Key takeaways
- A minimum slope of 5 degrees prevents water from standing on the aluminium flashing.
- Continuous side upstands prevent any infiltration behind the external thermal insulation or under the window frame.
- The drip nose must project beyond the finished face of the façade by at least 20 millimetres.
- Profiles longer than 3 metres require sliding joint covers to absorb expansion.
Drainage slope and drip nose: channelling water out of the reveal
The interface between the bottom rail of the window frame and the structural work is the most vulnerable point of the envelope under driving rain. Run-off water collected on the glazing and frame profiles is concentrated directly onto the metal flashing. SIA 331 sets the functional requirements for external windows and doors, requiring that surface water and pressure-equalisation water be drained to the outside without any risk of infiltration into the wall or the external thermal insulation.
A slope of at least 5 degrees (about 8 to 9 %) is required to ensure continuous gravity drainage, compensate for the installation tolerances of the masonry and overcome the surface tension of water. A flashing installed with insufficient slope encourages residual puddles, premature soiling and, in strong wind, water being driven back against the frame rail or under the sealing joints.
| Geometric element | Minimum required value | Technical function |
|---|---|---|
| Drainage slope | 5° (approx. 8.5 %) | Rapid gravity drainage to the outside |
| Drip projection | 20 mm | Drip kept clear of the finished face of the rendered or clad façade |
| Height of the rear upstand | 20 to 25 mm | Barrier against wind-driven water under the window frame |
| Side upstand (end cheeks) | 25 to 40 mm | Watertight connection into the reveal insulation |
The connection under the bottom rail is made by clipping or screwing into the groove provided on the window profile, always completed by a pre-compressed sealing tape or a continuous rain-screen membrane under the sheet. At the drip, the folded drip edge must project beyond the finished render or façade cladding by at least 20 mm. Without this overhang, run-off licks the façade, causing concentrated staining and damage to the render through freeze-thaw cycles.
Watertight side upstands and thermal compensation of long lengths
The flashing ends in contact with the reveal jambs are the site of the most recurrent defects. The classic mistake is to make a simple elastomeric sealant joint between the cut edge of the sheet and the façade render. Under temperature variations, differential expansion shears this bead within a few months, letting water infiltrate directly into the thermal insulation beneath.
- Installing the second waterproofing barrierLay a waterproofing strip or a watertight synthetic membrane on the sloped screed of the structural work before fixing the flashing, turning it up onto the reveal cheeks.
- Fitting the prefabricated side end piecesFit the sill with dedicated end pieces fitted with an integrated rubber seal or a sliding profile that absorbs the axial movements of the sheet.
- Embedding in the external insulationBuild the vertical upstands of the end pieces at least 25 mm behind the insulation board or under the render stop bead so that run-off water from the reveal always falls onto the flashing.
- Flexible sealing in the revealMake the final junction against the render using a watertight façade connection profile or a compressed impregnated foam strip of the appropriate class.
Aluminium has a linear thermal expansion coefficient of approximately 0.024 mm/(m·K). On a façade exposed to direct sun, the temperature of a dark powder-coated sheet frequently goes from -20 °C in winter to +80 °C in summer, i.e. a range of 100 °C. For a continuous 4-metre piece, the change in length reaches nearly 10 mm. If the flashing is rigidly restrained between the reveals, it buckles visibly, breaks the render and destroys the corner waterproofing.
When installing the guide rails of blinds or roller shutters, the flashing must never be mechanically blocked at the foot of the rail. The guide end must stop 5 mm above the sheet to preserve free thermal movement. As regards responsibilities on the construction site, art. 365 CO states that if the material supplied by the client or the site designated by the client is found to be defective, or if another circumstance jeopardises the proper execution of the work, the contractor must inform the client immediately. Finally, art. 229 CP punishes anyone who, intentionally or through negligence, breaches the rules of the trade when managing or carrying out a construction and thereby endangers the life or physical integrity of persons. A major infiltration weakening façade anchors or causing degraded components to fall directly engages the liability of the installers.
Junction under the bottom rail and end upstands according to SIA 331
The bottom rail of a frame and its sill connection are the most critical infiltration zone of the non-load-bearing envelope. According to SIA 331, the external metal flashing must ensure continuous water shedding without depending on a sealant joint alone exposed to the weather. The sill profile must engage under the frame rail in a clip-in groove or a milled slot fitted with a preformed sealing bead, observing a minimum vertical offset to stop water driven by wind pressure.
The side ends are the Achilles heel of window sills. A simple folded end without additional waterproofing inevitably leads to wetting of the external insulation or the masonry beneath. The end must incorporate a rigid termination profile, welded or crimped in the workshop, forming a watertight tray running up along the reveal cheek.
| Façade type | Side upstand height | Installation on the reveal | Management of residual infiltration |
|---|---|---|---|
| Rendered external insulation (render on insulation) | 30 to 40 mm | Render stop profile with pre-compressed compressible sealing tape under the upstand | Watertight corner connection tape integrated into the insulation system under the sill |
| Ventilated cladding (panels, timber or metal boards) | 25 to 35 mm | End slid behind the rain-screen membrane with minimum mechanical overlap | Drip water discharged to the front of the rain-screen membrane without contact with the upright |
| Exposed concrete reveal or facing masonry | 30 mm | Mechanical chase or cap profile with a sealing gasket at the bottom of the groove | Perimeter movement joint with closed-cell polyethylene foam backing |
Thermal compensation and management of long flashing lengths
Aluminium has a linear expansion coefficient of the order of 0.024 mm/(m·K). On a façade exposed to direct solar radiation in summer and then subjected to winter frost, the temperature gradient commonly reaches 80 kelvins (from -20 °C to +60 °C). For a single-piece flashing of 3 metres, the thermal movement therefore approaches 6 mm. Failing to compensate for this movement causes the sheet to warp, the outward slope to be lost and the reveal joints to tear.
- Splitting lengthsLimit the continuous length of a sill element to a maximum of 3,000 mm in lacquered or powder-coated aluminium. Make a clean cut leaving a free expansion gap of 5 to 8 mm between consecutive sections.
- Fitting the watertight sliding joint coverPlace an intermediate connecting profile (sliding joint cover or draining under-cover) under the junction. The joint cover must have its own drip and a shape ensuring mechanical guidance without hindering the longitudinal sliding of the two sill profiles.
- Guidance by movable fixing bracketsFit metal fixing brackets under the flashing at a maximum spacing of 600 mm. The brackets must allow the thermal sliding of the sill while ensuring it resists the pull-out forces due to wind and façade suction.
- Waterproofing under the sillMake a second watertight barrier under the flashing using an EPDM membrane or a bituminous strip bonded to the sloped screed, turned up onto the reveals and the bottom rail, before fitting the ventilated metal flashing.
If a sill is incorrectly installed and causes concealed infiltration that degrades the structure of the envelope, the client may hold the contractor liable under the Code of Obligations (CO). The acceptance of the sloped screed and of the barrier under the flashing must be formally recorded before the final installation of the metal elements and the jamb claddings.
Infiltration damage at the flashing: emergency diagnosis and repair
Infiltration under the window sill is the most frequent damage encountered by the façade installer. When traces of moisture appear on the interior reveal or in the external insulation under the bottom rail, the intervention requires methodical dismantling to isolate the origin of the defect without damaging the sound layers.
- Checking the side upstands and dismantlingRemove the aluminium flashing to check the integrity of the end pieces. A torn sealing gasket or an end without an expansion slide under the render causes infiltration from the first driving rain under wind pressure.
- Checking the actual slopeMeasure the actual slope with a spirit level or an electronic level. Settlement of the sill insulation or an accidental counter-slope retains run-off water and saturates the zone under the bottom rail.
- Rebuilding the watertight sub-sillLay or re-form the EPDM waterproofing strip or the bituminous sheet beneath. This membrane must turn up at least 20 mm against the reveal cheeks and be mechanically pinched under the frame before the metal profile is refitted.
- Refixing with thermal compensationFor lengths over 3 metres, split the flashing by incorporating a junction profile with a sliding joint cover and neoprene seal, in order to neutralise linear expansion stresses.
Where the work has an execution defect or the substrate supplied compromises the integrity of the connections, the contractor refers to the general obligations of the contract for work. According to art. 365 CO, if the material supplied by the client or the site designated by the client is found to be defective, or if another circumstance jeopardises the proper or timely execution of the work, the contractor must inform the client immediately. In the event of an unresolved technical dispute on driving-rain tightness according to SIA 331, a joint inspection record with the foreman and the site management is required before the façade build-up is closed.
Frequently asked questions
How should a flashing end embedded in a rendered external insulation be treated?
The metal end must never be rigidly set in the façade render. An end profile with an expansion slide, fitted with an integrated rubber seal or a pre-compressed compressible sealing tape, must be installed. This device allows the thermal elongation of the aluminium without cracking the finishing render or breaking the lateral tightness against driving rain, thus preventing direct infiltration into the insulation beneath.
What minimum slope should be given to the flashing when installing on the construction site?
The recognised rule of the trade and SIA 331 recommend a minimum slope of about 5 degrees (about 8 to 9 %) towards the outside to ensure rapid drainage of run-off water. A lower slope greatly increases the risk of water retention through surface tension, of soiling from dust deposits and of capillary backflow under the window profile in sustained frontal wind.
Why is waterproofing under the sill essential even with a new flashing?
The metal flashing forms the first visible barrier against the weather, but it never guarantees absolute long-term tightness, particularly at corners and connection joints. The waterproofing membrane beneath, turned up as a tray on the side reveals and under the bottom rail, is the mandatory second line of defence that drains to the outside any water infiltrating through capillarity, condensation or accidental defect.
From what length must an extruded aluminium flashing be split?
Once the length exceeds 3 linear metres, aluminium undergoes significant thermal expansion under solar radiation. The flashing must be split by an expansion joint fitted with a watertight connecting joint cover or a draining coupling piece. Fixing a one-piece length beyond this dimension leads to shearing of the mechanical fixings, tearing of the end upstands and recurrent infiltration.
Texts and standards cited
- norme SIA 331Windows and French windows: technical requirements, driving-rain tightness and connections to the structural work
- CO art. 365Material and ground: the contractor is responsible for the good quality of the material it supplies; if the material supplied by the client or the site designated by the client is found to be defective, or if another circumstance jeopardises the proper or timely execution of the work, it must inform the client immediately, failing which it bears the consequences (para. 3)
