External windows and doors: installation and junctions: the execution standard

Intended for team leaders, site foremen and project managers working on the building envelope (CFC 221), this section covers the installation and connection of external joinery within the structural work. It details compliance with the principles of air tightness and driving-rain tightness under standard SIA 331 and standard SIA 343, from taking measurements in the opening to finishing sills and adjusting the hardware.

  • 10chapters
  • 22 000words
  • 6sections in the training course
  • 60chapters in total

Key values to remember 4

art. 23 OTConst

2 m

Fall height beyond which a perimeter guardrail is mandatory

art. 26 OTConst

3 m

Fall height requiring facade scaffolding for building construction work

OTConst

100 cm

Minimum height of the top rail of a perimeter safety guardrail

OTConst

15 cm

Minimum height of the toe board at the foot of the perimeter guardrail

Technical scope and limits of intervention

The installation of an external window or door is the critical point of continuity between the masonry or frame and the thermal insulation plane. The role of the facade installer and the joiner is to ensure the full transmission of mechanical loads (self-weight, wind loads in pressure and suction according to standard SIA 331) while making the physical junctions required for the overall performance of the envelope.

  • Included in this section: Dimensional survey of the rough openings, choice of thermal alignment within the thickness of the wall, perimeter mechanical fixings (screws without plugs, angle brackets, jacks), thermal and acoustic insulation of the joint, perimeter sealing barriers (interior vapour-control membranes, backing rods, impregnated pre-compressed tapes, aluminium flashings with sealed upstands), door thresholds according to standard SIA 343 and sash adjustments.
  • Excluded from this section: Metal mullion-and-transom curtain walls and bonded external glazing (which fall strictly under CFC 215), manufacture of the primary timber frame (CFC 214), direct bituminous or synthetic waterproofing connections on flat roofs (CFC 226) and interior fire-rated door sets (CFC 273).

The safety requirements for workers at facade openings demand strict measures. Working near floor openings without a guardrail or without compliant scaffolding makes site supervision directly liable.

Logical installation sequence and chapter structure

The work follows a strict chronology that must be respected to prevent water-ingress damage and functional non-conformities. Ten chapters guide the teams step by step.

  1. Phase 1: Diagnosis, setting out and mechanical fixingChapters D2-01 to D2-03 cover minimum measurement-taking and masonry tolerances, the thermally aligned positioning of the frame within the thickness of the facade insulation, and then the sizing of the fixings according to the spacing required to withstand wind pressure and suction without deforming the jambs.
  2. Phase 2: Continuity of the three barriers and singular pointsChapters D2-04 to D2-06 detail the execution of the three-barrier sealing, the geometry of the metal sills (minimum slope, watertight end upstands and absorption of thermal expansion), as well as the critical treatment of watertight accessible (PMR) thresholds for entrance doors.
  3. Phase 3: Mechanical adjustment, protection and specific refurbishment casesChapters D2-07 to D2-10 deal with the three-dimensional adjustment of tilt-and-turn hardware to achieve calibrated seal compression, measures to protect lacquered or anodised surfaces from mortar, decision criteria in refurbishment (complete removal versus retaining the existing frame) and the safety closure of open openings during removal.

Coordination between trades (masonry, plastering, window installation and sheet-metal work) determines the success of the assembly. Forgetting a sealing strip under a sill or a poorly clamped fixing compromises the work from the first bad weather.

📘 Chapters in this section 10

External windows and doors: installation and junctions

Survey the opening before ordering: dimensions, plumb and installation clearances

Avoid manufacturing errors by measuring the actual diagonals, out-of-plumb deviations and sealing gaps.

External windows and doors: installation and junctions

Where to place the window within the wall thickness: flush with the insulation or set back

Eliminate thermal bridges by aligning the glazing with the facade thermal insulation plane.

External windows and doors: installation and junctions

Fixing the window frame: brackets, structural screws, spacing and transfer of wind loads

Ensure resistance to strong winds through correct fixing spacings and regulation corner packing.

External windows and doors: installation and junctions

Window-to-masonry junction: airtight on the inside, vapour-open on the outside

Master the principle of interior air tightness and exterior vapour permeability.

External windows and doors: installation and junctions

Window sill: slope, flashing, side upstands and expansion joints

Protect the window sill from water ingress by incorporating slope, watertight side upstands and freedom for thermal expansion.

External windows and doors: installation and junctions

Entrance door: an accessible threshold without sacrificing watertightness

Build thresholds without a step while guaranteeing flawless external drainage.

External windows and doors: installation and junctions

Adjusting a tilt-and-turn window: seal compression, plumb and locking points

Adjust the perimeter compression of the sash seals to stop draughts and whistling.

External windows and doors: installation and junctions

Protecting installed joinery: films, mortar splashes and final cleaning

Protect powder-coated finishes from mortar splashes and aggressive cleaning acids.

External windows and doors: installation and junctions

Replacing a window in renovation: full removal or retained frame

Choose wisely between complete removal of the frame and overcladding to preserve the overall insulation.

External windows and doors: installation and junctions

The open opening during installation: protect the void before removing the old window

Immediately secure openings against falls and bad weather during the replacement of the joinery.