🧱 CFC 221Blinds, shutters and solar protectionChapter 2 of 10 in the section

Fabric or slatted blind: what exposure and wind demand

This chapter enables you to specify and install external solar shading suited to the façade exposure and the local climatic loads. The façade installer learns to compare the thermal and mechanical performance of fabric blinds and linked-slat blinds, to apply the wind classes under SIA 342 and to set out the operating limits contractually with the client.

Key takeaways

  • The south façade makes the most of slat orientation, whereas the west calls for a low, continuous thermal barrier.
  • SIA 342 governs the wind classes required according to geographical zone and height.
  • A zip blind offers higher wind resistance but prevents fine modulation of the light flow.
  • The maintenance log distinguishes dusting of the slats from checking the seams and guide channels of fabrics.

Choosing between a vertical fabric blind and a linked-slat blind according to south or west orientation

The choice of an external closure is not reduced to a surface architectural preference. In French-speaking Switzerland, the angle of incidence of solar radiation requires a distinct geometric response between openings facing due south and those facing west. On a south façade, the sun peaks high during the warm months. The linked or tilting slat blind makes full sense there: the inclination of the profiled aluminium slats blocks the vertical incident rays while retaining diffuse natural light penetration and a visual link to the outside. Angular control thus allows dynamic adjustment of the combined solar factor without plunging the rooms into darkness, limiting the need for artificial lighting.

To the west, the physics of radiation changes radically. At the end of a summer day, the solar elevation drops below 30 degrees just when the outdoor air reaches its maximum temperature. The rays strike the glazing almost perpendicularly. To intercept this low-angle flux with slats, the user has to close the curtain completely, which cancels the advantage of the through view and turns the metal slats into heat exchangers close to the glass. The vertical fabric blind guided by a zip channel performs markedly better here. A technical textile made of PVC-coated glass fibres or high-tenacity polyester filters short-wave solar radiation before the glazing, avoids frontal glare and preserves optical transparency to the outside thanks to its controlled openness factor.

Comparative behaviour according to exposure and kinematics
Selection criterionLinked-slat blindGuided fabric blind (zip system)
Optimal orientationSouth and south-east façades with high sun pathWest and south-west façades with low sun
Glare controlFine modulation by rotating the slatsFixed, depending on the openness factor of the fabric
Wind exposure in serviceMedium to low depending on slat widthHigh thanks to continuous retention in the channel
Space required under the lintelHigh stacking requiring a large boxCompact roll-up in aluminium box

Wind resistance under SIA 342 and operating limits to be stated explicitly

Exposure to wind is the critical point of any external solar shading installation. SIA 342 defines the functional and mechanical requirements applicable to closures and blinds. Wind resistance is classified there according to standardised test levels, ranging from class 0 for an untested or undeclared product up to class 6 for the most stable fabrics. A standard 80 mm linked-slat blind guided by aluminium channels generally reaches wind class 2 to 4 depending on its manufactured width, which corresponds to a limiting service air speed often between 45 and 60 km/h. Beyond that, the risks of permanent slat deformation, tearing out of the zamak guide pins or extraction of the curtain from the channels become major.

External blinds must withstand the wind pressures and suctions prescribed for the site without permanent damage, and must be automatically retracted to a safe position before the operating limits are exceeded.

norme SIA 342

This mechanical constraint requires clear dialogue with the client before the quote is approved. Installing a slatted blind on a west façade in the Swiss Plateau or in an open position on the Lake Geneva basin implies frequent protective shutdowns: under storm gusts, the weather station orders the blind to retract for safety exactly when the western sun starts to overheat the rooms. If the customer wants uninterrupted thermal comfort in the afternoon, the vertical zip fabric is indispensable thanks to its continuous guidance, which withstands gusts above 80 km/h. Under art. 365 CO, if a circumstance jeopardises the proper or timely execution of the work, the contractor informs the client: warning in writing of frequent automatic wind-related retractions avoids complaints about summer discomfort.

  • Slat maintenance: six-monthly check of wear on the textile lifting tapes, lubrication of the axle bearings and dusting with clean water without alkaline detergent.
  • Fabric maintenance: annual check of the travel of the zip hem in the plastic damper insert and of the fabric tension when rolling up.
  • Cleaning the channels: removal of plant debris and mineral deposits in the guide profiles to prevent any kinematic jamming.
  • Checking the wind sensors: periodic check of the free rotation of the façade anemometers by the building's technical operator.

Thermal behaviour and radiation geometry according to exposure

The thermal design of a lightweight curtain wall or of joinery fitted in surface-mounted position requires the loads on the south to be rigorously distinguished from those on the west. On a south façade, the summer sun peaks at a high angular height above the horizon. Linked-slat blinds show their main technical advantage there: the setting of the slats makes it possible to block direct radiant gain while retaining diffuse penetration of natural light towards the ceiling and a visual link to the outside. Conversely, a non-perforated vertical textile blind creates a total mask that often forces the artificial lighting to be switched on at midday.

With a west exposure, the solar kinematics are radically different at the end of the day. The incident radiation strikes the glazing at a very low angle, at which the horizontal slats must be tilted to almost complete closure to prevent glare and overheating. In this closed configuration, the wind exposure of the slats becomes maximal at the precise moment when thermal breezes or summer storms rise over the Swiss Plateau or the Lake Geneva arc. The choice of a guided zip fabric blind ensures better aerodynamic stability in the lowered position, avoiding metallic rattling and untimely lifting cycles ordered by the weather station.

Technical trade-off of the solar shield according to the cardinal orientation of the opening
Performance criterionSouth exposure (solar noon)West exposure (afternoon / end of day)Recommended solution CFC 221
Angle of incidence of the raysHigh (60° to 65° at the summer solstice)Low and grazing (15° to 35°)Tilting slats to the south, zip fabric to the west
Overheating management (g_tot factor)Optimal through external slat reflectionSignificant greenhouse-effect risk before sunsetScreen fabric with low openness factor to the west
Visual comfort and glareExcellent modulation by tiltingDifficulty adjusting the slats without darkeningFabric with openness factor of 1% to 3% recommended
Vulnerability to thermal gustsModerate (breezes generally axial)High (western storms and façade shear)Sealed zip system on reinforced channels

Preventive maintenance, mechanical wear and contractual commitment

The durability of external solar shading equipment rests on the match between accessibility for maintenance and the kinematics of the moving parts. Slat blinds have a complex kinematic chain subject to mechanical wear: textile lifting tapes (texband), slat tilting ladders, zamak or polyamide guide pivots, and connecting pins. The combined action of atmospheric dust, de-icing salt carried by road spray and oscillation cycles under wind degrades the lifting tapes through continuous abrasion against the edges of the slat slots.

  • Twice-yearly check of the tension of the stainless-steel guide cables or of the wear of the neoprene seals in the channels of slatted blinds.
  • Checking the integrity of the lifting texbands: replacement is mandatory as soon as lateral fraying exceeding 1 mm is found, to avoid failure under load.
  • Cleaning micro-perforated technical fabrics with clean water plus a neutral detergent, without a high-pressure cleaner, which would destroy the surface coating.
  • Dusting and dry silicone lubrication of the zip-profile side channels to prevent the zip from jamming or the fabric from creasing on descent.

In legal and contractual terms, the façade installer's liability is assessed in the light of the duty to inform the client. Under art. 365 CO para. 3, if a circumstance jeopardises the proper or timely execution of the work, the contractor informs the client immediately. Specifying or installing a slatted blind without a reinforced channel on an upper-storey façade subject to downdraughts directly engages the contractor if the operating limits of the wind-resistance class were not notified in writing before the contract was signed.

Handling of claims, wind damage and operating disputes

On heavily stressed façades in French-speaking Switzerland, defects following westerly storms or foehn gusts immediately reveal design weaknesses. When aluminium slats deform, lifting tapes are severed or a motorised fabric suddenly comes out of its zip-system channels, the site manager must isolate the root cause before undertaking any repair. The technical distinction is made between a workmanship defect, an underestimation of the wind-resistance class during the initial sizing under SIA 342, and a failure of the automated building management.

If the designated substrate or the fixing conditions compromise the mechanical stability of the work, art. 365 CO requires the contractor to inform the client immediately. In the event of a proven loss without control fault, the client exercises the rights provided for in art. 368 CO to demand the repair of the damaged elements. The intervention then requires a rigorous method to prevent the damage from recurring:

  • Immediate securing of the area on the ground against falling metal components or detached slats.
  • Retrieval of the weather station's recorded data to establish the actual wind peak speeds at the time of the incident.
  • Checking the anchoring of the channels in the structural work or on the joinery frame, verifying the tightening torque and the condition of the plugs.
  • Checking the squareness of the box and the absence of parasitic friction on the fabric or the tilt cords.
  • Replacement of deformed parts with reinforced profiles or recalibration of the automatic retraction alarm threshold in the central building management system.

Frequently asked questions

What should be done if a linked-slat blind vibrates noisily and jams in moderate wind?

This jamming generally stems from a lack of parallelism of the channels or from insufficient expansion clearance in the reveal. The wind presses the slats against the guide lips, increasing friction until the descent stops. Check the internal spacing along the full height with a line, adjust the fixing shims under the channel and make sure the polyamide guide pins are neither crushed nor clogged with construction-site dust.

Why does a vertical zip fabric sometimes refuse to come down on a west façade?

The dynamic pressure exerted by the perpendicular wind tightens the fabric like a sail, jamming the half-zips in the neoprene dampers of the side channels. The tubular motor detects an obstacle through overtorque and stops the travel. The solution is to revise the programming to prohibit deployment when gusts exceed the nominal value of the system, or to replace the fabric with a micro-perforated matrix that reduces air thrust.

Is a single common wind sensor on the roof enough to manage fabrics and slats?

No. A single anemometer on the roof does not measure funnelling effects, building-corner turbulence or local suctions on leeward façades. Each orientation requires a specific sensor or a separate zone in the control unit. Vertical fabrics and slatted blinds have different wind-resistance classes, which require individual retraction settings to guarantee the integrity of the components under SIA 342.

Who bears the cost of a fabric torn during a sudden storm while the blind was deployed?

If the installation includes a functional automatic control compliant with SIA 342 and the weather records show wind peaks above the certified class of the product, the loss falls under force majeure or the owner's property insurance. If, on the other hand, the control unit was poorly calibrated by the installer or the reveal fixings failed below the contractual threshold, the repair falls directly on the installation company.

Texts and standards cited

  • SIA 342Blinds and closures - Requirements and tests for wind resistance and fitness for use
  • CO art. 365Defective material and ground, contractor's duty of immediate notification
  • CO art. 368Client's rights in the event of defects in the work (rescission, price reduction, repair)