Key takeaways
- Surface-mounted installation on the outside preserves the full glazing but creates a visible extra thickness on the façade.
- Installation under the lintel reduces the glazed height by 140 to 200 mm depending on the winding diameter.
- Hollow or deteriorated masonry requires chemical anchors with sleeves to anchor the guide rails durably.
- Airtightness of the box requires a pre-compressed sealing tape at the back and an airtight seal of the electrical penetration.
Choosing between surface-mounted and under-lintel installation according to the daylight opening
In thermal refurbishment or when replacing old wooden hinged shutters, fitting an external aluminium monobloc unit avoids heavy internal chasing and removes the need to replace the existing windows. In the building stock of French-speaking Switzerland, the choice of installation method directly determines the amount of residual natural light and the external appearance of the building. Three technical configurations are commonly used on construction sites: under-lintel installation with outward winding, under-lintel installation with inward winding, and surface-mounted installation directly on the façade masonry. Each one represents a specific geometric compromise between the footprint on the glazed surface and architectural discretion.
| Installation method | Impact on daylight opening | Façade appearance | Installation specifics |
|---|---|---|---|
| Under-lintel installation (outward winding) | Loss of 140 to 180 mm at the top transom | Box housed in the reveal, underside visible from the street | Guide rails fixed directly in the cheeks of the masonry reveal |
| Under-lintel installation (inward winding) | Loss of 140 to 205 mm on the opening height | Back face of the box aligned with the outer face of the façade | Curtain set away from the glazing, guide rails offset towards the outside |
| Surface-mounted installation on the façade | No loss of daylight opening, glazing fully clear | Box projecting from the render, relief visible in profile | Guide rails fixed to the façade on either side of the opening |
Loss of daylight opening is the critical point of under-lintel installation. In older dwellings with windows of modest height, a box of 150 to 205 mm installed under the soffit of the lintel considerably reduces the active glazed area and hides the upper part of the opening sashes. Conversely, surface-mounted installation moves the box entirely above the opening, thus preserving all the light and the interior field of view. This variant, however, creates a visible projection on the façade plane, altering cast shadows and the relief of the building. To reduce this architectural impact, installers choose boxes with a 45-degree chamfer or a quarter-round face, powder-coated in the exact shade of the window profiles or the sheet-metal work to ensure a discreet integration.
Mastering anchoring on old masonry and airtightness of the shutter box
Installing a renovation roller shutter requires a rigorous survey of the existing structural work. On buildings in French-speaking Switzerland predating the 1980s, the masonry frequently shows major inconsistencies: fragile perforated clay bricks, friable molasse rubble stones, degraded mortar joints or blown façade render. The craftsman applies the rules of the trade on mechanical stability to take up the permanent loads and the wind thrust transmitted by the curtain to the guide rails. Fixings must be strictly suited to the substrate: chemical injection sleeves in perforated brick, or extended multi-expansion anchors passing through the detached render to find a solid hold in the load-bearing masonry. For work on upper floors, façade scaffolding must be erected as soon as the fall height exceeds 3 m in accordance with art. 26 OTConst.
Beyond mechanical strength, the airtightness of the box and its connections determines the thermal performance of the construction junction. A poorly sealed external box creates parasitic air paths that cool the lintel or enter the dwelling through the control openings. The connection between the back of the box and the masonry receives a pre-compressed impregnated foam tape of suitable class, reinforced by an extruded elastomer sealing joint with backing rod at the top to shed driving rain. The wall penetration for the motor's electrical cable or the control rod requires a continuous airtight seal using a watertight cable gland or a specific sealant, avoiding any thermal bridge through air infiltration.
- Substrate preparation and setting outCheck that the reveals are plumb and that the render is sound. Remove rough spots from the masonry and drill without hammer action in hollow materials so as not to destroy the internal webs of the bricks.
- Anchoring and packing of the guide railsInsert the anchors according to the nature of the substrate. Align the guide rails rigorously with a plumb line or laser to guarantee perfect parallelism and prevent any jamming of the curtain during operation.
- Perimeter sealing of the boxApply a continuous pre-compressed tape between the box and the masonry. Form the upper sealant bead to divert run-off water, without blocking the water drainage slots located under the guide rails.
- Sealing of the control penetrationDrill the cable passage with a downward slope towards the outside to prevent gravity infiltration of condensate. Fit an elastomer collar on the inside and inject a neutral sealant around the conduit.
Installation comparison: the three installation methods and the impact on the daylight opening
In façade renovation without reworking the structural work, fitting an external roller shutter requires a geometric trade-off between light input and visual alteration of the front. Three integration arrangements coexist on construction sites: surface-mounted installation against the external masonry (above the opening), under-lintel installation with outward winding, and under-lintel installation with inverted inward winding (curtain descending flush with the joinery). Each one modifies the interaction between the guide rails, the reveal and the existing frame, directly determining architectural integration and the occupants' comfort of use.
| Installation configuration | Loss of daylight opening | Façade appearance | Construction site points of attention |
|---|---|---|---|
| Surface-mounted on the outside of the façade | None: the box is fixed above the lintel and the guide rails in the external reveal. | Box projecting from the outer face; visual break on a smooth, uninsulated façade. | Fixing into the load-bearing lintel or the masonry above; upper sealing joint exposed to the weather. |
| Under the lintel, outward winding | Maximum: the box hides the top of the glazing over its full height (135 to 205 mm). | Flat façade preserved; the box stays aligned under the lintel within the thickness of the reveal. | Window handle or tilt-and-turn sash liable to hit the underside of the box. |
| Under the lintel, inverted winding | Intermediate: the curtain runs along the glass, the box is hidden from the inside by the frame. | Bevelled or rounded face of the box facing the street; discreet integration. | Minimum distance to be observed from the external handle or the fittings of the existing window. |
Aesthetic integration on old façades in French-speaking Switzerland requires rigorous harmonisation with the existing architectural elements. The choice of box profile (45° chamfer, square or quarter-round) must work with the mouldings, molasse surrounds, corner quoins or cornices. Powder-coating of the folded or extruded aluminium sheets preferably matches the colour of the joinery or the mineral render according to municipal planning requirements. While surface-mounted installation on the outside creates a pronounced relief casting a shadow on the joinery, it frees the opening completely. Conversely, under-lintel installation preserves the flatness of the façade face but reduces the glazed area, which penalises rooms of shallow depth or those facing north.
Airtight connection of the box and anchoring on heterogeneous masonry
The air and water tightness of a renovation box installed from the outside determines the overall thermal performance of the opening. Although the box is outside the heated envelope, the wall penetration needed for the control cable or manual operation, as well as the junctions between guide rails and masonry, are critical zones for parasitic air infiltration and moisture. Using impregnated pre-compressed tapes and elastomer gaskets prevents air whistling in strong wind, stops driving rain from reaching the old timber or PVC frame, and prevents condensation pockets forming around the window perimeter.
- Preparation and remediation of the revealBrush and dust off old masonry of rubble stone, sand-lime brick or concrete. Repair spalled reveal edges with quick-setting mortar to provide a flat, sound seat for the guide rails and the box.
- Application of the sealing gasketsStick a driving-rain-tight pre-compressed sealing tape to the back of the guide rails and on the top flange of the box before fixing. Make sure the expansion range suits the out-of-plumb of the old reveal.
- Mechanical fixing without hammer actionDrill without hammering in hollow or fragile substrates to avoid bursting the cells of the clay brick. Insert long expansion anchors or injection sleeves with reactive resin in soft stone.
- Airtight sealing of the penetrationDrill the cable passage with a downward slope towards the outside. Fit an EPDM rubber sleeve at the outlet and seal the perimeter with a neutral hybrid polymer sealant.
Art. 364 CO governs the obligations of the contractor and subjects his liability to the same rules as that of the employee. The company must therefore adapt its equipment and fixings to the particular constraints of the existing structure. On composite masonry or deteriorated old render, the anchoring of the guide rails must withstand wind pressure without cracking the mineral facing. Using a torque screwdriver avoids crushing the packers needed to compensate for the out-of-plumb of the opening, guaranteeing smooth running of the curtain and even compression of the sealing joints.
Handling unforeseen events and non-conformities on old masonry
On a renovation construction site, installing a surface-mounted external roller shutter frequently reveals defects as soon as the substrate is drilled. When old masonry — friable perforated clay brick, limestone rubble or crumbling render — refuses standard mechanical anchoring by expansion anchor, the fastener spins freely or bursts the render. The classic mistake is to force the fixing or to multiply blind drill holes along the guide rails. The team leader immediately stops installing the element and switches to chemical anchoring with an injection sleeve of suitable length, able to reach sound material in the heart of the load-bearing wall without creating spreading stress.
The other recurring pathology concerns parasitic air and moisture infiltration at the connection between the box and the lintel. The absence of continuous airtightness turns the box into a condensation trap, causing mould on the interior reveal or draughts through the operating openings. If the pre-compressed sealing tape was not applied before fitting the box, applying a simple sealant bead on the surface is a defect that will age prematurely under thermal cycling. The only lasting correction requires removing the shutter to interpose a self-adhesive, breathable rain-screen membrane, carefully connected to the structural work, backed by a lacquered aluminium sheet flashing to shed dripping water forwards.
Finally, for any access on the façade as soon as the fall height exceeds 3 m, assembly requires secured equipment in accordance with art. 26 OTConst, prohibiting acrobatic work on a ladder to fix boxes and guide rails.
Frequently asked questions
How to correct a box that accidentally encroaches on the existing glazing?
If the box comes down below the upper frame and eats into the glazing, the error stems from an incorrect measurement of the lintel height. The correction requires either shifting the installation upwards to a fully surface-mounted position on the façade above the opening, or interposing a lacquered widening profile to hide the visible edge, provided that the curtain remains guided in the axis of the guide rails.
Which anchoring to choose on a very friable aerated concrete lintel?
Hammer-in anchors or traditional metal anchors crush the material. The technical rule requires chemical anchoring with vinyl or styrene-free epoxy resin, injected through a sleeve suited to hollow materials. This resin spreads evenly in the cells without generating radial pressure on the substrate, thus ensuring resistance to pull-out forces in strong winds.
How to ensure the airtightness of the wired control passage?
The drilling through the masonry to route the motor cable to the inside is a major thermal and air leak. The installer must insert a watertight sleeve and seal both ends with an adhesive airtightness collar or a specific expanding elastomer paste. The use of ordinary polyurethane foam is prohibited because of its lack of lasting elasticity.
How to handle the appearance of the guide rails when the façade render is uneven?
On a bumpy mineral render, rigid guide rails leave uneven gaps against the wall. A compressible impregnated foam tape should be applied at the bottom of the groove before tightening, then a finishing joint made with hybrid elastomer sealant tinted to the RAL colour of the façade, carefully smoothed with a finger wetted with smoothing agent to hide imperfections.
Texts and standards cited
- OTConst art. 26façade scaffolding in building construction work: façade scaffolding must be erected as soon as the fall height exceeds 3 m; the top guardrail must project at least 80 cm beyond the edge of the highest area presenting a risk of falls (100 cm if the guardrail is less than 60 cm from the edge) (para. 2).