building, certified diagnosticians often work with a portable X-ray fluorescence analyser, a non-destructive method that penetrates the full thickness of the finishing coats down to the original timber or plaster substrate.

  1. Cut through the paint film down to the substrateMake a clean V-shaped cut with a new-blade utility knife to expose all the successive historical layers, without stopping at the superficial surface layer.
  2. Apply the chemical detection reagentPlace a drop of sodium rhodizonate or sodium sulphide test solution directly on the cross-section of the paint film, observing the reaction time recommended by the manufacturer.
  3. Observe the colour changeObserve the immediate coloration: a dark red or violet-pink shade with rhodizonate, or an intense blackening with sulphide, definitively indicates a dangerous concentration of lead.
  4. Record the result and stop any unprotected workNote the result in the site diary, photograph the reaction mark and inform the site management if the presence of lead was not mentioned in the specifications.

Containing the area, wet method and strict exclusion of dry processes

Once the presence of lead is confirmed, traditional techniques of thermal stripping with a blowtorch, open abrasive blasting and dry scraping are strictly prohibited. Heating lead paint to a high temperature with a heat gun generates highly toxic lead fumes and vapours that pass through ordinary respiratory filters and condense in the ambient air. Likewise, using a scraper or a sander without integrated dust extraction pulverises the material into fine, highly volatile dust. These particles settle on all floors, penetrate period floorboards and permanently contaminate the whole dwelling, making the premises dangerous for later occupants, in particular young children.

Comparison of working methods on old lead paints
Preparation methodStatus on an occupied construction siteHealth and technical risksAccompanying measures
Dry scraping with a scraperProhibitedMassive emission of fine inhalable dustNot tolerated by Suva
Burning off with a flameProhibitedToxic lead vapours and fire riskNot tolerated by Suva
Chemical stripping with gel / pastePermitted and recommendedNo volatile lead dust at allFloor containment and watertight nitrile gloves
Sanding with certified extractionTolerated under conditionsResidues in case of insufficient negative pressureClass H vacuum cleaner and sealed shroud
Wet strippingRecommended on hard substratesFormation of lead-laden sludgeComplete recovery of liquids and residues

The cardinal rule is to keep the material constantly wet in order to block any emission of airborne particles. Applying a chemical stripper in the form of a gel or thick paste softens oil or alkyd paint films without damaging the timber substrate. Once the dwell time has been observed, the painter scrapes off the dampened paste with a spatula, depositing the sludge directly into airtight drums. Where mechanical sanding remains technically unavoidable to dress a rebate or rework a substrate, the tradesperson uses a machine fitted with a sealed extraction shroud connected without interruption to a class H industrial vacuum cleaner equipped with an absolute high-efficiency particulate filter.

Organising the work area requires careful prior containment. The floor of the room is completely covered with a polyethylene sheet at least two hundred microns thick, fixed to the skirting boards with cloth adhesive tape to form a watertight tray. Communicating doors to occupied rooms are sealed with double-flap airlocks or sealed under polythene, and natural or mechanical ventilation openings are blocked to prevent any air depression towards adjacent rooms. The tradesperson wears at all times a disposable particle-tight type 5/6 coverall, waterproof overboots and a half-mask respirator fitted with a P3 filter or a powered air-purifying respirator.

Stripped sludge, soiled adhesive tapes, filter cartridges and containment sheets are special waste within the meaning of the ordinance on the limitation and disposal of waste. These residues must never go into the skip for ordinary bulky construction waste or into household refuse. They are packaged on site in sealed plastic drums approved for hazardous materials, identified by explicit labelling indicating the presence of lead, then removed to an approved treatment channel with a tracking document for special waste being drawn up.

Hazards of lead, prior diagnosis and exclusion of dry techniques

In pre-war buildings and constructions erected before 1950 in French-speaking Switzerland, interior woodwork, reveals, glazing beads, skirting boards and balustrades frequently conceal old layers of white lead (lead carbonate) or red lead. Applied for their opacity and resistance to moisture, these preparations remain inert as long as they are not disturbed. However, uncontrolled mechanical work turns this compact film into invisible ultrafine dust. These particles settle on all surfaces of the dwelling and infiltrate cracks in the floors, permanently contaminating living spaces and exposing occupants and workers to insidious lead poisoning.

Systematic identification of the substrate is essential before any scraping on a suspect building. The painter makes a bevelled cut through all the historical layers down to the bare substrate (timber or plaster), then applies a chemical reagent of sodium sulphide or sodium rhodizonate. An instant colour change reveals the presence of lead compounds. For large construction sites or public procurement, the client calls on a building pollutant diagnostician equipped with an X-ray fluorescence spectrometer, a non-destructive method ensuring an accurate quantification of the contaminated elements.

Comparison of stripping techniques on lead-containing coatings
Stripping techniqueRegulatory statusMain exposure routeControl measures required
Dry rotary or orbital sandingProhibitedAerosolisation of fine inhalable dustNo sufficient technical safeguard indoors
Gas blowtorch or naked flameProhibitedLead vapours and risk of fire in the substrateTotal ban on any combustible substrate
Low-temperature heat gun (< 350 °C)Tolerated under strict conditionsRelease of residual gases and hot blisteringCalibrated electronic control, slot nozzle, A2P3 filter
Chemical stripping with gel / wet methodRecommended methodSkin contact and contaminated sludgeSealed containment, nitrile gloves, P3 masks, sludge collection

Implementing wet stripping, containment and residue management

The wet method is the technical rule accepted by Suva for eliminating airborne dust during stripping. The painter applies with a brush a stripping gel formulated without methylene chloride, in an aqueous or neutral solvent-based phase. The paste is covered with a thin polyethylene film or a barrier paper to slow the evaporation of the active ingredients and lengthen the emulsification time. After reaction, the softened coating is lifted off with a round-edged painter's knife or a triangular scraper, forming a malleable, compact paste that generates no volatile fraction in the room.

The workstation is rigorously contained. The painter lines the floor with a polyethylene film of at least 200 micrometres fixed at the skirting with cloth adhesive tapes. Doors communicating with occupied rooms are sealed, with access through an airlock made of two overlapping plastic flaps. The operator wears a disposable particle-tight type 5/6 coverall closed at the wrists and ankles, smooth washable boots, and a respiratory protective device fitted with a P3 filter or a full-face powered-ventilation mask ensuring a higher protection factor.

  1. Scraping under wet retentionSystematic scraping of pasty sludge and flakes with a wide knife, depositing directly into a sealed container reserved for pollutants, avoiding any contact with the bare floor.
  2. Washing and neutralising the substrateRinsing the woodwork with an abrasive pad soaked in clean water or in the neutralising agent prescribed by the manufacturer, without centrifugal splashing or uncaptured run-off.
  3. Fine cleaning with HEPA filtrationExhaustive vacuuming of the contained enclosure with an industrial vacuum cleaner fitted with class H absolute filtration (EN 1822), followed by wet wiping of the floor.
  4. Packaging and removal (OLED)Folding the sheets inwards without shaking, sealing them in special-waste bags labelled lead and sending them to an approved collection centre in accordance with the ordinance on waste.

Dispersion incident: withdrawal protocol and immediate remediation

In buildings constructed before 1960, the accidental start of dry scraping or the tearing of a containment polythene sheet releases extremely volatile white lead particles. This toxic dust instantly seeps under doors, contaminates adjoining floors and enters ventilation circuits. As soon as the wet protocol is broken or a dry cloud appears, the room must be considered an unsafe zone polluted with lead.

  1. Sealing the contaminated spaceClose the access door hermetically with a plastic sheet and a high-adhesion cloth tape to create a sealed airlock. Immediately seal technical ducts and ventilation openings in order to confine the pollutant to the affected volume only.
  2. Specific vacuuming with absolute filtrationDeploy a class H industrial vacuum cleaner fitted with a certified final filter. Vacuum floors, skirting boards and door frames slowly, working from the back of the room towards the exit, without using a broom, which would put the dust back into suspension.
  3. Wet decontamination washingCarry out a methodical wet clean using disposable sponges and a neutral detergent, using the two-bucket technique so as not to spread the material again. Dispose of the wipes and muddy water in labelled special-waste drums.
  4. Formal notification of the eventInform the site management of the unexpected discovery or of the contamination that has occurred. Require control wipe samples to be taken before any resumption of the painter's preparation work.

Handling a failure on lead paint demands absolute rigour. The ordinance on the prevention of accidents requires the employer to maintain operational measures that preserve the health of the teams. In parallel, the ordinance on construction work prescribes the clean-up of the air and the interruption of work when unexpected hazardous materials are encountered. Sediments and soiled equipment must go to the regulated special-waste channel in accordance with the ordinance on waste, without any discharge into the wastewater network.

Frequently asked questions

How should you react when the chemical screening test turns red on woodwork?

A positive colour reaction confirms the presence of lead in the paint film. You must stop all abrasive mechanical preparation. Report the result to the site management so that the presence of the pollutant is recorded. Change your method in favour of chemical gel stripping with sealed floor containment, or thermal stripping in a low-temperature regulated enclosure combined with certified extraction.

Why are burning off with a blowtorch and a conventional heat gun prohibited?

As soon as lead paint exceeds the threshold of 400 degrees, the heavy metal vaporises into toxic fumes and invisible aerosols. These emissions pass through standard dust masks and saturate the body through lung inhalation. Only infrared thermal systems regulated below 380 degrees are tolerated, because they soften the protective film without volatilising the white lead pigment or creating gases harmful to the tradesperson.

What method should be applied to filter wash water during wet stripping?

Water from rinsing a stripping paste must never enter the municipal sewer system. You must vacuum up the liquid sludge with a dedicated wet extractor, then store it in sealed drums reserved for special waste. Hand these toxic residues over to an approved hazardous-waste treatment company, with an official tracking slip, in accordance with the federal requirements on the disposal of polluting materials.

What protective measures does the ordinance on the prevention of accidents impose on the workshop?

The ordinance on the prevention of accidents requires the employer to install collective and personal protective equipment suited to the risk of lead poisoning. When working on old toxic paints, you must equip painters with category three disposable watertight coveralls, thick nitrile gloves and respiratory masks with P3 cartridges. The company must also arrange the decontamination of tools before they leave the construction site.