Key takeaways
- Each coat fulfils a specific physical function to ensure the adhesion and durability of the protective film.
- Applying products from the same manufacturer ensures absolute chemical compatibility between the successive paint films.
- Mixing brands transfers full responsibility for defects to the applicator and voids the manufacturer's factory warranty.
- SIA 257 sets out the rules of the trade for the composition and execution of paint systems.
Building up the paint film: the inseparable role of each coat
In building painting, a lasting result never relies on the application of a single product, but on the methodical construction of a multi-coat build-up. SIA 257 precisely defines the requirements applicable to painting work and sets the principles for matching the substrate to the chosen system. Producing careful work means treating the whole dry film as an integrated structure, in which each layer fulfils a defined physical and chemical task.
- Paint system
- A coordinated set of successive coats comprising the base preparations, the sealer or primer, the intermediate coat(s) and the finish coat, designed to work together mechanically and chemically on a given substrate.
| System layer | Main function | Rheological and chemical properties | Risk in case of failure |
|---|---|---|---|
| Primer or sealer | Porosity control and anchoring | High wettability, low viscosity, penetrating resins | Chalking, flaking in sheets, patchy absorption |
| Intermediate coat | Opacity, build and transition | High solids loading, evening out of the texture | Ghosting of repairs, insufficient overall film thickness |
| Finish coat | Mechanical resistance and final appearance | High binder concentration, washability, UV stability | Premature burnishing, soiling, sensitivity to impact |
The primer penetrates the capillaries of the substrate to create a direct adhesion bridge. The intermediate coat provides the required opacity and absorbs shrinkage stresses. The finish coat, for its part, protects against external attack while delivering the agreed gloss level. Altering or omitting any of these steps upsets the distribution of internal stresses in the dry film. When the hardness of an upper coat exceeds that of the underlying substrate, the risk of crazing or spontaneous detachment increases under the effect of variations in ambient humidity.
Mixing brands and system warranty: manufacturer compatibility rules
The habit of combining a cheap primer from manufacturer A with a well-regarded finish coat from manufacturer B is the leading source of technical disputes on Swiss construction sites. Even if two products claim a similar base, such as a water-based acrylic dispersion, their coalescing additives, wetting agents and surface tension values differ substantially. Contact between two dissimilar chemistries can cause an immediate or delayed loss of adhesion between coats.
From a legal and contractual standpoint, the use of mixed brands results in the outright cancellation of the suppliers' technical support and factory warranties. In the event of flaking or blistering, each manufacturer called to the site denies responsibility by attributing the damage to incompatibility with the competitor's product. Under the Code of Obligations governing the contract for work, the contractor is directly liable for defects in the work caused by an inadequate choice of materials. The tradesperson then bears all the costs of remedial work, including complete mechanical stripping, re-priming and repainting.
- Selecting the build-up from the overall technical data sheetConsult the system brochures validated by a single Swiss manufacturer, specifying the recommended primer and finish coat for the target substrate.
- Checking the technical data sheetsCheck that the minimum and maximum recoating times between the planned coats match, to avoid trapping solvents or moisture.
- Requesting written confirmation for sensitive worksOn large construction sites or critical substrates, have the manufacturer's regional technical adviser validate the suitability of the chosen system.
- Traceability in the site diaryRecord batch numbers, application temperatures and ambient humidity meticulously to preserve the warranty claim.
Strict alignment on a single unified system not only guarantees chemical compatibility certified in the laboratory, but also makes it possible to hold the supplier jointly liable if a defect inherent in the product should occur. Compliance with SIA 257 requires this discipline in the choice of products, protecting the company against disproportionate remedial costs.
Contractual specification and chemical consistency according to SIA 257
On Swiss construction sites subject to the rules of the trade, SIA 257 governs the execution of painting work and sets the technical framework for systems applied indoors. The painting contractor does not simply sell tins of dispersion or enamel applied one after another: they apply a build-up of bonded films whose durability depends on microscopic compatibility. Choosing a complete system from a single manufacturer meets a strict chemical requirement. The impregnating resins, intermediate binders and finish fillers are formulated to polymerise together, ensuring a consistent gradient of flexibility and mechanical stress from the mineral plaster to the exposed surface.
| System layer | Specific functional role | Coordinated formulation | Risk if brands are mixed |
|---|---|---|---|
| Base coat (primer) | Consolidating the substrate, neutralising salts, evening out porosity | Penetrating acrylic or silicate resins with fine particles | Residual chalk preventing mechanical keying, early blistering |
| Intermediate coat | Base opacity, elastic continuity, absorption of stresses | Pigment and filler content calibrated to the primer's binder | Differential shrinkage stresses, microcracking or crazing |
| Finish coat | Aesthetic appearance, wet abrasion resistance, washability | Copolymers compatible with the underlying solvents and coalescing agents | Softening of the substrate, flaking in sheets, loss of gloss |
The overall cohesion of the build-up relies on the transmission of physical stresses. If a primer has too little elasticity compared with a high-build finish rich in flexible acrylic binder, internal thermal and hygrometric stresses cause shearing at the interface. By specifying a set from the same laboratory, the foreman ensures that the drying times between coats, the re-emulsification indices and the coefficients of linear expansion work together, avoiding the residual stresses that destroy adhesion after a few heating cycles in the building.
Manufacturer's system warranty and handling of defects in the work
In the event of flaking, crazing or detachment of an interior paint, the client turns to the applicator. The painter then calls on the supplier's technical service to trigger the product liability insurance. However, the system warranty granted by Swiss paint manufacturers is strictly conditional on compliance with an exclusive chain of products. If the technical representative finds during the inspection that the impregnating primer comes from a third-party brand, the file is closed on the spot for non-compliance with the application instructions. The contractor alone bears all the costs of removal, sanding and remedial work.
- Checking the substrate and choosing the system data sheetBefore ordering any materials, check the alkalinity and porosity of the surface. Select the complete range from the same supplier, checking that the specified primer is expressly listed on the technical data sheet of the finish coat.
- Keeping the site diary and batch traceabilityRecord the manufacturing numbers of each tin of primer, undercoat and enamel or dispersion. Note the thermo-hygrometric conditions of application in order to prove compliance with the ranges prescribed by the manufacturer.
- Taking control samplesKeep unmixed portions of each product in labelled, sealed containers until acceptance of the work without reservation according to SIA 118.
- Joint investigation in the event of damageIn the presence of detachment, have a cross-cut or pull-off test carried out in the presence of the manufacturer's consulting engineer to show that the failure does not stem from a defect inherent in the complete build-up.
For the manufacturer's warranty to protect the painting company, the technical file must demonstrate an unbroken chain of application. This cover does not only include free replacement of the defective goods; the insurance agreements of the major manufacturers also compensate the labour hours needed for mechanical stripping and complete reapplication of the affected surfaces. Taking the risk of combining a cheap base coat with a premium finish destroys this legal security and transfers the financial risk directly onto the company's balance sheet.
Adhesion failure and detachment: expert-assessment protocol and remediation
When widespread blistering, film detachment or wrinkling occurs on painted surfaces, the painter's response must immediately follow a rigorous procedure. The first step is to suspend application and call in the site management for a joint inspection record, in accordance with the general rules for painting work of SIA 257. The painter also invites the paint manufacturer's technical adviser to examine the build-up in place.
The expert assessment of the work requires precise material investigations to locate the failure plane. The expert or technician carries out cross-cut tests according to the standards in force and takes micrographic sections from samples cut with a scalpel. The analysis shows whether the failure is cohesive within the plaster or levelling coat, or adhesive between the primer and the intermediate coat, or even between two coats from incompatible formulations.
When the company's liability is engaged for breaking the consistency of the system, remedial work tolerates no superficial compromise. Simple sanding or overcoating is doomed to fail because of the shrinkage stresses of the new coats. The technical protocol requires complete removal of the offending film by heat stripping, scraping or heavy mechanical sanding with integrated dust extraction down to the original substrate.
After returning to the bare substrate and careful dust removal, a complete system certified by a single supplier is reapplied methodically. The foreman meticulously records the technical data sheets, batch numbers, ambient humidity levels and intermediate drying times in the site diary to guarantee the final compliance of the work according to SIA 118.
Frequently asked questions
How should you react if the architect demands on site a finish coat from a different brand to the primer already applied?
The painter must formally refuse this change or give written notice of risk to the site management before any work. Under SIA 257, the potential incompatibility of the binders releases both manufacturers from their adhesion warranty. The tradesperson confirms by letter that technical responsibility will lie exclusively with the specifier if the latter maintains the instruction without joint written validation from the suppliers.
What conditions does the manufacturer impose to honour the warranty on its paint system?
The manufacturer requires absolute compliance with the chain of its formulated products, from the sealer to the finish coat. Application must strictly match the technical data sheets: measured substrate moisture content, ambient temperatures, air humidity and recoating times. Manufacturing batch numbers must be kept. Any unprescribed addition of thinner or third-party additive results in immediate invalidity of the system warranty.
Does the universal primer make it possible to bypass the single-manufacturer rule for finish coats?
No. Even if labelled "universal", this primer does not remove the need for brand consistency on construction sites governed by SIA 257. Its formulation guarantees adhesion on varied substrates such as concrete, plaster or wood, but in no way chemical compatibility with a competitor's finish paint. In the event of detachment, the absence of a complete system tested in the laboratory by a single manufacturer blocks any amicable recourse.
Why do a primer and a finish coat from different brands sometimes peel off after several months?
Internal drying stresses and the difference in elasticity between two dissimilar resins cause continuous shear stresses at the interface of the films. Incompatibility of residual solvents or plasticisers can also prevent normal coalescence of the upper film. Under the effect of variations in humidity or temperature in interior rooms, this structural weakness, invisible at acceptance, leads to delayed mechanical failure and then to blistering.
Texts and standards cited
- SIA 257General rules for interior painting, varnishing and wall covering work
- SIA 118General conditions for the execution of construction work and handling of defects