Key takeaways
- The stability of the platform depends on the actual bearing capacity of the ground and on the correct blocking of the outriggers.
- Art. 82 LAA requires protective equipment to be used to prevent accidents during manoeuvres.
- A full harness with a short lanyard is mandatory to prevent any catapult effect from the basket.
- The wind speed permitted by the manufacturer is an absolute threshold for stopping work on the construction site.
Ensure ground bearing capacity and blocking before deploying the boom
On a ventilated cladding construction site, a mobile elevating work platform (MEWP) frequently replaces service scaffolding for installing bracket anchors, insulation panels and lightweight facings. The effectiveness of this set-up depends on the mechanical strength of the ground. Soft ground, backfilled after perimeter earthworks or soaked by bad weather, does not guarantee the stability of the wheels or the blocking pads. A loss of support several metres up increases the tilt angle of the boom and causes the machine to overturn immediately.
Positioning requires a prior survey of the manoeuvring area. Art. 68 OTConst provides that excavations, shafts and earthworks must be arranged so that falling or collapsing material endangers no worker. At the edge of an unshored excavation or a slope, the point load applied by a hydraulic outrigger can cause the edge of the bank to collapse if the safety distances are not strictly observed.
| Type of ground | Main risk | Mandatory support measure |
|---|---|---|
| Recent excavation backfill | Punching under load and differential settlement | Crossed hardwood planks or certified load-spreading plates |
| Bituminous asphalt in full sun | Binder creep under the hydraulic support pad | High-density synthetic blocking plates |
| Stabilised natural ground or concrete slab | Lateral sliding on a steep slope or smooth surface | Check the manufacturer's maximum slope and use locking wheel chocks |
| Proximity of buried services | Rupture of a pipe or cable chamber | Deviation of the trajectory and spacing of the support points |
Before raising the basket along the structural work, the operator checks the spirit level or the electronic inclinometer on the ground control panel. If the slope of the ground exceeds the tolerance prescribed in the machine's operating instructions, no levelling by forcing the jack stroke must be improvised. The ground must be prepared mechanically to obtain a perfectly level footing before any work begins.
Harness anchorage rules, whip effects and critical wind thresholds
Suva requires personal fall protection equipment (PPE) to be worn in articulated-boom or telescopic-boom elevating platforms. Art. 82 LAA requires the employer to take the necessary preventive measures that the state of the art allows to be applied, while workers use the personal protective equipment. The primary objective in a MEWP is not to cushion prolonged suspension after a fall, but to prevent ejection from the platform caused by a catapult effect, triggered by the basket jamming under a façade angle or by crossing a step in the ground.
- Connection to the certified anchor pointAlways attach the karabiner to the dedicated ring in the floor or on the lower structure of the basket, specifically marked with a capacity pictogram. Never attach your lanyard to the guardrail handrail or to the framework of the building under construction.
- Adjusting the restraintAdjust the lanyard with energy absorber so that it remains as short as possible. The operator must be able to handle screwdrivers and tools without ever being able to cross the top rail with their pelvis.
- Prohibition on climbing outDo not climb on the toe boards or rails to gain a few centimetres of reach. It is strictly forbidden to leave the raised platform to step onto the façade or a slab without a securing device validated by a specific safety plan.
- Checking wind exposureMeasure the wind speed using a portable anemometer held at basket level. Stop all manoeuvres immediately if the speed reaches the manufacturer's limit, generally set at 12.5 m/s (45 km/h).
The platform must remain a mobile workstation and not a means of heavy supply. The combined mass of the installers, screw bins, framework brackets and edge profiles must under no circumstances exceed the rated load of the basket. At the end of the shift or on a weather alert announcing gusts, lower the platform to the folded low position and lock access to the control panel.
Prohibited uses and actions forbidden from the basket
Using a mobile elevating work platform (MEWP) to install a ventilated façade is subject to strict kinematic constraints. All too often, the machine is mistakenly treated as a fixed workstation comparable to a scaffolding deck. This confusion leads to improvised manoeuvres that compromise the overall stability of the chassis or create major risks of installers being ejected.
- Leaning on or climbing the rails, mid-rails or toe boards of the basket to reach a bracket anchor or a load-bearing profile that is out of reach: both feet must remain in permanent contact with the floor.
- Using stepladders, steps, tool boxes or blocks inside the platform to raise the working plane.
- Leaving the raised basket to cross a bay, a balcony or to enter the structural work: the basket is not an access walkway, except under an exemption validated in the safety plan.
- Bracing the basket or its structure mechanically against the façade to try to cancel out swaying during drilling into concrete.
- Stopping the engines or deactivating the overload and tilt safety devices to force a hydraulic movement at the boom end.
Anchoring vertical T or L profiles places significant horizontal forces on the structure. When a façade installer pushes on a hammer drill or pulls on a torque wrench from the platform, the manual force applied produces a tipping moment towards the rear of the chassis. The permissible value for these manual forces is strictly capped by the machine's manufacturer, most often at a few hundred newtons.
| Installation operation | Kinematic risk on the platform | Preventive measure in workshop and on the construction site |
|---|---|---|
| Heavy drilling for chemical anchors or anchor studs | Horizontal reaction pushing the basket and setting the boom oscillating | Use sharp tooling, limit axial pressure, work in line with the boom |
| Levering a jammed composite or ceramic panel into position | Excessive pulling force that may exceed lateral stability | Release the substructure beforehand; never force from the platform |
| Pulling cables or ducts along the façade | Uncompensated oblique pull-out force | Fit independent deflection pulleys anchored to the structural work |
| Fixing the starter brackets on the underside of a slab | Upward vertical thrust that may unload the stop controls | Position the basket parallel to the work area, keep a free safety clearance |
Handling of cladding, tying-off and area coordination
Lifting ventilated façade components — primary framing, stone wool insulation and finishing facings — frequently turns the basket into a makeshift material hoist. Yet a platform is designed primarily to carry people and their hand tools. The safety directives require the supply flows to be strictly separated from the aerial workstations.
- It is strictly prohibited to suspend loads under the basket or outside the platform without a bracket or lifting hook built in and approved by the machine's manufacturer.
- It is prohibited to place large-format facing panels projecting over the guardrail: wind exposure is multiplied and the centre of gravity shifts instantly.
- Strictly observe the payload shown on the manufacturer's plate, deducting the actual weight of the two operators, their fall-arrest equipment and the tools carried on board.
- Temporary storage of insulation or substructures lying flat on the basket floor, without exceeding the height of the toe board and without blocking access to the emergency control panel.
The employer ensures that the general prevention rules defined in art. 82 LAA are applied, checking that the lifting equipment is suitable and that staff have received the required instruction. When heavy cladding elements such as fibre-cement, polished concrete or fired-clay panels have to be fitted, handling requires an auxiliary crane, a self-contained suction-cup lifting beam or an independent façade hoist. The platform is then used only for guiding and for tightening the fixing brackets.
- Marking off and neutralising the ground areaMark out on the ground an impassable safety perimeter covering the maximum working radius of the telescopic boom, plus a margin of two metres to guard against accidental falls of screws or pliers.
- Coordination with the site managerInform the other trades of the platform's movements along the bays. Make sure that no earthworks or excavation digging are planned in the immediate vicinity of the support areas during rotation.
- Managing ground-to-basket communicationMaintain permanent visual contact or a two-way radio link between the operator in the air and the ground person, who must be trained to activate the hydraulic emergency descent.
- End of shift and folding awayFold the arms in completely and lower the platform to the low transport position. Lock the battery isolator or remove the ignition key to prevent any unauthorised use.
Managing the unexpected on a platform: ground failure, gusts and emergency procedures
On a ventilated cladding construction site, working from a mobile elevating work platform (MEWP) exposes the façade installation team to changing risks. The condition of the ground, the weather and the mechanics of the basket can deteriorate rapidly during the day. Mastering emergency procedures ensures the safety of the installers and preserves the integrity of the structure.
If the wind exceeds the limit set by the MEWP manufacturer (generally 45 km/h) or if sudden gusts cause the structure to sway, stop installing the cassettes or large-format panels. Temporarily tie off any unfixed cladding elements to the substructure to avoid wind exposure. Lower the basket and take the equipment out of service.
- Power failure or basket stuck at heightStay calm and remain attached to the anchor point provided in the basket at all times. Never attempt to climb the platform structure or jump onto the façade.
- Activating the emergency descentThe ground operator, previously trained in the emergency manoeuvre of the MEWP concerned, uses the manual pump or the emergency descent controls on the chassis.
- Evacuation after an impact or a snagIf the platform catches on a fixed structure, stabilise the position without forcing the controls. Check that there are no cracks on the arms and fixings before any freeing movement.
Frequently asked questions
What should be done if the harness has been triggered following a fall out of the basket?
Do not attempt to climb back up alone without secure assistance. The ground team must activate the MEWP's emergency descent immediately to bring the basket down to the level of the suspended person, in order to avoid suspension syndrome. Alert the professional emergency services and replace the entire fall-arrest system (harness and lanyard) that has taken the impact.
Can a scissor platform be moved with the basket raised and cladding cassettes on board?
This manoeuvre is permitted only if the MEWP manufacturer's instructions expressly allow it and on perfectly level, stabilised ground. The loads must be properly distributed in the basket without exceeding the maximum rated capacity, and no cladding element may protrude beyond the guardrail or offer excessive wind exposure during travel.
How should you react if soft ground becomes heavily wet during the working day?
Stop all manoeuvres as soon as the ground becomes waterlogged. Bring the platform down to the ground, check the condition of the supporting base and reassess the load distribution. If the minimum spreading surface under the pads is no longer guaranteed, require the site manager to lay suitable metal or hardwood spreader plates before resuming installation.
Who is authorised to carry out the emergency descent manoeuvre from the ground?
Only a person named in the construction site safety plan, who has received specific instruction on the chassis controls of the MEWP in use, is authorised to carry out this manoeuvre. They must first make sure that the descent path of the boom or scissor presents no obstacle for personnel or the façade.
Texts and standards cited
- OTConst art. 29other fall protection measures
- LAA art. 82general prevention rules and duties of workers