🧱 CFC 272Substrate acceptance and diagnosis before paintingChapter 5 of 10 in the section

Mould: treat the cause before the stain, and paint that solves nothing

After this chapter, you will be able to distinguish condensation mould from water ingress, apply the mechanical and chemical method for remediating contaminated plaster, and draft a written warning that releases you from liability when the client refuses to resolve the room's ventilation problem or thermal bridge.

Key takeaways

  • Anti-mould paint masks a stain but never neutralises excessive moisture deep in the substrate.
  • Recurrent condensation reveals a thermal bridge or insufficient ventilation in the room to be remediated.
  • Plaster degraded by mycelium must be stripped before a certified fungicidal solution is applied.
  • The painter notifies their reservations in writing in order to be released from liability for foreseeable fungal recurrences.

Distinguishing condensation from water ingress to stop the growth at its source

Applying a finishing coat over fungal growth without remedying the physical cause guarantees that black stains will return within three to six months. The paint coat forms a temporary sealed film under which the spores continue to colonise as long as water remains available. In the event of recurrent damage, the painter's liability is directly engaged for failure to advise during the preparation of the substrate. The initial diagnosis must absolutely identify the source of the moisture before the roller is even picked up.

Visual and instrumental diagnosis of substrate moisture
ManifestationTypical locationPhysical originRequired preliminary action
Superficial black or greenish pinpoint spotsCeiling corners, window reveals, behind furniture placed flat against wallsCondensation of water vapour on a thermal bridge or insufficient ventilationMeasurement of ambient humidity and check of the ventilation flow rate
Brownish rings with salt efflorescence and blisteringBases of partitions, around a rainwater downpipe, underside of slabLiquid water ingress or capillary rise in the masonryLeak detection and complete drying by site management

Measurement is carried out with a non-destructive capacitive moisture meter or a pin-type device that checks the material's electrical resistance. A mineral substrate or plaster render ready to receive a bonding primer must not exceed the permissible value defined by the rules of the trade. If the indoor air stagnates at too high a relative humidity, water is deposited on cold walls as soon as the surface temperature drops below the dew point.

Eliminating the mycelium in depth and issuing formal contractual reservations

Remediating a substrate contaminated by mould involves a combined action of fungicidal decontamination and mechanical remediation. The painter works only on a dry substrate: working on plaster saturated with water disperses the micro-organisms into occupied rooms. Work over large areas requires strict measures to protect the health of the applicators, in accordance with the Swiss national accident insurance fund's guidelines on biological risks.

  1. Wet fungicidal neutralisationSpray or apply with a sponge a chlorine-free, approved biocidal solution based on quaternary ammonium or isopropyl alcohol. Never brush the substrate dry, to avoid airborne suspension of toxic spores.
  2. Mechanical removal of non-adhering partsAfter the contact time prescribed by the biocide manufacturer, scrape off the friable, stripped or rotten render with a rigid spatula. If the plaster is blackened throughout its thickness, cutting it out is part of the essential preparatory work before any finishing work.
  3. Drying and residual neutralisationRinse with a clean damp cloth and leave to dry until the material's moisture content stabilises. Apply a breathable mineral fixative or an insulating solvent-based primer designed for stubborn soot and moisture stains.
  4. Microporous finishing systemUse a system based on potassium silicate mineral binders or a matt acrylic paint enriched with fungicidal agents for damp rooms, avoiding any sealing, blocking coat.

When the client or their representative refuses to fund the thermal repair, the leak repair or the installation of adequate ventilation, the painting contractor must protect themselves. Under the Code of Obligations governing the contract for work and the provisions of the SIA 118 standard, the tradesperson has a duty to notify their client immediately of substrate defects that compromise the durability of the work. This formal notice takes the form of a detailed written warning.

  • Explicit mention of the moisture readings and the colonised areas observed during the joint inspection record.
  • Reminder of the external physical causes outside the painter's trade, such as the thermal bridge or lack of ventilation.
  • Full release from warranty regarding the reappearance of fungal stains if the cause is not treated.
  • Written notification sent by registered letter or against signature before any finishing application begins.

Curative remediation of the substrate and mechanical removal of contaminated backgrounds

Covering a fungal colony with white paint, even one overdosed with biocides, is a clear defect in workmanship. In the presence of residual or recurrent moisture, the mycelium breaks through the new film within a few weeks, causing blistering, delamination and the reappearance of black efflorescence. The building painter's role is to neutralise the live spores, then to physically remove the degraded organic matter before considering any primer coat.

  1. Surface decontamination by biocidal disinfectionSpray or brush on an approved fungicidal solution based on quaternary ammonium or isopropyl alcohol. Neat bleach is prohibited because residues of chlorine and hygroscopic salts promote future water retention in the masonry. Leave to act for the contact time prescribed in the manufacturer's technical data sheet to destroy the active fungal load without dispersing dry spores into the room.
  2. Mechanical removal of impregnated layersRemove completely any contaminated flexible coverings, glass-fibre cloths or wallpapers. Scrape off the old flaking paints and chalking renders down to the hard mineral substrate. On plasterboard tiles or powdery renders perforated by the mycelium, chip away the altered surface to a depth of a few millimetres using a rigid scraper or a sander connected to a vacuum cleaner of the appropriate dust class.
  3. Final neutralisation and complete dryingReapply a second pass of remediating biocide to the exposed masonry, extending at least 50 centimetres beyond the visible stain to eradicate invisible hyphae. Leave to dry until the substrate's moisture content by mass is compatible with painting work, measured by impedance or the carbide method.
Behaviour of substrates and limits of the painter's intervention in the face of mould
Type of substrateLevel of fungal infestationAction required before paintingFeasibility by the CFC 272 painter
Emulsion paint on sound concreteSuperficial stains without delaminationDecontaminating wash, residual biocide, forced dryingNormal painter's work
Skim coat on friable plasterMycelium embedded in the thickness of the renderComplete scraping of the contaminated render down to the stable substratePreparation by the painter after a quote for restoration
Plasterboard saturated with waterContamination of the gypsum core and the rear paper facingCutting out and complete replacement of the board by the plastererNot feasible: substrate rejected and referred to CFC 271
Masonry wall with active water ingressContinuous fungal growth with saltpetreRepair of the external waterproofing or the pipingNot feasible: work stoppage and notice of defects

Mandatory ventilation, choice of systems and written notification of reservations

The best fungicidal formula never replaces air renewal. A bedroom or bathroom without adequate extraction flow will continue to bring warm, humid air to the dew point on cold ceiling corners. The painter has a professional obligation to treat ventilation and the thermal behaviour of the wall as absolute preconditions for the durability of their work.

  • Check the presence and free passage of the air inlet grilles on new airtight windows.
  • Check that the controlled mechanical extraction is actually working, or prescribe daily airing by fully opening the windows three times a day.
  • Prohibit satin or gloss film-forming solvent-based paints that block water vapour transfer on cold masonry.
  • Steer the remediation system towards mineral paints based on potassium silicate or lime, whose natural alkalinity provides an inhospitable environment for spores without relying on volatile biocides.

The written procedure protects the tradesperson against later disputes. The warning record sets out the moisture values measured, the location of the thermal bridges observed and the precise description of the technical limits of the chosen finishing system. Without this evidence, the warranty on the work applies automatically in the event of a claim, and the painter will bear the full cost of a new intervention.

Dispute, recurrence and refusal to carry out work: how to act on the construction site

When the client or the property management company demands repainting without authorising the prior remediation of the masonry or the thermal correction of the cold bridge, the painter directly engages their contractual warranty. Covering active mycelium with an emulsion paint, even one reinforced with a surface biocide, results in blistering within three months. Faced with an instruction to mask the damage, the company must immediately issue a written notice of defects in the substrate, relying on the duty to inform provided for by the Code of Obligations and the SIA 118 standard. Without an explicit written order maintaining the work at the client's risk, the construction site must be stopped.

  • Measure and record the residual moisture of the substrate by the capacitive or carbide method before any decision to apply.
  • Record the surface temperature and ambient humidity to determine the dew point on cold corners and lintels.
  • Draft a formal notice of reservations specifying the mechanical or thermal origin of the defect and the refusal to guarantee in the absence of lasting ventilation.
  • Propose the minimum curative protocol: wet brushing with fungicidal detergent, removal of contaminated friable areas and complete drying under forced ventilation.

If the damage reappears after handover of the work, the joint moisture record is authoritative. The company thus proves that the growth results from a lack of ventilation by the occupant or from water ingress attributable to the sheet-metal work or the exterior façade, thereby releasing the painter from the cost of a full redo.

Frequently asked questions

Can a mouldy surface be scraped dry with a workshop sander?

No. Dry sanding of mould disperses millions of pathogenic spores into the ambient air and contaminates all the neighbouring rooms. The work requires prior disinfection in a wet environment with a neutral biocide or an ethyl alcohol solution, the wearing of a suitable respirator mask and the use of a hand brush or a vacuum cleaner with an appropriate filtration class to retain fine biological particles.

Does a so-called anti-mould paint remove the need to correct the room's ventilation?

No paint film compensates for a lack of air renewal. The fungicidal additives incorporated into washable wall paints slow surface colonisation, but their active ingredients degrade in the presence of recurrent condensation. If the room's relative humidity regularly exceeds permissible values without mechanical or manual air extraction, the organic biofilm invariably ends up covering the paint film surface.

What should be done if the client refuses the removal of plaster blackened in depth?

Plaster contaminated throughout its thickness loses its mechanical cohesion and constitutes a permanent reservoir of spores. If the client refuses the removal and replacement of the plaster with a remediated render, the painter must record a written notice stating that it is impossible to guarantee the performance of the system. Without this contractual release procedure, the reappearance of the stains will be legally attributed to the applicator.

How can a condensation mark be distinguished from ingress coming from the façade?

Condensation typically appears on thermal bridges, in ceiling corners and around joinery, correlated with surface moisture that fades with depth. Rainwater ingress passes through the masonry: the moisture profile measured with a capacitive or pin tester remains saturated at the core of the material, even when the indoor air is dry and ventilated. It requires the external waterproofing to be repaired.

Texts and standards cited

  • Code des obligationsGeneral rules of the contract for work, notice of defects and the contractor's duty of care.
  • norme SIA 118General conditions for the execution of construction work and management of reservations relating to the substrate.