Skip to content
Website
🧱 CFC 272Products, VOCs, health and the painter's siteChapter 1 of 10 in the section

Working in a closed room: forced ventilation, heavy vapours and limit values

After reading this chapter, you will be able to size and position forced ventilation when applying solvent-based paints in a confined space. You will be able to identify the density of vapours at floor level according to the Chemicals Ordinance, comply with occupational exposure limit values and organise rescue through working in pairs outside the risk zone.

Key takeaways

  • Solvent vapours accumulate at floor level, creating an invisible, asphyxiating and highly flammable layer.
  • Mechanical extraction must absolutely be placed at the lowest point of the closed room being treated.
  • The Suva limit values require continuous fresh-air flushing throughout the entire application phase.
  • Working in a confined space requires an operator outside, ready to intervene without entering the vitiated atmosphere.

Behaviour of solvent vapours in a basement and capture at the low point

When applying polyurethane varnishes, solvent-based epoxy primers or impregnation resins in a basement, the volatile organic compounds released do not disperse evenly through the room. The vapours of butyl acetate, xylene or ethylene glycol ether have a gas density two to four times greater than that of the ambient air. As soon as they evaporate from the fresh film or from open drums, these compounds sink along the walls and settle on the floor slab, creating a concentrated layer that gradually rises from skirting level to the painter's airways.

The Chemicals Ordinance requires prior consultation of the section on physical and chemical properties in the safety data sheet. The density of each solvent governs where the capture zone is located. Forced mechanical extraction must position its capture nozzles at floor level, at a height not exceeding fifteen centimetres from the slab, pointed directly towards the paint application front to trap the solvents as soon as they are first emitted.

Time-weighted average exposure value (TWA)
Maximum average concentration of a chemical substance in the air at the workplace, measured over eight hours, to which a painter can be exposed without any measurable impairment of health, according to the official Suva tables.
Physical characteristics of common solvents in building painting
Common chemical substanceDensity relative to airBehaviour in a windowless roomRequired extraction point
Xylene (mixture of isomers)3.7Rapid settling at floor level, stagnation under skirting boardsLess than 10 cm from the slab
n-Butyl acetate4.0Very dense layer at the low point, risk of backflow up the staircaseDirectly at floor level
Light naphtha solvent3.8Accumulation at floor level with migration towards pitsAt slab level
Industrial ethanol (denatured)1.6Moderate descent, partial mixing at mid-heightLow and middle

Setting up forced ventilation and securing the intervention in pairs

To ensure evacuation without creating a dead zone, the air circuit must provide continuous laminar sweeping through the entire volume. Fresh air must be supplied from a clean, unpolluted area, ideally in the upper part at the entrance of the room, while the extraction unit discharges the vitiated air to the outside, away from any technical re-intake or occupied landing door. In accordance with the requirements of the Ordinance on Construction Work, the quality of breathable air at the place of work requires mechanical renewal of the atmosphere every hour to prevent the toxicity and explosion-risk thresholds from being exceeded.

  1. 1. Surveying air flows and pressure differencesCheck the geometry of the cellar, block off stray transverse passive vents and determine the flow path between the clean air inlet and the polluted zone.
  2. 2. Deploying the ducts and the fan unitInstall an extraction box certified for explosive atmospheres outside or at the outlet of the network. Lay the spiral antistatic flexible duct on the floor as far as the most distant zone.
  3. 3. Checking the airflow primingStart the forced ventilation before any decanting or mixing of product. Check the direction of the draught at the low point using a test smoke or an anemometer.
  4. 4. Starting the applicationAlways work by advancing facing the fresh-air flow, so that the vapours emitted are continuously pushed behind the operator towards the extraction nozzle.

When application is interrupted, the ventilation installation must remain in continuous operation for several tens of minutes to dry the coat and lower the residual solvent concentration below the short-term values defined by federal worker-protection legislation. Drums, roller trays and brushes must be sealed before the mechanical fans are stopped.

Suva limit values and ChemO classification: controlling exposure to solvent vapours

Applying solvent-based coatings in a basement or windowless room exposes the painter to massive concentrations of organic vapours. The Chemicals Ordinance (ChemO) governs the handling of these substances through their safety data sheet. In Switzerland, Suva sets the occupational exposure limit values at workplaces: the time-weighted average exposure value (TWA over eight hours) and the short-term exposure limit value (STEL over fifteen minutes). When applying a polyurethane primer or a solvent-based varnish, the hydrocarbons evaporate quickly. The vapours of xylene, toluene, butyl acetate or white spirit have a density two to four times greater than that of air. These molecules fall back to the floor and accumulate at slab level. In a cellar without natural ventilation, this toxic layer forms an invisible stagnant layer that exceeds the Suva TWA values, even if the breathable air seems healthy at the upper landing.

Physical characteristics and exposure values of common solvents
Common solventVapour density (air = 1)Behaviour in a cellarMeasures according to SDS and Suva
Xylene (mixture)3.7Rapid settling, stagnation as a layer at floor levelTWA monitoring, A2 respiratory protection
Butyl acetate4.0Descent to low points and into dead cornersCompliance with the STEL, continuous forced ventilation
Dearomatised white spirit3.5 to 4.5Accumulation on the slab, slow dispersionCapture at floor level, explosion-proof equipment
Technical acetone2.0Flows downwards and increased flammability riskMonitoring of the explosive limit, low extraction

Compliance with the limit values set by Suva does not rest on personal protective equipment alone. According to the general principles of the Ordinance on the Prevention of Accidents and the Ordinance on Construction Work, collective protection takes priority. An A2P3 filter mask protects the painter against direct inhalation during application, but it does not remove the risk of oxygen depletion or the explosion hazard linked to saturation of the volume. The product's safety data sheet specifies the flash point and the maximum tolerated concentration. If these critical thresholds are exceeded, the construction site must be suspended to adapt the air-renewal system.

Working in pairs and the kinematics of low-level extraction ventilation

In a closed room, working alone is prohibited by the occupational safety rules. The intervention requires clearly coordinated work in pairs. The applicator goes down to carry out the task with a roller or brush, equipped with respiratory protective equipment and suitable protective clothing. The second worker remains permanently outside the polluted zone, on the landing or at the head of the stairs. This lookout maintains continuous visual and voice contact with their colleague. They monitor the proper operation of the ventilation ducts and operate the emergency stops in the event of a failure. They never enter the cellar without autonomous rescue equipment if the applicator feels unwell, so as not to become a second victim of asphyxiation by heavy vapours.

  1. Surveying and positioning the equipmentIdentify the accumulation zones at floor level. Place the explosion-proof fan unit outside the room. Deploy the extraction duct to the lowest point of the cellar.
  2. Prior ventilation and atmosphere testActivate mechanical extraction several minutes before any entry. Check the oxygen content and the wholesomeness of the ambient air using a portable gas detector.
  3. Paced application and permanent monitoringCarry out the application progressing from the back of the room towards the emergency exit. The outside lookout records the durations of presence and ensures regular rotation of personnel.
  4. Maintaining air sweeping during dryingContinue forced ventilation after application until the residual solvents have fully evaporated, as confirmed by a measurement in accordance with the Suva limit values.

The system is dismantled only after the paint film has fully polymerised or dried. Even when spray or roller work is finished, the degassing of the resins continues for several hours. Switching off the ventilation too early recreates a layer of solvents at floor level, dangerous for the other trades working in the building. The end of the intervention involves a final check measurement to make sure that the occupational exposure limit values are complied with before access is reopened to third parties.

Emergency procedure: extraction failure, poisoning and the pair's response

On a painting construction site in a basement or closed cellar, the deterioration of intervention safety occurs abruptly: failure of the extraction fan, a flexible duct crushed on the floor, a smell of solvent detected through the half-mask or the alarm of a multigas detector. The accumulation of dense organic vapours at the low point creates an immediate danger of asphyxiation, neurotoxic poisoning and an explosive atmosphere. At the slightest sensory or technical warning, application operations must be stopped completely.

  1. Stopping work and evacuating immediatelyThe applicator stops spraying or rolling, tightly closes the solvent containers to limit residual emissions and goes back up to the open air without delay. The outside lookout guides the withdrawal and maintains voice guidance.
  2. Rescue discipline and raising the alarm without enteringIf the worker loses consciousness at the bottom of the room, the safety pair must on no account go down without autonomous air-supplied equipment. Attempting an improvised rescue in a pool of heavy vapours exposes the rescuer to instant collapse. The lookout immediately dials 144 and 118, then runs the mechanical extractor at full power to start sweeping the bottom.
  3. Medical care and handing over the SDSsWhen the professional rescue services arrive, the person in charge hands over the safety data sheets of the resins or solvents used, according to the ChemO classification. The evacuated casualty is placed in the recovery position in a non-exposed zone until the medical assessment.

Before considering re-entering the confined space, the painter in charge formally identifies the equipment failure. The filter cartridges for organic vapours are discarded and replaced: any filter that has reached its saturation threshold no longer protects the painter. The flexible extraction duct is inspected over its entire length, repositioned on the floor less than fifteen centimetres from the slab and firmly secured. In accordance with the principles of the OTConst on air quality and with the ordinance on health protection, the site manager carries out a prolonged purge ventilation. Resuming application is strictly conditional on an airflow check showing that the solvent concentration has fallen below the occupational exposure limit values published by Suva.

Frequently asked questions

Why install the extraction opening at floor level rather than in the upper part in a cellar?

The vapours of common solvents, such as hydrocarbons or acetates, have a density two to four times greater than that of the ambient air. They naturally fall towards the floor to form an invisible, flammable toxic layer. An extraction point positioned in the upper part removes only the clean air from the ceiling and leaves these gases stagnating at the ankles and airways of the applicator bent over the substrate.

What precise role must the second painter who stays outside the room play?

The lookout maintains permanent visual or voice communication with the applicator and monitors the electrical supply of the fan. They check that there are no ignition sources near the outside discharge and prohibit access to the room by other trades. In the event of respiratory failure of their colleague, their sole role is to trigger the professional rescue services and over-ventilation, without ever going down themselves into the solvent-saturated zone.

Does a filter mask with cartridges replace forced ventilation of the basement?

No, personal respiratory protective equipment is a complement and not a substitute for the collective technical measures required by the OTConst. An A2P3 cartridge mask protects against residual vapours but prevents neither the accumulation of flammable gases at floor level nor the drop in oxygen level in a closed cellar. Without mechanical capture at the source, the atmosphere quickly reaches the explosive limits and saturates the charcoal filters within a few minutes.

How can you tell whether the Suva exposure limit value is being complied with during the work?

Visual or smell-based estimation is misleading because the nose becomes accustomed and masks the danger. The painter must refer to the safety data sheet according to the ChemO to find the average exposure limit value. On the construction site, only the use of a volatile organic compound detector or strict compliance with the air-renewal rates calculated in relation to the quantity of paint applied can guarantee a healthy atmosphere.

Texts and standards cited

  • OTConstRequirements on air quality at workplaces and on artificial ventilation in confined spaces
  • OPChimChemicals Ordinance governing hazard communication, labelling and safety data sheets

In the same section