Ventilated cladding: framework, air cavity and fixings: the execution reference

Intended for team leaders, foremen and site managers in building envelope work, this section brings together the Swiss rules of the trade for building durable ventilated façades. From continuous ventilation of the air cavity to fire stops, including setting out the layout and adjusting the framework on brackets, it details the installation procedures in accordance with SIA 232/2 and SIA 331, without straying into the metal load-bearing structure.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

art. 26 OTConst

3 m

Fall height from which façade scaffolding becomes mandatory

norme SIA 232/2

20 mm

Minimum clear thickness of the ventilated air cavity behind the cladding

norme SIA 232/2

50 cm²

Minimum air inlet and outlet cross-section per linear metre of façade

art. 22 OTConst

100 cm

Minimum height of the top rail of a perimeter guardrail

Technical scope and delimitation of the façade builder's trade

The ventilated façade is a double-skin envelope system in which the external cladding protects the thermal insulation from direct weather, while an upward air flow removes residual moisture from condensation or accidental infiltration. The façade builder (CFC 221) sets out the brackets, fixes the secondary framework in timber or aluminium, installs the thermal insulation with rigour, ensures the continuity of the air cavity and fits the applied claddings. This area of work directly meets the requirements of SIA 232/2 for ventilation and water drainage, as well as SIA 331 for the waterproofing connections to the window and door joinery.

On the construction site, the durability of ventilated cladding depends on the rigorous management of three barriers: wind and air tightness on the warm or insulation side, continuous ventilation behind the cladding, and drainage to the outside without standing water. Any misalignment of the framework or crushing of the insulation immediately compromises the thermal draught and exposes the walls to damage from trapped moisture.

Installation method and execution sequence on the construction site

To ensure the work complies and to avoid structural defects, the façade builder's work follows a strict sequence. Each step depends on the millimetre precision of the previous one, from checking the raw substrate to the final fixing of the claddings.

  1. Airflow sizing and adjustment of the framework planeSetting out begins by checking the air inlet and outlet cross-section in accordance with SIA 232/2. The fixing brackets are then anchored with plugs into the masonry or concrete, absorbing out-of-plumb deviations in the structural work by means of slotted holes and thermal shims.
  2. Choice of claddings, expansion joints and special detailsThe layout of the timber battens or aluminium profiles includes the fixed and sliding points needed to channel the thermal expansion of the panels. Lintels, window sills and internal and external corners are treated with perforated ventilated profiles that avoid any break in the air flow.
  3. Fire safety and lifting devicesHorizontal fire stops, whether thermo-reactive or sheet metal, are installed in accordance with the VKF/AEAI fire protection directives. Handling heavy fibre-cement elements or metal cassettes requires certified suction-cup lifting beams, coordinated with the safe use of mobile elevating work platforms.
Functional requirements by installation stage
Building elementControl parameterRisk in case of non-compliance
Cladding basePerforated rodent-proof grilleBlocked air flow and intrusion of pests
Façade bracketsThermal break insertedLocalised thermal bridge and internal condensation
Vertical profilesAlternating fixed hole and slotted holesBuckling of the framework due to thermal expansion
Joinery connectionVapour-permeable sealing stripWater infiltration into the reveal insulation

📘 Chapters in this section 10

Ventilated cladding: framing, air gap and fixings

Air cavity of a cladding: inlet and outlet area and obstacles that block it

Ensure optimal thermal draught without letting insects or rodents colonise your insulation.

Ventilated cladding: framing, air gap and fixings

Secondary framing: adjustable brackets, battens and compensation for the substrate

Compensate for out-of-plumb deviations in the structural work with adjustable, thermally decoupled and perfectly stable brackets.

Ventilated cladding: framing, air gap and fixings

Timber cladding: species, treatment, and weathering to grey accepted or counteracted

Anticipate the natural ageing of the timber to avoid unsightly ghosting under the eaves.

Ventilated cladding: framing, air gap and fixings

Fixing the cladding: exposed screws or clips, and the expansion gap to be left

Master the fixed and sliding points to absorb expansion without ever shearing your screws.

Ventilated cladding: framing, air gap and fixings

Critical points of cladding: corners, window reveals and junctions

Treat lintels, thresholds and corners without interrupting water drainage or ventilation of the wall.

Ventilated cladding: framing, air gap and fixings

Metal cassettes: flatness tolerance, oil canning and layout planning

Avoid bulging of large sheet metal cassettes with rigorously calculated installation clearances.

Ventilated cladding: framing, air gap and fixings

Fibre-cement panels: low-dust cutting, edges and fixings

Cut the panels without harmful silica dust and durably protect the edges of machined cut ends.

Ventilated cladding: framing, air gap and fixings

Fire in ventilated facades: cavity barriers and height requirements

Fit compliant fire stop flashings to block the chimney effect without neutralising everyday ventilation.

Ventilated cladding: framing, air gap and fixings

Working from a platform on a façade: ground bearing capacity, harness and wind limits

Check the bearing capacity of the ground and anchor your harnesses to work safely from a platform.

Ventilated cladding: framing, air gap and fixings

Handling large panels: wind exposure, suction cups and two-person work

Secure large-format panels against wind loading with a suction-cup lifting beam during crane lifting phases.