Key takeaways
- Mechanical preparation by shot blasting or planing must remove the surface laitance from the concrete.
- Polyurethane or polyurethane-cement resins absorb thermal shocks and resist de-icing salts.
- Broadcasting calibrated quartz to excess guarantees the anti-slip class on an external ramp.
- Observing the curing time prevents the coating from being torn off by the hot tyres of heavy vehicles.
Preparing the concrete substrate against the combined attack of salt, frost and hot tyres
An external garage ramp is subjected to a combination of destructive stresses: chloride-laden water from de-icing salts, repeated freeze-thaw cycles in winter, and the hot tear-off effect caused by the braking and manoeuvring of tyres. Applying a simple film of floor paint without deep keying inevitably leads to peeling in sheets from the first winter. The painter must work on a sound slab, free of laitance, engine oil or curing compounds.
Surface preparation excludes any chemical treatment with hydrochloric acid, which contaminates the substrate with chlorides and risks corroding the passive reinforcement. Opening the pores of the concrete requires an abrasive mechanical method. Closed-circuit steel-shot blasting is the reference technique on flat or gently sloping surfaces: it strips the surface laitance without fracturing the underlying aggregates, creating a uniform rough texture. For steep slopes inaccessible to heavy shot-blasting machines, aggressive coarse-grit diamond grinding or mechanical planing makes it possible to obtain the required roughness.
Before any local levelling work or application of the primer, the painter checks the residual moisture of the concrete. A value above 4 % measured by the calcium carbide (CM) method requires stopping work on the construction site or interposing a specific epoxy vapour barrier for damp substrates. Industrial vacuum dust removal immediately after the mechanical operation eliminates the residual particles that would prevent the bonding primer from wetting the substrate properly.
Applying the anti-slip system and controlling the return to traffic
On an external ramp, purely epoxy rigid systems prove too brittle against the temperature swings of the Alps and the Jura. A build-up based on flexible polyurethane, polyurethane-cement or methacrylate (PMMA) resins is preferred. These formulations retain their elasticity at low temperatures, bridge the microcracks of the concrete substrate and resist saline solutions chemically. The base coat is applied with a notched squeegee, then de-aerated with a spiked roller to ensure an even thickness.
- Applying the adhesion primerImpregnation of the shot-blasted concrete with a solvent-free two-component epoxy resin, ensuring deep anchoring in the open capillary network.
- Body coat and broadcasting to excessApplication of the intermediate polyurethane or PMMA coat, immediately followed by broadcasting to excess of oven-dried quartz sand with a grain size of 0.4 to 0.8 mm or 0.7 to 1.2 mm depending on the gradient.
- Sweeping off the excess and sealingAfter hardening, complete vacuuming of the unbonded quartz, then roller application of a UV-resistant polyurethane sealing coat.
| Floor configuration | Quartz grain size | Quartz consumption | Target slip-resistance class |
|---|---|---|---|
| Flat interior garage floor | 0.2 to 0.5 mm | 2.0 to 3.0 kg/m² | R10 to R11 |
| Covered access ramp (moderate slope) | 0.4 to 0.8 mm | 3.5 to 4.5 kg/m² | R11 to R12 |
| External ramp exposed to the weather | 0.7 to 1.2 mm | 4.5 to 6.0 kg/m² | R12 to R13 |
Managing the hardening times determines the durability of the work. While PMMA resins allow full traffic after only two to three hours, conventional polyurethane and epoxy systems require strict precautions. At an ambient and substrate temperature of 15 °C, pedestrian access is generally possible after 24 hours. By contrast, passage of light vehicles requires a minimum of three days, and heavy traffic or maximum exposure to hydrocarbons and salts requires seven full days of chemical cross-linking. In autumn, a night-time drop in temperature below 10 °C considerably slows curing and requires the traffic ban to be extended, otherwise the coating will fail prematurely.
Treating critical junctions and special points of the ramp
On a drive-over access ramp or the slab of an underground car park, the failure of a synthetic coating almost always begins at the mechanical interfaces. The shear stresses caused by the turning of the driving wheels and the repeated impacts of vehicles combine with the percolation of chloride-laden water along the edges. The applicator painter must treat each transition with absolute geometric rigour before starting the general application.
Grated channels, sectional door thresholds and kerbs form sharp breaks in the slab. To prevent the resin film from flaking under the tangential stresses of traffic, a mechanical relief chase is mandatory. This groove, cut with a diamond-blade saw and then cleared out with a flat chisel, must be 8 to 10 mm deep and wide. It receives the poured body coat so as to form a continuous anchoring key, protected from direct impact.
| Special point | Mechanical profiling | Reinforcement or sealing system | Finish and surfacing |
|---|---|---|---|
| Contraction joint | Chamfering of edges at 45° | Closed-cell polyethylene backing rod and polyurethane sealant | Sealant flush with the top level of the broadcast quartz |
| Dynamic expansion joint | Forming a recess for a metal profile | Flexible sealing strip bonded with reinforced epoxy resin | Mechanical cover plate suited to heavy traffic |
| Floor channel connection | Anchoring chase parallel, 20 mm from the profile | Non-shrink resin sealing mortar | Broadcasting of silicon carbide to excess at the edge |
| Skirting upstand (min. 15 cm) | Forming a coved corner fillet (25 mm radius) | Glass fabric embedded between the primer and the resin mortar | Waterproof, UV-resistant aliphatic polyurethane finish |
Through expansion joints must under no circumstances be rigidly bridged by a painted floor system. If the resin is applied continuously over the gap of a structural joint, the absorption of thermal movement causes the build-up to tear immediately under winter frost. The painter rigorously carries the axis of the joint through into the coating, installs a backing rod sized to accept a minimum deformation of 25 %, then injects a hydrocarbon-resistant elastomeric sealant.
Diagnosis of service damage and preventive maintenance
The severe environment of a ramp combines three destructive attacks: brine deposited by vehicle chassis, abrasion from the spinning of loaded wheels and heat transmitted by the rubber of tyres in contact. Maintaining the anti-slip performance and the corrosion protection of the metal reinforcement of the structural work depends on an annual visual inspection and targeted interventions before the underlying concrete is corroded by chlorides.
Osmotic blistering is one of the most frequent defects in basements. It occurs when residual moisture under gas pressure remains trapped beneath an impermeable polyurethane or epoxy membrane. Soluble salts create a liquid concentration under the waterproof film, lifting circular blisters filled with pressurised water. Repair requires opening the blister, grinding the substrate down to dense concrete, chemically removing the salts, applying a moisture-barrier primer compatible with damp substrates, then rebuilding the anti-slip matrix.
- Checking for fouling of the aggregates: hydrocarbon residues and tyre rubber clog the surface roughness, dangerously lowering the adhesion coefficient in the rain.
- Hot-water high-pressure washing: periodic cleaning at 60 °C under 100 bar with a neutral biodegradable emulsifying detergent to dislodge the greasy film without attacking the polyurethane binder.
- Measuring wear of the sealing coat: checking the coating of the aggregate; if the quartz tips whiten or are torn out, a translucent aliphatic sealing coat must be reapplied without delay to fix the mineral skeleton again.
- Monitoring the joint edges: removing trapped chippings that prevent free expansion and cause the edges to chip under the weight of wheels.
For the detailed pricing of a localised repair of a resin floor, the measurement per linear metre of chases or the installation of a chemical-resistant sealant, the quantity surveyor will refer to the specialised tenders modules. The durability of the ramp build-up depends entirely on how quickly localised defects are sealed before the onset of the frost period.
Managing adhesion defects and technical repair protocol
On an external ramp or an underground car park access, the combined stresses of mechanical traction forces on starting, de-icing salts and thermal shocks sometimes cause premature failures: osmotic blistering, tear-off under the tread of hot tyres or loss of shear adhesion. Faced with a confirmed defect, a simple local levelling or an overlay is bound to fail. The repair requires a structured protocol to identify the exact failure plane and neutralise the chemical pollutants.
- Coring and pull-off adhesion testDetermine whether the failure is cohesive within the body of the concrete or adhesive at the primer-substrate interface. Using a pull-off tester on bonded metal dollies makes it possible to measure the residual tear-off force of the substrate and to document objectively the state of surface degradation in front of the site management.
- Mechanical removal and elimination of pollutantsDelimit the area with a clean saw cut at least two millimetres deep. Remove all the compromised resin and the laitance by planing, shot blasting or diamond grinding connected to an industrial vacuum cleaner. Remove fine dust and encrusted salts by brushing and meticulous dust removal.
- Rebuilding the anti-slip systemApply a two-component epoxy primer tolerant of the residual moisture of the substrate. Broadcast calibrated quartz to excess to rebuild the required rough texture. After complete curing and sweeping off the excess unbonded grain, apply the polyurethane or epoxy finish coat resistant to abrasion and hydrocarbons.
In the event of a dispute over the origin of the damage, contractual management must follow the rules of standard SIA 118 for the notification of notices of defects and technical findings. The construction site manager records the moisture values, the substrate temperature in relation to the dew point and the pull-off tests in a written joint inspection record, thereby separating an intrinsic defect of the structural work from an execution problem by the painter.
Frequently asked questions
Why does the paint on a ramp often blister after the first winter?
Winter blistering results mainly from osmotic pressure or from water vapour trapped under the resin film. Vehicles carry snow laden with de-icing salts. These chlorides penetrate the microcracks of the concrete. Without mechanical preparation removing the laitance or a primer suited to damp substrates, water migrates under the impermeable coating, freezes, and detaches the film under the mechanical action of the tyres.
What quartz grain size should be chosen to ensure the anti-slip roughness of an external ramp?
For a heavily used external ramp, oven-dried quartz sand with a grain size between 0.4 and 0.8 millimetres is generally used, or 0.7 to 1.2 millimetres depending on the slope. The quartz is broadcast to excess into the still-fresh primer or intermediate coat. After hardening and vacuuming of the surplus, the finish coat seals the grains without drowning the texture, guaranteeing the required anti-slip effect in the rain.
What is the minimum delay before allowing vehicles onto fresh resin?
Pedestrian traffic is often possible after twenty-four hours at 20 °C, but returning the floor to vehicle traffic absolutely requires full hardening right through, i.e. three to seven days depending on the binder chemistry (epoxy or polyurethane). Opening too early exposes the floor to plasticisation: hot tyres tear off the resin while it is still incompletely cured. In cold weather, these drying times must be significantly extended.
Why rule out simple high-pressure washing before applying a coating on concrete?
The high-pressure washer cleans surface dirt but does not open the porosity of the concrete and does not remove the friable surface laitance. Moreover, it saturates the substrate with water, which prevents optimal bonding of reactive resins. Only mechanical preparation by shot blasting or planing removes the non-adherent layer, creates a rough anchoring profile and provides the mechanical cohesion needed to resist shear stresses.
Texts and standards cited
- SIA 118General conditions for the execution of construction work
