🧱 CFC 272Interior paint systems: selection and applicationChapter 9 of 10 in the section

Mask before opening the tin: floors, joinery, furniture and condition report

Before opening the first drum of dispersion paint or enamel, the organisation of the construction site determines whether the job is profitable. This chapter explains how to document the initial condition of the rooms to rule out any dispute with the client, how to choose the right protective coverings for each type of floor, and how to seal joinery without lifting existing substrates when removing tapes.

Key takeaways

  • Systematically document pre-existing damage with dated photographs before handling any tools or equipment.
  • Lay an absorbent felt with a waterproof underside, carefully overlapped, to protect parquet and tiled floors.
  • Adapt the adhesion of the masking tapes to the sensitivity of the substrate and the duration of exposure.
  • Wipe paint splashes off immediately with a damp sponge before the binder sets.

Joint inspection record and securing of sensitive surfaces

Opening a tin of paint without first recording the condition of the premises is a professional fault with heavy financial consequences. When taking over an occupied dwelling or a new-build construction site where other trades have already worked, the painter becomes the presumed party responsible for every scratch, chip or stain visible at the acceptance of the work. Physical protection never starts with laying the felt, but with a methodical visual inspection, smartphone or tablet in hand, carried out in the presence of the client or their representative if the schedule allows.

  1. Photographic survey of initial defectsSystematically photograph varnished or oiled parquet floors, window glazing, natural stone window sills and ironmongery in raking light. Zoom in on existing impacts, placing a millimetre ruler or a coin beside them to give the scale. Immediately archive these time-stamped photos in the company's digital site diary before bringing in so much as a stepladder.
  2. Laying absorbent felt on floorsDo not use lightweight plastic sheeting on floors: it is slippery, tears under mobile scaffolding and creates a destructive condensation effect on fine woods. Roll out a heavy non-woven felt of at least 180 g/m², with a non-slip waterproof membrane on its underside. Cross the strips with a minimum overlap of 10 cm and bridge each joint with a tear-resistant cloth adhesive tape.
  3. Mechanical protection of thresholds and walkwaysDoor thresholds and varnished timber skirting boards suffer the constant rubbing of safety boots and trolley wheels. Reinforce these critical points with dense corrugated cardboard or rigid foam corner profiles. Metal thresholds of sliding doors must be blocked with a plastic filler profile to stop sanding dust entering the guide rails.

Furniture that is not moved must be grouped in the centre of the room to leave a clear perimeter walkway of at least 1 m along the walls. Then cover everything with a polyethylene film at least 40 microns thick, firmly taped at its base to prevent air draughts that lift the sheet during comfort ventilation. Do not place any heavy tool on protected furniture, otherwise the veneers of precious woods will be permanently marked.

Masking techniques and immediate response to splashes

Sealing joinery, door units and technical services requires a rigorous choice of adhesive tape. An overly aggressive adhesive tears the varnish off a timber window when removed, while a tape that is too weak peels off under the weight of a thick paint or the pressure of airless spraying. In addition, on electrical fittings such as sockets and switches, the cover plates must be removed and the mechanisms carefully masked to ensure a clean edge to the finishing coat.

Choice of masking tapes according to the type of interior substrate
Target substrateRecommended adhesive typeMaximum time before removalRisk in case of error
Lacquered timber, wallpaper, delicate substratesLow-tack washi paper (purple)14 to 30 daysTearing off of the existing film or of the substrate
Anodised aluminium, PVC, smooth glassStandard-tack washi paper (yellow/gold)30 to 60 daysSeepage under the edge or baked-on adhesive marks
Raw skirting boards, tiles, metal thresholdsStandard building crepe tape24 to 48 hoursEmbedded adhesive residues insoluble in water

Even with a rigorous method, a drop of paint can escape from the roller or pass through a poorly pressed-down joint. The worker's attitude to this incident determines the profitability of the job: cleaning up a fresh drip takes a few seconds with the right consumables, whereas scraping off dried resin on a porous substrate means hours of work and a complaint from the client.

  • Always keep a bucket of clean water and two clean natural sponges at the workstation, reserved exclusively for immediate wiping.
  • On water-based paints, absorb the splash immediately without spreading it, then rinse with a damp sponge, dabbing gently.
  • On varnished joinery, avoid methylated spirits or nitrocellulose solvents, which would instantly dull the factory varnish.
  • Remove adhesive tapes as soon as the second coat has been applied, while the dispersion film is still flexible, pulling at a steady angle of 45°.
  • Check the skirting boards and glazing edges with a dry microfibre cloth as soon as the masking is removed, to eliminate micro-smears before they fully cross-link.

Continuous protection of floors, thresholds and services: mechanical and waterproof barriers

Opening a drum of paint prematurely on an unsecured construction site exposes the team to damage whose cost quickly exceeds the margin on the job. Protecting horizontal surfaces tolerates no compromise: the repeated passage of personnel, the movement of stepladders and the rolling of light scaffolding turn any loose sheet into a source of perforation or falls. To guarantee absolute watertightness against dripping and moisture transfer, the building painter must put together a protection system suited to the type of existing floor covering. A waterproof tiled floor allows fully impermeable barriers, whereas a recently varnished parquet floor or natural stone requires materials permeable to water vapour to avoid any condensation under the sheet.

Choice of temporary protection systems according to the substrate and mechanical stress
Protective materialMain useMechanical resistanceBehaviour against liquids
Non-woven felt with PE film underneathTiles, dry screeds, old varnished parquetHigh against tool impacts and stepladder feetAbsorbent textile face, waterproof plastic underside
Heavy cardboard in rolls (coated type)Main traffic areas and access corridorsVery high against dragging and rolling of platformsDelays soaking-in but gives way to prolonged puddles
Microporous breathable non-woven membraneNatural stone or moisture-sensitive timber floorsMedium, sufficient for foot traffic with overshoesPermeable to water vapour, blocks emulsion runs
Expanded foam corner profilesMetal door frames, edges of Swiss thresholdsExcellent absorption against impacts from stepsInsensitive to liquids, fixed by elastic clamping

Door thresholds and skirting boards are the areas most exposed to adhesive failure and lateral seepage. Strip joints must always overlap by at least ten centimetres and be covered with a tear-resistant cloth tape. Technical services require similar rigour: sockets and switches without their cover plates receive adhesive strips covering the flush-mounting boxes to prevent micro-droplets from getting in during roller or spray passes. Radiators, convectors and exposed heating pipework are wrapped in a polyethylene sleeve sealed airtight with a low-tack tape, to prevent any splashes onto pre-lacquered metals or thermostatic valves.

Prior photographic record, methodical unmasking and neutralisation of splashes

Before unrolling the first roll of masking tape, the painter carries out a rigorous visual survey of the premises. In the presence of the site foreman or independently, they photograph the room's existing defects: chips on window sills, scratches on glazing, deep scratches on door thresholds and pre-existing stains on parquet floors. These time-stamped photos, archived in the company's digital site diary, are the only material evidence capable of ruling out an end-of-job dispute at the acceptance of the work under standard SIA 118. Heavy furniture that cannot be moved, decorative woodwork and crafted joinery are the subject of an immediate written note if their condition shows structural fragility.

  1. Photograph of initial conditionGeneral shots and close-ups of visible defects on thresholds, skirting boards, glazing and sanitary fittings before any equipment is brought in.
  2. Applying edge stripsManual application of the masking tape in perfect alignment with the cutting line, without excessive tension to avoid lifting at corners.
  3. Pressing down the edgesContinuous pressure with a plastic spatula or the thumb to remove air bubbles and prevent paint passing under the adhesive.
  4. Unmasking at a sharp angleRemoving the tape as soon as the film begins to set on the surface, pulling steadily at an angle of 45 degrees to shear the film.

When the construction site work is finished, the protections are removed by folding the strips of felt and plastic film inwards, so as to trap sanding dust and dry flakes. The sorting of these soiled consumables must comply with the recovery channels required by the waste ordinance, separating recyclable plastic films from composite synthetic textiles. An area unmasked methodically hands back an impeccable construction site, eliminates unproductive hours of scraping and confirms the quality of the craftsmanship to the site management.

Handling masking damage: tear-offs, seepage and disputes

On the construction site, a masking incident occurs in two forms: paint seeping under the tape and the substrate being torn off when the tape is removed. Faced with seepage onto a parquet floor or lacquer torn off joinery, haste makes the damage worse. Any mechanical scraping of a hardened drop cuts into the original varnish, turning a superficial clean-up into a complete refurbishment at the company's expense.

  1. Stop unmasking and record the incidentStop removing the tape at the first sign of the substrate peeling. Take clear photographs, wide and close-up, with a millimetre ruler, before any handling or abrasive cleaning attempt.
  2. Comparison with the prior condition recordCompare the photos with the photographic record made before the work. This file shows whether the scratches, paint chips or stains on thresholds, skirting boards and glazing were already present before the protections were laid.
  3. Formal notification to the site managementSend a detailed notice to the site management in accordance with the procedures of standard SIA 118. Describe the nature of the damage, delimit the affected measured quantities and submit a technical proposal for restoration.
  4. Targeted restoration according to the substrateFor a dry splash, soften the binder with a cloth soaked in lukewarm water or ethyl alcohol. For delamination, trim the edges of the break with a scalpel, apply a suitable primer and carry out a localised touch-up.

Cover of damage by professional civil liability insurance depends on demonstrating that the work was carried out in accordance with the rules of the trade. The painter must be able to provide the technical data sheet of the adhesive tape used, certify that the maximum interior adhesion time was strictly observed and produce the photographs taken before the first tin was opened. If the tear-off results from poor internal cohesion of the old underlying coats, this complete technical file protects the company against abusive claims demanding the full replacement of costly fittings.

Frequently asked questions

Which adhesive tape should be used to avoid tearing off the existing paint when unmasking?

For delicate substrates such as old paints, wallpapers or lacquers, use a low-tack washi paper masking tape, known as low adhesion. Standard crepe tapes have too strong an adhesive power, which delaminates fragile substrates. Be sure to remove the tape slowly at an angle of 45 degrees, before the finishing film has dried completely, while observing the maximum application time prescribed.

How can a varnished parquet floor be protected effectively without risking staining the timber?

On a varnished parquet floor, lay an absorbent felt backed with a waterproof polyethylene sheet on the underside, with the non-woven face upwards to retain runs. Avoid plain plastic films, which trap condensation or cause slipping. Fix the strips together with a wide adhesive, but never stick a strong adhesive directly onto varnished timber; prefer a specific parquet tape that removes without residue.

What should be done immediately if acrylic paint splashes onto tiles or a window?

Wipe the splash off immediately with a damp sponge or a clean microfibre cloth soaked in lukewarm water, without spreading the stain. A fresh dispersion dissolves without mechanical effort. If the drop has begun to polymerise, wet it for a long time to soften the water-based film before gently lifting it with a window squeegee fitted with a new blade held flat, without rubbing with a scratching abrasive pad.

Why is the photographic condition record essential before masking?

The joint inspection record in photographs fixes the situation of the existing work before any handling of ladders, scaffolding or paint tins. It documents with precision the pre-existing scratches on glazing, knocks on skirting boards or scratches on parquet floors. In the event of a dispute at the acceptance of the work, these time-stamped images shared with the site management are the material evidence that clears you of responsibility.

Texts and standards cited

  • norme SIA 118General conditions for the execution of construction work