Key takeaways
- Lay the sheets horizontally from the bottom upwards with a minimum overlap of 100 millimetres.
- Staple only in the overlap zones or under the vertical battens to preserve watertightness.
- Immediately press down every joint with a certified acrylic adhesive tape that is compatible with the substrate.
- Replace any sheet degraded by ultraviolet light as soon as the manufacturer's prescribed time limit has been exceeded.
Laying direction, overlaps and bridging of fixings
Laying a rainscreen membrane over thermal insulation or a bracing panel follows a rigorous hydraulic lapping logic. The roll is always unrolled horizontally, from the base of the façade to the top. This arrangement ensures that run-off or condensation water flowing in the ventilated cavity is continuously directed outwards without ever finding a leading edge that could guide moisture towards the fibrous insulation.
- Hydraulic lapping
- Geometric overlap principle whereby the lower edge of an upper sheet covers the edge of the lower sheet, preventing infiltration by gravity.
| Façade configuration | Minimum horizontal overlap | Minimum vertical overlap | Joint treatment |
|---|---|---|---|
| Closed tongue-and-groove cladding | 100 mm | 150 mm | Single-sided adhesive on overlap |
| Open-joint cladding (gaps of 10 to 20 mm) | 150 mm | 150 mm | Double adhesive taping or black polyurethane adhesive |
| Area exposed to prevailing winds or altitude > 800 m | 150 mm | 200 mm | Systematic windtight adhesive bonding |
The temporary fixing of the rainscreen membrane is carried out with wide-crown flat staples in galvanised or stainless steel. Nails or staples must never be scattered across the middle of the panel: each penetration is a potential water path before the cladding is closed. Stapling is strictly confined to the overlap strip concealed by the upper sheet, or placed directly on the line of the future vertical ventilation counter-battens or rafters.
Treating the joints requires high-performance acrylic adhesive tapes designed for exterior use. The façade installer cleans the surface to remove any trace of sawdust or residual moisture before applying the tape. Manual pressing with an application roller or a semi-rigid spatula is mandatory in order to flatten the viscoelastic acrylic adhesive and activate bonding under mechanical pressure.
Ultraviolet resistance, construction-site weather and repair of tears
Standard rainscreen membrane is not designed to act as a permanent covering or a final façade. Its polymer composition, generally a three-layer polypropylene non-woven with a microporous film, undergoes rapid photo-oxidation under direct solar radiation. Once the molecular chains break, the membrane loses its elongation at break and its residual water column collapses, making the building permeable to the weather.
In the specific case of open-joint cladding, the requirements are radically different: ultraviolet radiation filters permanently through the gaps between the slats throughout the life of the structure. It is then mandatory to install a heavy-duty membrane coated with polyurethane or polyacrylic, mass-tinted in a stable black, specifically approved for permanent exposure with strictly defined gap widths.
- Dusting and degreasing of the substrateRemove all dust, sawdust or loose particles dry around the tear within a radius of 150 millimetres.
- Treatment of isolated perforationsCover the hole with a UV-resistant waterproof adhesive patch extending at least 50 millimetres beyond the damaged area on each side, then press down firmly.
- Repair of a large linear tearSlide a new piece of rainscreen membrane under the tear, overlapping by 100 millimetres all round, bond the edges and secure the outer face with a sealing adhesive tape.
- Replacement of a sheet degraded by the sunRemove the ventilation battens, insert a new sheet under the upper sheet by 100 millimetres and bond the lower edge with continuous adhesive bridging.
The contractor is responsible for the good quality of the material he supplies; if the material supplied by the client or the site designated by him is found to be defective, or if another circumstance jeopardises the proper or timely execution of the work, he must inform the client immediately, failing which he bears the consequences (para. 3).
art. 365 CO
Mechanical continuity: stapling, bridging and special connections
The temporary fixing of the sheet to the rafters or to the solid-timber support panel is carried out exclusively with wide staples in stainless steel or heavy galvanised wire. To prevent any tearing off under the effect of corridor wind or dynamic suction before the counter-battening is tightened, the staples must be driven only within the upper overlap zone, marked at the factory. A staple placed in the middle of the panel passes through the waterproof film and becomes a direct infiltration path as soon as run-off water flows over the outer face.
The bonding of the longitudinal and transverse overlaps determines whether the thermal insulation is protected against parasitic air flows and water forced back under pressure. Pure solvent-free acrylic adhesive tapes with a split peelable liner are required on clean, dust-free surfaces free of frost. On winter construction sites in French-speaking Switzerland, when the substrate temperature falls below the guaranteed adhesion range, applying a fluid bonding primer or using a deformable bituminous connection tape remains mandatory to avoid delamination at the first thaw.
| Special zone | Sealing material or product | Tool and pressing method | Critical check point |
|---|---|---|---|
| Sheet-on-sheet overlap | Single-sided reinforced acrylic adhesive tape (minimum width 60 mm) | Firm pressing with a hard polyurethane roller | No transverse fold and continuity of the film over the edge |
| Façade base on concrete plinth | Butyl sealing tape or hybrid polymer with primer | Pressed under a screwed mechanical clamping batten | Upstand of 150 mm above the finished ground level |
| Connection to window pre-frame | Pre-formed corner sleeve or adhesive elastomer tape | Manual pressing without excessive stretching of the adhesive mass | Shingle-style overlap running down towards the outside of the reveal |
| Penetration of a framing bracket | Flexible EPDM sleeve or thixotropic hybrid sealant-adhesive | Smoothing with a spatula with continuous peripheral sealing | Drainage slope directed away from the penetrating rod |
Mechanical damage, sun damage and re-lining procedures
The solar radiation resistance period stated on the data sheets corresponds to ageing under direct exposure without degradation of the water column. On construction sites where the laying of the outer cladding is delayed, exceeding the permissible time limit of 3 to 4 months for standard membranes with closed joints, or 6 months for heavy fabrics treated for open joints, irreversibly alters the polypropylene fibres. The membrane becomes brittle, powdery to the touch and loses its cohesion under the combined action of ultraviolet light and radiant heat trapped under sheeted scaffolding.
- Assessment of the damaged substrateCheck the mechanical strength of the sheet by pulling lightly by hand on an uncovered edge. If the fabric frays or if the intermediate microporous film separates from the non-woven web, the material has been burnt by UV and can no longer serve as a waterproofing layer.
- Cutting out and removing the damaged areasOpen up the torn or sun-baked portions with a hook-blade cutter, making straight cuts. Never attempt to close a tear of more than 50 mm with simple adhesive tape without a rigid backing underneath.
- Inserting the re-lining pieceSlide a piece of new membrane under the existing upper sheet by at least 150 mm to restore gravity water shedding. The piece must extend sideways beyond the damaged area by at least 100 mm on each side.
- Clamping and peripheral bridgingFix the piece temporarily with double-sided acrylic adhesive on the underside, then bond the perimeter with an external bridging tape pressed down under strong pressure. Refit the counter-battening to restore the mechanical clamping.
In the event of tears caused by the passage of scaffolding anchors or the handling of sub-structures, the repair must be carried out before the ventilated cavity is closed. Every hole cut for a cladding bracket must be edged with a bead of waterproof adhesive or clamped under a profiled cellular rubber seal, preventing air infiltration from bypassing the thermal insulation layer through wind suction.
Managing exposure damage and repair procedures
On a ventilated façade construction site, the rainscreen membrane provides the temporary watertightness of the structure while protecting the thermal insulation from the weather. When the schedule slips and the laying of the outer cladding is postponed, the membrane undergoes accelerated ageing under the action of ultraviolet radiation. Exceeding the permissible exposure time guaranteed by the manufacturer leads to irreversible degradation of the polymer binder, a loss of resistance to liquid water and mechanical weakening under wind pressure.
- Recording the findings and stopping progressRecord the zones exposed beyond the time limit or showing the beginnings of tearing at the staples and the ventilation battens. Enter the initial laying dates in the site diary.
- Stripping and re-liningRemove the counter-battens if necessary. Lay a new continuous waterproof membrane over the burnt sheet, observing a downward-facing horizontal overlap of at least 100 mm.
- Bonding under pressureApply an acrylic adhesive tape specific to rainscreen membranes onto a dry, dust-free substrate, then press down firmly with a roller to ensure the molecular cohesion of the adhesive.
- Treatment of perforationsSeal every perforation made by a cross-member or bracket leg with a flexible sealing sleeve or a thixotropic hybrid polyurethane adhesive suitable for exterior use.
In accordance with art. 365 CO, if a circumstance jeopardises the proper or timely execution of the work, the contractor must inform the client immediately. In the case of an accidental tear of less than 50 mm, a patch of the same composition overlapping by 150 mm and bonded onto a cleaned substrate is sufficient. For a wider tear or a delamination caused by ultraviolet light, the entire sheet must be replaced between two framing uprights.
Frequently asked questions
How should a tear in the rainscreen membrane at a fixing bracket be treated?
The repair requires a patch cut from the same membrane, overlapping by at least 100 mm around the perforation. The upper edge of the piece is slid under the existing rainscreen membrane or under the profile to form a water-shedding lap. The perimeter is then bridged with an exterior-grade cloth-reinforced acrylic adhesive tape, applied on a clean, dry substrate, then pressed down firmly with a rigid roller.
What is the maximum exposure time of a standard rainscreen membrane without cladding?
Most flexible membranes allow ultraviolet exposure of six to twelve weeks according to the manufacturers' data sheets. Reinforced rainscreen membranes intended for open-joint cladding withstand up to six months of direct exposure, or even permanent exposure if the percentage of openings remains below 20%. Beyond these deadlines without covering, mechanical strength and watertightness under driving rain are no longer guaranteed.
Why must exposed stapling without clamping battens be prohibited?
An uncompressed metal staple tears the fabric under wind suction and creates a direct infiltration point for run-off water. Temporary fixing with staples must be confined to the overlap zones, which will then be concealed and bonded. The final fixing must be ensured by the clamping of the mechanical ventilated counter-battening, laid with a nail-sealing tape under each timber batten.
Can the rainscreen membrane be used as weather protection on a temporary roof?
No, a wall rainscreen membrane for façades is designed for vertical water flow and does not have the hydraulic resistance required for a roof, even a steeply pitched one. On a temporary roof, standing water and snow loads cause immediate leaks at the connections. Only roofing underlays complying with the specific plumbing and roofing standards can fulfil this temporary role on a construction site.
Texts and standards cited
- CO art. 365material and ground: the contractor is responsible for the good quality of the material he supplies; if the material supplied by the client or the site designated by him is found to be defective, or if another circumstance jeopardises the proper or timely execution of the work, he must inform the client immediately, failing which he bears the consequences (para. 3).